CONTACT INFORMATION:
View contact information...
Educational Summary
M.Sc in Industrial Engineering/ Sys. Productivity and Management branch in 2000
B.Sc in Chemical Engineering from A.I.T (Abadan Ins. of Technology- University of Oil Industry) @ 1992
Trainings Summary
HYSYS SIMULATION
PROVISION/PROII simulation training.
PIPE PHASE and PMS simulation training.
PVT training.
PC skills (MS Office, windows 95/98/NT, Auto cad 2000 TRAINING.)
Professional Experience
Provision of process and troubleshooting on the site during Commissioning and start up of South Pars phase2&3,Sirri E&A Development and Esfand 2 Projects.
Process simulation (PRII/PIPE PHASE/HYSYS) and establishing heat and material balances/equipment duties and working on engineering documents (South Pars, Sirri E&A and Esfand 2,Froozan&Esfandiar and Phase 2&3 of South Pars )
MDP preparation (as a member of team) for Sirri C &D development project, up stream of integrated GTL plant in South Pars gas field
PFD design, equipment list and process data sheets preparation, PID development, facilities design checking. (Esfand 2 project)
Writing process notes, operating parameters, operating guidelines, defining set points, etc. (TSP, TS, Esfand 2 projects)
EMPLOYMENT HISTORY
NPC/SASOL Tehran Office
2003-Present Head of Upstream
Project is processing of 1400MMscfd gas of one phase of South Pars gas field to prepare a suitable feed gas for GTL plant. Project consist of three parts, Upstream, Midstream and GTL.I am responsible for Upstream section where the platforms, sea lines, reception facilities, condensate stabilizer and, MEG regeneration are included. Feasibility study has finished and basic study has started.
PEDCO TEHRAN OFFICE
2002-2003 SENIOR PRODUCTION ENGINEER
Project was the development of a brown field(Foroozan &Esfandiar) to increase the produced oil to100 000 bpd by drilling some new wells and using the gas lift system.
TOTAL FINA ELF SOUTH PARS, ASSALUYEH, MIDDLEAST
2000-2002 SENIOR PRODUCTION ENGINEER
Project is the processing of 2000 mmscfd sour raw gas coming from two offshore platforms via two 32 sealines. My job as a Sr. Production engineer have been tacking part in the start up of project, responsible for offshore platforms, sea line and some of the onshore units (reception facilities, Condensate stabilizer, Meg regeneration, sour water stripper) surface production Eng. Problems, providing process data sheets process guidelines and process notes, reviews field operating data on daily basis and advises on wells optimization program. Identifying specific requirements for special material balance test or analysis in field, In conjunction with operation and laboratory personnel, interprets results of lab. and disseminates information through various technical reports to management.
Using PROII for re-simulation of some units and solving some problems during start up. Presence in some OTP tests and working on SDS.Reviews existing corrosion control schemes and following corrosion rate with corrosion /inspection engineers.
IOOC/TOTAL SIRRI, TEHRAN AND SIRRI ISLAND, MIDDLEAST
1998 – 2000 SENIOR PRODUCTION ENGINEER
Provision of process support, troubleshooting and problem solving on site during commissioning and early production phase, and assistance in preparation & analysis of field production data to Tehran Engineering department. Project consists of expansion of existing onshore oil terminal on Sirri island, Iran, to treat 100000 bopd, (max) from Sirri E field. Preliminary HP separation of crude is carried out offshore on a new production platform, Sirri Ilam, that receives crude from 3new wellhead platforms WPE1, WPE2 and WPE3.Oil and gas are sent to shore via two new pipelines. Onshore, the new facilities consist of new oil and gas reception facilities, gas slug catcher, new HP flare, oil MP,Lp and atmospheric separators, crude desalting, crude stabilisation, new power generators and new water inj. Plant(capacity 160000 bwpd)for reservoir pressure maintenance.
I.O.O.C, SIRRI ISLAND/KHARG ISLAND MIDDLEAST
1994-1998 PRODUCTION ENGINEER
Process simulation by PROII and PIPE PHASE, checking of P&IDs, equipment list and instrument data sheets, PID development, preliminary of process support, troubleshooting of some of the field problems.
Provision of Oil wells testing through test separator and operation of oil and gas facilities such as three phase separator, pigging operation, heater, flare, ko.drum, close and open drain and also water inj. System such as sea water lift pumps, filters (elements and sands) deaerators, vacuum pumps for dearation, sea water booster and high pressure inj. Pumps, etc.
1992-1994 LABORATORY DEPUTY
Testing and supervising in the laboratory as a deputy in the engineering department labor
View contact information... |