Over 24 years of extensive experience in progressively responsible positions in the Construction Industry. I have strong organizational and people skills. I communicate well with the craft and customer, both written and verbally, I am also computer literate. I can read and interpret mechanical, civil and electrical drawings. I have hands on experience in welding and I have trained welders, pipefitters and riggers.
EMPLOYMENT HISTORY:
Sunoco Oil Refinery, Oregon, OH
Contract Administrator, ANR, 02 to present
Oversee station torque program, monitored contractors and craft performing torque on exchangers, piping flanges, vessels and valves.
Valero Oil Refinery, Ardmore, OK
P3 Scheduler, Innovated Turnaround Controls, 01/06 to 02/06
Assigned to station contractor, using Primavera P3 software, I scheduled and monitored 3 major piping modifications for upcoming turnaround, including installing 1 new tower and new pumps and drum. I also did a complete material takeoff and a manual project estimate.
Valero Oil Refinery, Delaware City, Delaware
Contract Administrator, Pro Tech Engineering 8/05 to 11/05
Walked down work orders, ordered material, took photos, developed piping field sketches including weld symbols, estimated task, monitored budget, schedules and craft for piping and valve replacement/repairs during the Coker fall turnaround. Provided scheduling my estimates. material take-off, sketches and photos for work package development
Pipe Welder, 2/14/04 to 8/15/05
Certified chrome, stainless and carbon steel pipe welder, assigned to various co-gen, coal and peaker plants throughout the USA..
Fermi II Nuclear Plant, Newport, MI
Construction Superintendent, Washington Group International, 01/26/03 to 4/15/03
Developed estimates, prepared schedule, ordered material, interacted with customer and developed and coordinated completion of punch list for 2 Aux Boiler installations. I also monitored and assisted Superintendents and Engineers to meet goals and ensure project remained on-schedule and within budget.
Turkey Point Nuclear Plant (Unit #3 & 4), Homestead, FL 10/07/02 to 12/31/02
Construction Planner, Samico Professional Services
I Prepared both Modification and Maintenance work package's using PASSPORT and Portal G programs. Packages included weld maps (using Visio), weld documents, Sect. XI repair/replace plan and work instructions, procedures and parts. Prepared schedule, ordered parts, prepared estimates and managed and oversaw progress, changes, budget and insured that applicable drawings were updated.
Prairie Island Nuclear Plant, Welch, MN
Construction Planner, Larkin Enterprises Inc. 10/01 to 10/02.
Duties were developing complete Maintenance Work Packages and PM's using CHAMPS, EMPAC, Visio and Word. I prepared both ASME Sect. XI and non-safety packages to repair or replace pumps, valves, turbine, main condensers, HVAC, pipe supports and heat exchangers and had to provide rigging schemes in work package, including all weights, size of shackles, chokers, etc. I used Visio to develop weld maps. I prepared a budget, scheduled and assigned Work Order to applicable work group. I monitored the Work Order through completion, making changes and insuring Work Order did not exceed budget.
Indian Point Two & Three Nuclear Power Station, Buchanan, NY
P3 Scheduler, Williams Power, 09/00 to 10/01
Responsible for scheduling and monitoring outage activities on the night shift.
Fermi II Nuclear Power Station, Newport, MI
Superintendent, Raytheon Engineers & Constructors, 03/00 to 05/00
Responsible for directing craft for ISI activities and piping Modifications.
Sequoyah Nuclear Power Station, Soddy-Daisey, TN
Field Engineer, Stone & Webster thru Caliper, Inc. 01/00 to 03/00
Field Engineer – Prepared cost estimates and schedules for assigned Modifications and provided technical direction for ECCS orifice installation and robotics weld overlay repairs on lower canopy seal welds.
D.C. Cook Nuclear Power Station, Bridgeman, MI
Maintenance Planner, Sun Technical 01/97 to 07/99
Assigned to Maintenance Dept., developing maintenance Work Orders and PM's using PIM's planning system. This involved walkdowns, preparing cost estimates, scheduling, instructions and parts for work package assembly and approval to work. Planned Work Orders for piping replacement, valves and pump replacement including Section XI and non-safety.
Indian Point 3 Nuclear Power Station, Buchanan, New York
Construction Engineer, Sun Technical, 1/97 to 8/97
Performed the planning, field engineering, cost estimates, monitored the installation and activities performed by the contractors on assigned modifications, construction projects and maintenance tasks. Approved job estimates, rigging plans, scope changes, performed constructability reviews, field walkdowns in support of design development for assigned modifications and construction projects. I was accountable for the safety, quality, schedule, cost and close-out of feedwater piping change-out.
Fermi II Nuclear Power Station, Newport, Michigan
Superintendent, Raytheon Engineers & Constructors, 9/96 to 11/96
Responsible for 'Visco damper,' main steam vibration eliminators, gland steam and lube oil major modifications, this included verifying all parts and materials were in hand before work tasks started, monitored schedule and budget.
Waukegan Fossil Station, Waukegan, Illinois
Maintenance Planner, Sun Technical, 6/95 to 5/96
Responsible for fly ash handling system, bottom ash hoppers, soot blowers, burner inspections, repair and testing. I developed work orders to replace defected or degradated parts, I ordered parts from the OEM for the fly ash system, bottom ash hoppers.
Quad City Nuclear Station & Dresden Nuclear Power Stations
Maintenance Planner, Sun Technical, 10/93 to 7/94
Assigned to Bechtel's Materials/Parts Group as night shift materials/part's analyst. This entailed coding Electrical & Mechanical parts (complete description, cost shelf life, size, material type, cost, vender part number, manufacturer and supplier), from this a stores item number was assigned. Prepared material withdrawal tickets, verified material complied with applicable codes, standards and plant procedures. This included ensuring that packages were constructable, parts verification and in compliance with applicable codes, specifications and procedures. Packages, including weld documents were assembled and applicable tests (hydro, inservice leak or pneumatic) completed per instructions (ASME SECT. XI and ANSI B31.1). These test included valve lineups, test pressures, hold time and gauge locations.
Vermont Yankee Nuclear Power Station, Brattleboro, Vermont
Project Manager, TTI Engineering, 4/90 to 6/92
Assigned as the Responsible Project Manager for the replacement of two feedwater heaters (31/2 million). This included detail estimated of project and setting budget. Bid out construction to contractors. Selected best proposal and contractor and awarded project. Monitoring budget details, design specifications, ensured all parts were correct and on hand and for the installation and test instructions via EMPAC. The 'I&T,' installation and test instructions, encompassed complete detailed instructions for the feedwater heaters, associated piping, valves, instrumentation and electrical removal, repair, modifications or replacement. The 'I&T' also included complete test instructions for the new feedwater heaters and associated piping. Conducted weekly safety meeting, managed the financial aspect of the project, monitored and controlled construction, insured project was on schedule and within budget. I interfaced with customer, chaired weekly project meeting.
Getty Oil Refinery, Delaware City, Delaware
Superintendent, Catalytic Inc., 5/84 to 1-87
In charge of piping, valve and equipment repair and replacement for Coker, Cat Cracker and Acid House scheduled turn-around's. Assigned work crews, monitored and followed up crafts work. Prepared work and fire permits, conducted safety meetings and developed turn-around punch list and ensured completion. Prepared work and fire permits, conducted safety meetings and developed turn-around punch list and ensured completion.
Superintendent, Catalytic Inc. 1979 to 1984
Mohave Generating Station, Laughlin, NV
I was responsible for the forced outage repairs for both units. Also, high and low pressure feedwater heater replacement and failed boiler tube repair.
U.S. Sturges Floating Nuclear Plant, Gatun Lock, Panama
Superintendent, Catalytic, Inc. 1977 to 1978
In charge of installing fabricated spool pieces for ECCW in place on ship and system start-up.
Pipefitter Welder - Certified to weld on all primary and secondary piping systems during the construction of various Oil Refinery's, PWR and BWR Nuclear Power Plants throughout the U.S. 1970 to 1977
EDUCATION:
Aiken High School, Aiken, South Carolina, Massey Technical Institute, Jacksonville, FL
PWR Systems Training (1998) and (2001)
COMPUTER SKILLS: PASSPORT, Portal G and Visio, MEGA PARTS, ECP, ETS, EWECS, EMPAC,NPM, ECAP, TJM, PIMS, MIMS, Windows, Microsoft Word, and CHAMPS, PRIMAVER P3 Scheduling Course 102, Primavera at Bala-cynwyd, PA.
Typing skills 50+ WPM
United States Navy, Honorable Discharge