CONTACT INFORMATION:
View contact information...
QUALIFICATIONS:
Certificate of Trade Studies-Mechanical Tradesman
Trade Certificate-Engineering Tradesman, Mechanical
Steam Plant Operators Certificate
Certificate of Steam Turbine Operation
Power Plant Operators Certificate
CERTIFICATION:
Advanced Riggers Certificate
Dogmans
C6 Crane Certificate, all cranes up to 60T
Forklift
Personal & Materials Hoist
Overhead Crane
Work Platform
AWARDS:
Western Power Apprentice of the Year: 1994, 1995, and 1996.
EMPLOYMENT HISTORY
July '02; to current
Total Engineering Services Ltd.
Installation and overhaul of Frame 5,6, and 9, gas turbines. Contracts were carried out throughout Australia and New Zealand. Our clients include Western Power, Duke Energy, John Thompson Engineering, Clough Engineering, AGL, GE Contractual Services, GE Rentals, Enertrade, Burns Roe Worley, CS Energy.
Dec. '00; to June '02;
Cullum Detuners Ltd.
Installation and overhaul of gas turbines, power turbines, gas compressors, aero engine test and
Development beds. Machines included, RB 211, Avon, Trent 500, Trent 800, Tornado, Typhoon,
Cyclone. Our clients included British Gas, Alstom, Rolls Royce, BP, and Dresser Rands.
Contracts were carried out throughout the U.K.
July '00; to Dec. '00;
Powergen Plc.
Overhaul of steam turbines at power stations across the U.K. Machines ranged from 10MW to
600MW and were manufactured by Parsons, GE, ABB, and Toshiba.
July '99; to July '00;
Cullum Detuners Ltd.
Installation and overhaul of gas turbines, power turbines, gas compressors, aero engine test and
Development beds. Machines included, RB 211, Avon, Trent 500, Trent 800, Tornado, Typhoon,
Cyclone. Our clients included British Gas, Alstom, Rolls Royce, BP, and Dresser Rands.
Contracts were carried out throughout the U.K.
April '98; to July '99;
Total Engineering Services Ltd.
Installation and overhaul of Frame 5,6, and 9, gas turbines. Contracts were carried out throughout Australia.
Jan. '97; to April '98;
Fluor Daniel Power and Maintenance Services
Overhaul of steam turbines at Muja and Kwinana power stations. Turbines ranged from 60MW
to 200MW, and were Parsons and Toshiba.
Jan. '94; to Jan. '97;
State Energy Commission of Western Australia
Installation, overhaul, and maintenance of rotational equipment including but not limited to gas turbines, steam turbines, and gas compressors.
PERSONAL DETAILS:
DOB - 15th of September 1977
Marital Status - Single
View contact information... |