Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #28962 next resume »»
CONTACT INFORMATION:
View contact information...

QUALIFICATIONS:

HND MEASUREMENT &CONTROL ENGINEERING
Falkirk College, Falkirk, Scotland.

ONC INSTRUMENTATION & CONTROL
Falkirk College, Falkirk, Scotland.

Courses Attended: HUET AP/LAP(NOGEPA)Offshore safety introduction, ILO,FULL OFFSHORE MEDICAL,VCA FOR MANAGERS,Permit Receivers (various), Chemical Process Safety, Hazardous Areas & Equipment, D.C.S Shutdown (various), Digital Electronics & Logic, D.C.S Honeywell 3000 (Operation).
Honey well Plantscape configuration/Operation course.
Crosby Safety Relief Valve Overhaul Course. ABB ADVANT PLC System configuration. Safety passport course.
Various safety induction courses around the world.

Computer Experience Extensive use and customising of Instrument database index in MS Access.
Also some experience on Project Planning tools.

SYNOPSIS

EXPERIENCE
I have extensive experience in a wide range of Instrumentation and control systems; covering a range of job functions in various industries i.e. process, chemical and petro-chemical, on-shore oil & gas, pharmaceutical. Involvement in all areas of instrumentation engineering: electrical interfaces and control, design, installation supervision and commissioning. I have DCS and PLC system design, review, Erection and commissioning experience. I have extensive experience using Intrinsically Safe and other Hazardous Area (ExD, ExN etc) design principals and am familiar with engineering solutions using networked instrumentation i.e. FIELDBUS and PLANTWEB. Extensive use and customising of Instrument database index in MS ACCESS, INTOOLS.

Positions Held
SR I & C Commissioning Engineer, Instrument and Control Engineering Manager.
Construction Manager, Control Systems Engineer, Construction Engineer, Maintenance Engineer, Instrument Supervisor, Lead Technician, Commissioning Technician/Supervisor, Instrument Technician.
Plants/Instrumentation
DCS, PLC, ESD, fire & gas systems, petro-chemical, oil & gas, Power Stations, turbine, water treatment, Desalination, sewage treatment, Hydrogen plant, Demi & potable water, photo synthesis, boiler water, storage, analytical, flow, level, pressure, temperature, quantity, hydraulic, pneumatic.
Honeywell, Emerson, Yokogawa Centum CS3000, W.D.P.F.Foxboro, Rosemount, Masoneilan, Vega, Buhler, Tayllor, Eckardt, Gulde, Siemens, Fisher-Porter, Endress-Hauser, Samson, Bopp-Reuiter, Wika, Hereus, Lucifer, Rueger, Raychem, Polymetron, Zellweger Analytics, Maihak, Sigrist, Allen-Bradley, Gensym Advanced Control System, Honeywell TDC 2000/3000, Emerson, ABB Advant, ABB Symphony DCS & PLC, Plantscape.

EMPLOYMENT HISTORY:
Duration: May 2005 - present
Company: AJS (AMEC) (Capital Projects Group)
Project: K17 FA field development Project
Position: lead Pre Commissioning Engineer
Duties:
In charge of pre - commissioning for the K17 FA field development Project which includes modification of two offshore oil rigs.
Convert approved design packages into SAP networks/work orders, and workpacks.
Ensure availability of all necessary manpower resources
Call-off vendors as and when required for construction/commissioning support
Accept all commissioning activities as complete from the various vendors.
Solutions implementation and support of the project team objectives. Provide technical direction on a project basis
Conduct daily/weekly progress meeting with client/vendor.

Duration: Dec 2004 - May 2005
Company: (Enelpower Italy),
Project: yanbu unit 4 project. (Saudi Arabia)
Position: Consortium Commissioning Manager
Duties:
In charge of commissioning for the yambu project which includes one 130MW Ansaldo turbine and boiler with aux plant.
Solutions implementation and support of the project team objectives. Provide technical direction on a project basis
Conduct daily/weekly progress meeting with client and end user reporting back to head office in Italy.
Drive construction for the final completion and acceptance.
Drive the commissioning team for first sync of the unit to the grid.

Duration: March 2004 - DEC 2004
Company: (Enelpower Italy), Qatar (Wide technical Services).
Project: Ras Laffan power plant
Position: SR DCS / I & C Commissioning Engineer
Assigned as SR DCS / I & C Commissioning Engineer on the Ras Laffan Combined Cycle and desalination facility.
Duties: Schedule daily commissioning plan to co-ordinate with project completion dates.
Clear all Non Conformances and punch lists, Carry out witness tests with the client and consultants.
Conducting Hardware & Software tests for DCS and Subsystems.
Fault finding and Troubleshooting DCS Hardware/Software.
Interface with suppliers of DCS, operator stations and software.
Technical assistance for any contractual problems that arise.
Completion of Emerson Ovation DCS commissioning SAT and SIT, working towards final PAC for the plant.
Assist on the commissioning of the various vendor systems, SCADA, GE, and ABB.

Duration: Jan 2003 - Feb 2004
Company: Alstom Power Italia (UAE) (Wide technical Services).
Project: Ruwais GUP Expansion
Position: SR I & C Commissioning Engineer
Assigned as SR I & C Commissioning Engineer on the Ruwais GUP Expansion.
Duties: Schedule daily commissioning plan to co-ordinate with project completion dates.
Clear all Non Conformances and punch lists, Carry out witness tests with the client and consultants.
Interface with suppliers of DCS, operator stations and software.
Technical assistance for any contractual problems that arise.
Co-Ordinate Meetings with Client and project management teams to resolve contractual problems.
Completion of ABB DCS commissioning SAT and SIT, working towards final PAC for the plant.
Completion of the Virtual Process Advanced Control System Performance and SIT/SAT test.
Schedule daily maintenance programs for I & C activities.
Trouble shooting of all I & C Systems, Bentley Nevada, Abb Advent, ABB Symphony DCS.

Duration: Aug 2002 - Jan 2003
Company: Honeywell
Project: Wyieth Bio-Pharmaceutical plant.
Position: Commissioning Engineer
Assigned as Instrument Engineer on the Wyieth Bio-Pharmaceutical plant.
Duties: Co-ordinate team of instrumentation Technicians working in the field (loop checks to ABB PLC System, calibration of transmitters, logic functional checks).
Commissioning of the Honeywell H.V.A.C. Control system Plantscape. The equipment involved includes Boilers, Chillers, and supply, extract and pressurisation dampers, Air Handling Units, MCCs and Fire Alarm Interface.
Make up of system Turn over packages for client.

Duration: July 2002 – Aug 2002
Company: Macfarlin Smith
Project: Poppy Straw Project
Position: Commissioning Engineer
Assigned as Instrument Engineer on the Macfarlin Smith pharmaceutical plant.
Duties: Co-ordinate team of instrumentation Technicians working in the field (loop checks to Siemens PLC System, calibration of transmitters, logic functional checks).
Make up of system Turn over packages for client.

Duration: Nov 2001 - July 2002
Company: Alstom Power Italia (Saudi Arabia). (Wide technical Services).
Project: Shoaiba 3000MW Plant Stage 1 Phase 1 & 2
Position: SR I & C Commissioning Engineer
Assigned as SR Instrument & Control Commissioning Engineer on the Shoaiba 3000MW Power Station Project Saudi Arabia.
Duties: Co-ordinate teams of instrumentation & control technicians working in the field (loop checks, calibration of transmitters, logic functional checks).
Assist construction in the completion and hand over of the erection works.
Schedule daily commissioning plan to co-ordinate with project completion dates.
Keep as per QA/QC standard the test equipment used during commissioning.
Clear all Non Conformances and punch lists
Carry out witness tests with the client and consultants.
Interface with suppliers of PLC's, operator stations and software.
Complete I & C turnover packages for client hand over.
Technical assistance for any contractual problems.

Duration: Sept 2001 - Nov 2001
Company: Syngenta Agrochemical Plant, Grangemouth, Scotland
Project: Shutdown and Maintenance Program.
Position: Maintenance Engineer
Assigned as Maintenance Engineer to the Central Engineering Group covering Azoxystrobin (crop protection) plants.
Duties: Maintenance Engineer to the Central Engineering Group covering Azoxystrobin (crop protection) plants.
Stripdown / reinstatement of instrumentation and control valves during and after plant shutdown
Periods. Implementation of plant preventative maintenance system.

Duration: Jan.2001 - Sept 2001
Company: SEPAM Ltd.
Project: Proposals Dept., Head Office, Ireland
Position: Instrument and Control Engineering Manager.
Assigned as Instrument and Control Engineering Manager for Sepam's bid Department.
Duties: Working in the proposals department for the preparation of Tender proposals, including Pharmaceutical and microelectronics' Projects in Ireland, Singapore, UK, China and mainland Europe. Responsible for all Review of Specifications, Material Take Off, Development of Bills of Materials and Pricing. Review Project Schedule and develop Project Execution Method for Instrument and Control Scope of work.

Duration: Aug.2000 - Jan.2001
Company: Tyco Flow Control
Project: BP Oil
Position: Instrument Support Engineer.
Assigned as Tyco's Instrument Support Engineer for their control systems workshop.
Duties: Planning individual activities; identify spares/materials, subcontract or specialist requirements and resources required.
Identify opportunities for new job methods and improved efficiency.
Schedule jobs i.e. times to complete.
Write job method statements, task risk assessments.
Maintain overall schedule and communication to customer and service centre manager on progress and shortfalls.
Attend daily progress meetings, reporting on current situations, monitoring changes in forward planning and restrictions to progress.

Duration: April.2000 - Aug.2000
Company: ABB
Project: Factory Acceptance Test (FAT) ABB Advant Houston, Texas.
Position: Control Systems Engineer.
Assigned as Control Systems Engineer for the Saudi Aramco Hawiyah Gas Plant Project.
Duties: Design special procedures for DCS and integrated systems, ABB August ESD System, Bentley Nevada Vibration System and CCC Compressor Control System.
Involved in Factory Acceptance Test for the ABB Advant DCS and the integration FAT of Vibration, ESD, and Compressor Control Systems.

Duration: Jan.2000 - April.2000
Company: McConnell Dowell
Project: Aramco Control System Replacement Program
Position: Sr Instrument Engineer.
Assigned as Sr Instrument Engineer for McConnell Dowell on the Control System Replacement Project.
Duties, Review of construction loop packages for final handover to commissioning,
Drive construction & pre-commissioning to completion. Verifying vendor instrument Design criteria to suit plant scope & conditions. Address all contractors & construction initiated site quires.
Writing preventive maintenance Schedule for all Instrument work.

Duration: Aug.'99 - Dec 99
Company: Fluor Daniel
Project: China Program (KODAK)
Position: Instrument Construction Engineer.
Assigned as Construction Engineer on the building & Commissioning of Kodak's new Photo sensitising building. Duties: Address all contractors & construction initiated RFI's. Lead the 80% & 95% complete punch list effort for each turnover package. Provide design and contractual interpretation as required to the contractor. Driving construction to mechanical completion within Kodak's parameters.
Assigned as Engineer for the installation and commissioning of all building and process air handling units and HAVC Control.
Worked on Instrument maintenance schedules from control valves to building services.

Duration: June.'99 - Aug. 99'
Company: Fisher Rosemont
Project: Obaided Development, Egypt.
Position: QA/QC Supervisor
Assigned as QA/QC Supervisor for the Obaided Development Project.
Duties: Inspection of all instrumentation, H.V.A.C. System gas Alarms and ESD Systems. Material and equipment Inspection on Vendor packages and Final Co-ordination of all hand over documents.

Duration: Aug.'98 - May.'99
Company: S A. Kent
Project: Construction Manager Gosp 3 & 4 (Saudi Arabia)
Position: Construction Manager
Assigned as Construction Manager for DCS upgrade of two Gas & Oil Separation Plants.
Duties: Management of all sites for the two gosp's.
Planning individual activities, identify spares/materials, subcontract or specialist requirements and resources required.
Collect and record data for use in performance measurement.

Duration: May.'98 - Aug.'98
Company: Glaxo-Welcome
Project: Instrument maintenance Program
Position: Instrument maintenance Engineer.
Assigned as Instrument maintenance Engineer with Glaxo-Welcome.
Main Duties: Management of all site Instrument maintenance for the plant.
Assign daily job packs for instrument and electrical technicians. Write monthly maintenance schedule for instrument works.

Duration: April.'98 - Jul.'98
Company: James Scott
Project: De-Bottle neck & Turnaround.
Position: Instrument Engineer.
Assigned as Instrument Engineer for the commissioning of Exxon's Ethylene process plant.
Duties: Commissioning & final handover of all Instrument systems. Preparation of instrument loop packs.

Duration: Jan.'98 - March.'98
Company: Balfour Kilpatrick
Project: New Pigment Process Plant.
Position: Instrument Engineer.
Assigned as Instrument Engineer for the Commissioning team on the Ciba pigment plant.
Duties: Loop tuning all instrument systems through the Allan Bradley PLC's, also installation and calibration of the pH Analysers. Responsible for all progress reports, dealing with client's problems.

Duration: April.'97 - Dec.'97
Company: ESSO
Project: Balder F.P.U.
Position: Instrument Engineer
Duties: Review consisting of verification towards the instrument data sheets, certificates Asbuilt design drawings & test records in line with the requirements of N.P.D., NVE, IEC & NMD regulations and project specifications. Main function being certification of instruments in hazardous areas including IP & EX ratings. Preparation of work packs for mechanical completion & pre-commissioning.

Duration: 1982 – 1997.
Company: Insertech
Project: Various
Position: Maintenance/Instrument Technician/ SR Instrument Technician
Assigned on various contracts after my formal training oil and gas, Petro-chem, Power and Water plants.
Duties: loop tuning /checking, installation & commissioning of various instrument control systems.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 851 to 900 of 1361)Go to Search Parameters...
Brief Description
QA Manager,Quality Engineer, QA/QC Supervisor, Auditor, Instructor,Multi-Discipline Field Inspector
Senior Logistics Coordinator
Talented HR professional with a generalist background. Experienced working in a professional services environment with complex hierarchies and matrix management. Ability to operate at both a strategic and operational level, within a geographically diverse team and in an international role.
Over 20 years Quality Management and Supervision experience in Heavy Engineering Construction Industry
Experienced Laboratory Manager. 17 years petroleum lab experience. 12 years management experience. Extensive knowledge of ASTM IP, UOP, ISO test methods, ISO 9000, purchasing, budgeting, equipment maintenance, staff management, environmental and safety requirements in petroleum testing laboratory.
Document Controller cum Project Secretary with 3 years experience in Oil & Gas industry .
I have extensive experience in a wide range of Instrumentation and control systems; covering a range of job functions in various industries i.e. process, chemical and petro-chemical, on-shore oil & gas, pharmaceutical. Involvement in all areas of instrumentation engineering: electrical interfaces an
Innovative thinker with broad-based expertise in human resources, and business development.
Graduate Engineer / Junior Engineer
10 years experience in IT software development environment in various organizations
Manufacturing, Maintenance, Sales and Service, Application Engg, Project Engg, Administration
Financial Manager (expat)
20+ years of experience with the environmental aspects of major energy projects - power plants, pipelines, transmission lines, refineries.
Piping and Welding Supervisor QA
To obtain a position as a Technical Recruitment Professional within a fast- paced corporate environment in Oil & Gas industry. Also, to continuously expand my technical knowledge and apply that knowledge in a rewarding and challenging role to infuse my peak performance.
I am diplomaed Engineer - geologist/hydrogeologist, having some experience in micropalentology.
Environmental Consutlant/ Management - International Experience
Communications professional with over 20 years experience in public relations, including internal and external relations, websites and media relations. Excellent writing and strategic planning skills. Independent consultant in Vancouver and Calgary, Canada; before joining Qatar Petroleum. Former pri
Creating geologic maps of stratigraphy and structure. Evaluate environmental issues. Familiar with sampling techniques. Core logging and description. Creation of cross-sections and geologic maps. Ability to explain data and represent maps.
Geoscientist. I am a highly qualified, versatile geoscientist with 7 years of Petroleum industry experience, 2+ years in Processing Geophysics with a major global energy company.
MBA Graduate/Diploma in industrial safety holder with 8 years of experience as a Safety Officer
Operator - Track hoe, Horizontal Directional Drill 1.2 million lbs. -- Experienced in oil pipe line construction and safety - Knowledge of gasoline and diesel engine maintenance - Locating Equipment experienced and qualified
Wide knowledge in the field of geology and very good command of the English language. capability to develop different activities in the geology area and to achieve goals in fixed periods of time; ability to work co-operatively, across cultures and organisational boundaries to achieve shared goals.
Geologist Resume
Have been marketing drilling consumables and surface drill rigs to the mining industry. Have been involved in the maintenance of consumables.Been involved in procurement and supply.
Diamond Driller's helper, Labour
Materials and logistics supervisor and controller.Warehouse and Inventory supervisor.
International Business Development - Africa/Europe/Middle-East
Experienced chemist with over ten years working in EOR/IOR projects associated to laboratory and field to the oil & Gas industry in Venezuela. Coordinated and used different analytical equipments, methodologies and facilities, following standard procedures of laboratories and operations
I am an experienced Mechanical Engineer in the field of Design & Welding (IWE) Engineering. I obtained my Dipl-Ing. certificate (equivalent of MSc(Eng.) in Design and Construction of Agricultural and Construction Machinery from the Technical University of Berlin in Germany
Rigger with RGIT 20+ years experience
Masters in Mechanical Engineering - 2004, Bachelors in Mechanical Engieering – 2001, Computer awareness:Auto CAD, MS Office, MS Projects, Power Point Presentations; Trained & Certified for Health, Safety & Environment - IOSH
Data manager with over 10 years of experience in the mineral exploration industry providing high quality digital tools, data and information to geoscientists. Extensive experience managing IT projects and services on an international environment. Strong analytical, organizational and technical skill
Highly motivated geologist with an Msc in engineering geology based in the UK looking for a growth oriented job in oil and gas industry that will provide me with relevant professional experience. Accustomed to a fast-paced multidisciplinary environment where deadlines are a priority. Good organisati
Bilingual, Certified PMP and Six Sigma Greenbelt, self-motivated and client-focused Business Systems Analyst with seven years of global experience as well as experience in the Health/Environment, Public, Financial and IT Sectors.
Transport & Logistics Safety (HSE):Road Safety Monitoring, • 3PL Contractors/ Subcontractors pre start up HSE Audits (HSE MS, HSE Plans, Documentation Control, Vehicles Roadworthiness Inspection, Drivers Competency Assessment, Workshop Audit, Transport Routes Survey, etc.)
I have had a truck licence for just on 20 years. Previously I drove grip and generator trucks for television outside broadcasts and various location shoots.I am a confident and reliable driver how wishes to take the skills to a more regional out back enviroment. I would be an attribute to any team.
Meet deadlines, supervise others, accept responsibility, solve problems, instruct others, organize/manage projects, assemble things, drive/operate vihicles, observe/inspect, operate tools, repair things, use complex equipment, calculate/compute, check for accuracy, compare, research, detail-oriented
Nace certified coating inspector level 3, Chartek approved fireproofing inspector & full qualified insualtion inspector.
Internationally Expierenced, First Year MBA, Arizona State University
Precision Millwright, Welder. Turbines, Power Plants, Ethonal Plants, Steel Mill Plants.
A globally-certified procurement professional with extensive Asia-Pacific experience
CIVIL ENGINEER WITH 12 YEARS OF EXPERIENCE IN CONSTRUCTION FIELDS
Marketing and Software experience with Oil & Gas (drilling) background
Twenty years of contract management and procurement experience in commercial and government environments including supervisory roles. Experienced in onshore and offshore construction international contracting.
Experience and Qualifications in the following fields : Ops./Elect./Instr./Mech./Crane./Scada/Projects/F&G./Power/Compression/Safety(Nebosh ongoing)/Methode-Safety/ISO14001/9001Cert./Ops.manuals/Environmental/Shutdown/Logistics/Buyer/Revamping/NORM/SIMOPS/Hook-ups/flowline’s
I have held management/technical positions with the companies listed within my resume for over 20 years specializing in construction, environmental, mining, mineral/material processing and chemical manufacturing businesses. I have significant experience in all functional areas & P/L responsibility.
15 years experience in the management, production, materials, logistics and international transport fields, 13 of which are at managerial level, the last 10 years being spent as an expatriate in Nigeria, France, Togo and West-Central Africa.
I am mechanical engineer 2002 ,I work as site engineer in the construction companies.
Experienced in construction document controls, field office management, setup initial document controls for field office, project scheduling with Primavera P3 and MS Projects.
1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   [ 18 ]   19   20   21   22   23   24   25   26   27   28  
Seach Parameters

Change search parameters...
CATEGORIES: Other;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com