CONTACT INFORMATION:
View contact information...
OBJECTIVE
To perform my job in a positive and timely manner, with safety, quality and teamwork.
EXPERIENCE
H.K.A. Inc./CH2MHILL/U.S. Army Corp of Eng.
QA/QC/ Safety Technician
New Orleans,La.
10/05 to present
Responsible for QA/QC on debris removal in New Orleans disaster sites along with contractor safety
MMR/Radon
Commissioning Technician
Malabo, GNQ
February 2005 - 3 2005
- This job consisted of commissioning a grass roots LNG plant to include fans, piping, oil flush on compressors, and line marking.
TMP/Hudson, Newport Chemical Weapons Depot
Commissioning Field Technician
Newport, IN, USA
December 2003 - 12 2004
- Job consists of working with I/C, Electrical, and Piping along with my main skill as Millwright to commission the equipment needed for the destruction of chemical weapons agent, for the U.S. Army. Equipment to include pumps, compressors, fans, filtering systems.
Turner Industries
Millwright
Baton Rouge, LA, USA
July 2003 - 9 2003
- Job to install pumps, compressors, and all other rotating equipment.
Offshore Commissioning Group
Commissioning Tech
Corpus Christi, TX, USA
March 2003 - 6 2003
- This was a position of commissioning and start-up of reciprocating compressors, high pressure pumps, power generating equipment, and some support equipment, this included oil flush, seal installation, and equipment leveling and alignment.
Alstom Power Services
Millwright
New Roads, LA, USA
February 2003 - 3 2003
- Repairs to ball mill and all coal crushing equipment on #1 and #2 boilers at Big Cajun Power Generating Plant.
Turner Ind.
Compressor Supervisor
Baton Rouge, LA, USA
October 2002 - 2 2003
- This job consist of compressor troubleshooting and repairs on intergal, screw, and centrifugal type compressors. This job also requires the repairs on all other plant equipment such as pumps, turbines, engines. and material handling equipment.
Great Lakes Carbon
Maintenance Tech
Baton Rouge, LA, USA
July 2002 - 9 2002
- The position here is of daily maintenance in a calcined coke facility to include kilns, conveyor, and all other material handing equipment. At this jobsite heavy equipment were also preformed as well as light electrical troubleshooting.
T.I.C./W.P.E.C
Millwright
Bogalusa, LA, USA
December 2001 - 5 2002
- This was a grass roots project of complete assembly of a combined cycle power plant, there were two gas turbines, one steam, these were G.E. machines. The work involved was total assembly of the steam turbine and generator, to include rigging and all alignment involved, on the gas turbines we set sole plates leveled and aligned the machines and coupled them up.
Master Maintenance/Georgia Gulf
Millwright
Baton Rouge, LA, USA
August 2001 - 12 2001
- Troubleshooting and repair of all rotating equipment, such as pumps, fans compressors, blowers and turbines on a daily maintenance routine.
Turner Ind./BASF
Millwright/DMS Mechanic
Baton Rouge, LA, USA
February 1996 - 7 2001
- This was a situation of working in a self directed, self-supervised, multi-crafted, multi-skilled work force. I was required in my rotation of lead man to do the planning, scheduling, in-house and outside purchasing, as well as coordinate work with plant operations. The other time was spent working in daily maintenance to include my primary skill of Millwright and secondary skills of piping and electrical work. The last fourteen months were working in a QA/QC team, my responsibilities were rotating equipment installation and start up, working on through daily operational maintenance. The routine equipment repairs here were pumps, motors, steam turbines of various sizes, fin fans, compressors both reciprocating and centrifugal and piping and electrical repairs.
Baton Rouge Machine Works
Field Forman, Field Services
Baton Rouge, La.,
September 1995 - 2 1996
Field machine work with portable lathes, boring equipment, milling machines, also service type maintenance and equipment installation on pump compressors turbines, refiners, motors, and gear trains.
Jacobs Eng./ICI Americas
Millwright/Supervisor
Baton Rouge, LA, USA
January 1992 - 9 1995
- Quality Control of rotating equipment in the construction phase of this plant, through commissioning and start up of all systems. At this point daily maintenance was the priority. Troubleshooting problems with all types of canned pumps as well as steam, centrifugal and positive displacement type pumps. Other types of equipment were blowers, air conveyors, bottle filling equipment, vacuum pumps and packaging equipment.
Jacobs Eng./Ciba
Millwright General Forman
Baton Rouge, LA, USA
October 1990 - 12 1991
Installing mechanical equipment to include, pumps, agitators, filter press, ice makers, material handling and packaging equipment. This included startup and maintenance of this equipment.
Turner Ind./James River Paper Mill
Millwright
Baton Rouge, LA, USA
April 1990 - 4 1990
Installing ground wood mill, wood grinders, wash pumps and 8000 hp. pulp grinders.
Process Services Inc.
Millwright
Baton Rouge, La.,
December 1989 - 3 1990
Equipment installation of dryers, blowers, pumps, grinders, and compressors.
Baton Rouge Machine Works
Millwright Field Services
Baton Rouge, La.,
March 1989 - 11 1989
Field service work with portable lathes, milling machines, boring equipment, also maintenance and installation.
Jacobs Eng./EXXON Chemical
Millwright Supervisor
Baton Rouge, LA, USA
November 1988 - 2 1989
- Total revamp of rubber finishing plant. Equipment repaired or replaced included extruders, vibrating conveyor, expanders, pumps, blowers, air conveyors. This was job of working very close with the client to insure a quality job because ongoing engineering changes.
Jacobs Eng./Ciba Gigey
Millwright General Forman
Baton Rouge, LA, USA
October 1987 - 10 1988
- Total change over of old unit to allow multi-purpose product use equipment installed or modified to include pumps, blowers, compressors, refrigeration and product drying equipment.
Jacobs Eng./TEXACO Refinery
Supervisor
Baton Rouge, LA, USA
January 1987 - 10 1987
Turnaround and construction tie-ins and all rotating equipment installation as well as piping, reactor and civil work were my responsibility. Also planning and scheduling and working with client QC group.
L.S. Womack/Strategic Petroleum Reserves
Millwright Forman
Baton Rouge, La.,
November 1986 - 1 1987
Reworked oil and brine pumps as well as all piping. The pumps were completely rebuilt as well as some base modifications. This was done in a tight schedule, to government specs with safety and quality being the main concern.
Turner Ind./Crown Zellerbach Paper Mill
Millwright
Baton Rouge, LA, USA
September 1986 - 11 1986
Total rebuild on a paper machine to include roll changes, dryer modifications and complete change of wet end machine equipment
Turner Ind./Allied Signal Chemical Plant
Forman
Baton Rouge, LA, USA
March 1986 - 8 1986
Installed conveyor, film wrapper and other material handling equipment.
Turner Ind./Willow Glenn Power Plant
Millwright
Baton Rouge, LA, USA
May 1985 - 2 1986
This was a two phase job with the first phase being a complete rebuild with new parts on the #3 turbine generator, consisting of new inner shell, diaphrams, rotor and all other support equipment. Phase two was a complete rebuild of the boiler and fans boiler feed pumps and all water treatment equipment.
Turner Ind./Willow Glenn Power Plant
Millwright
Baton Rouge, LA, USA
November 1984 - 3 1985
Inspection #5 turbine and generator, to include disassemble, check. inspect and reassemble high and low pressure turbines along with generator
Brown & Root/TEXACO Oil Refinery
Millwright
Baton Rouge, La.,
August 1983 - 10 1984
Installation of water treatment equipment, pumps, compressors, vessels, cooling fans and reactors. Commissioning and start up were a large factor of this project due to the amount of equipment.
Turner Ind./Willow Glenn Power Plant
Millwright
Baton Rouge, LA, USA
October 1982 - 6 1983
Boiler rebuild and inspection on #2 turbine generator
Jacobs Eng./Borden Chemical
General Forman
Baton Rouge, LA, USA
September 1981 - 3 1982
Consisting of two phases this job was done with new at the time methods of pre-installation construction of modules, all equipment which was a major part of this project was relocated or replaced at this time to include multistage compressors, steam turbine drivers and 5000 hp electric motors.
Process Services/LOOP Superport
Millwright
Galliano, LA, USA
June 1981 - 9 1981
Test, check out and start up of offshore port facility equipment to include, gas turbine generators, water makers, pumping equipment all other support equipment
Jacobs Eng./EXXON
Millwright Forman
Baton Rouge, LA, USA
January 1981 - 4 1981
Installed new baler, modified and installed new finishing equipment, and packaging equipment along all new product equipment.
Turner Ind./Willow Glenn Power Plant
Millwright
Baton Rouge, LA, USA
June 1980 - 12 1980
Disassemble, inspect, and survey damage to #3 turbine generator due to major failure, then to repair as well as could be until parts were built.
Jacobs Eng./Big Cajun Power Plant
Millwright
New Roads, LA, USA
January 1978 - 6 1980
Install all offsite support equipment to include circulating water pumps, river water pumps, ash handling equipment, coal conveying equipment and de-min water treatment.
Millwright Local 720
Millwright/Millwright Apprentice
Baton Rouge, La.,
August 1972 - 11 1978
Various jobs in the pulp and paper, petro-chem, and power generation areas.
EDUCATION
Holden High School
OTH
Holden, LA Major: USA
Southeastern Louisiana University
OTH
Hammond, LA Major: USA
Baton Rouge Vo-Tech
OTH
Baton Rouge, LA Major: USA
Major: Journeyman Millwright
ON JOB TRAINING
OTH
I have many job specific training courses and seminars that are directly related to my position, such as Safety, Red Cross First Responder, Red Cross CPR, site specific training for HF emergency situations, Supervisory Level I,II, Training, Scaffold Inspection Competent Person Training, SAP R3 Training, SPO II Team and Leadership Building Program,ISO9000 Training, Sunstrand Canned Pumps, Sundyne Pumps, Heavy Equipment certification on manlift, carrydeck, 18 ton crane, epoxy grout training.
Plant Operations Training for ICI Americas which included various course content such as blueprint reading, boiler operations, vessel theory, HAZCOM, HAZMAT, plant equipment operation, many other such courses.
ABC School
OTH
Baton Rouge, LA Major: USA
Basic Pipefitting and Basic Electrical for industrial situations.
La. Safety Council
OTH
La.Safety Council
COSS: Certification
Certified Occupational Safety Specialist
Millwright/Safety
View contact information... |