Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #39670 next resume »»
CONTACT INFORMATION:
View contact information...

MS/BS Petroleum Engineering
- University of Southern California - 1977
- Colorado School of Mines-1973
Postgrad - Civil/Arctic Eng, Univ. Alaska - 1978
- Computer Science, UH & HCC - 1989-93
Member ASME, SPE

REGISTRATIONS
OPITO Offshore Safety Certificate TE_080310034221
EU SafePass H&S Awareness SP2/473/289319/0807
Registered Professional Engineer
Texas No. 63198
Alaska No. EP4783
Colorado No. 15725

WorleyParsons - (Present) – Principal Project Controls Manager – Houston, TX, USA

PCM for Engineering, Subcontracts, Procurement and Russian ERA (Environmental Regulatory Affairs) and interface with Moscow office for ExxonMobil's Exxon Neftegas Limited Sakhalin-1 Arkutun-Dagi Development Project.

US Department of State - (1.5 Years) – Petroleum Engineer & Acting Senior Oil Consultant – Secret Clearance - Baghdad, Iraq

Confidential Consultation to Iraq Ministry of Oil (MoO) on Reservoir Engineering, Drilling Rigs, Fields Development, Pipelines, Facilities, Distribution and ISP (Internal Security Projects, i.e., exclusion zones, Project Clean Delivery, etc.). Interfaced to coalition civil/military groups on same. Wrote scope for and Project Engineer for new offshore export terminals study. Approved Oil projects and project changes. Wrote Petroleum Economics course and co-instructor for Unitization course at MoO. - Office of Oil/Projects under both IRMO (Iraq Reconstruction Management Office) and ITAO (Iraq Transition Assistance Office) in US embassy in Baghdad, Iraq with visits by convoy to Iraqi sites and offices.

Kelly Engineering Services - (1 Year) – Project Controls & Strategy - Houston, TX

Development Planning Lead – Shell E&P - Utilized broad experience in interfacing with personnel from Exploration and Field Development through Power and Process for developing Strategy & Plans in confidential multi-billion dollar Unconventional Oil projects. Set-up Centralized Primavera system for all projects in division and trained personnel in use. Developed concise summary of key deliverables and critical management decisions to assure accelerated projects.

Intec Engineering - (1 Year) – Supervising Engineering Specialist / Project Manager - Houston, TX

Interface Manager – Chevron "Frade Field Development Project" FPSO-Subsea-Pipelines FEED design for 3610-foot (1100-m) water depth in the North Campos Basin, Brazil. The initial "Facilities" will be 4 gas-lift assisted production and 4 water-injection subsea wells, all tied-back to a FPSO processing facility. Oil will be offloaded to Suezmax and VLCC trading tankers and gas will be exported to the Roncador Pipeline. Another 3-9 production and 2-3 injection wells will be drilled, completed and tied-back later (max 13 production and 7 injection wells).

Estimating for BHP Billiton Shenzi Subsea/Pipelines Pre-feasibility Engineering project in 4375-foot (1333-m) water depth in the Gulf of Mexico, USA. The subsea development will include up to 32 wells, including both 10K and 15K production trees, and water injection trees, all tied back to a dedicated host vessel.

Offshore Projects Engineer – FPL – Long Island Offshore Wind Park (LIOWP) Project - Advised cost savings and redesign for Offshore Wind Farm Installation Projects. Evaluated alternate Installation and Engineering contractors. Trained and mentored engineers.

GE Wind Energy, LLC - (1 Year)

Offshore Projects Engineer

Advised cost savings and redesign for Offshore Wind Farm Installation Projects and Offshore O&G Platform to Wind Turbine Generation (WTG) Conversions. Evaluated alternate Installation and Engineering contractors. Supervised WTG Foundation R&D Conceptual Studies.
Gunfleet Sands Wind Farm Project, Thames Estuary, England
Arklow Sands Wind Farm Project, Irish Sea, Ireland
Dual-Based at Houston, TX and Greenville, SC with field assignment in SE Ireland

KBR (Subsidiary Halliburton) – (3 Years)

Project Control (Cost & Planning)

Supervised one to three project control personnel in ConocoPhillips/CPC and BP projects. Planned schedules, expedited procurement, and prepared Progress and Manhour Metrics on other projects.
LNG FEED and EPC Schedules for Indonesia, Venezuela and Qatar
Exxon/Mobil Mogas Desulphurization Projects, Billings, MT; Beaumont, TX & Lake Charles, LA
EBI Industries, Inc. Suez 180,000 MTPY Ammonia Complex Proposal
Shell Chemicals Olefins Feed Hydrotreater (OFH) Project, Mobile Site, SaraLand, Alabama
BP Project Future, Texas City, Texas, Petrochemical Units Automation Modernization project
ConocoPhillips/CPC K-Resin Rebuild Project, Houston Chemical Complex; & Unit 40 Revamp, Borger, TX
Tampa Electric Company (TEC) Polk (Gas fired) Plant Expansion, Unit 3 Addition, Mulberry, Florida

CONTRACT WORK @ SEVERAL COMPANIES (See Below) (2 Years)
Senior Management Consultant

OCEANEERING INTL., INC. (GAS Unlimited contract) Houston, TX
Audited, corrected/updated EPC Schedule, Progress Measurement & Procurement, and coordinated with subcontractors for Legendre MOPU Jackup Project for LPT Oil Development in NW Australia.
Oceaneering International, Inc. Legendre MOPU Jackup & Subsea Tie-In Project for NW Australia

STONE & WEBSTER (Enscicon contract), Denver, Colorado, USA
Audited, corrected/updated construction schedule, integrated subcontractor schedules, and loaded Craft Manpower & Resources for Cordova Cogen Power Plant site (Illinois).
Cordova Energy Company, LLC Cordova Energy Center, Cordova, IL. 600 MW Cogen Plant

GENERAL ELECTRIC (Team Associates contract), Slough, London, England, UK
Prepared TISZA Retrofit II (GEII & ABB joint venture) Steam Power Plant Integrated Proposal Schedule.
AES TISZA Power Company GE International/ABB 820 MW TISZA Revamp II proposal, Hungary

EQUISTAR CHEMICALS LP (AEI, Inc. contract), Houston, TX, USA
Developed SAP, IS Dept. & Corporate Resources/Projects Prioritization/Planning Systems
In January 1999, at the Equistar LaPorte plant, I was instrumental in putting the overbudget & behind-schedule Natural Gas Project II and Flex Feed Projects back on-schedule by getting teams working efficiently. Provided Houston Facilities Planning & Construction Expedition.

EQUISTAR CHEMICALS LP
Equistar LaPorte Ethylene plant, Natural Gas II and Flex Feed Turnaround Projects
One Houston Center, Houston Facilities Planning and Construction Expedition
Web-Site Based - IS Dept. Resources Planning & Project Prioritization System
1999 Corporate Capital Budget Prioritization, Cash-Flow & Resources Planning

BECHTEL (Team Associates contract), Houston, TX, USA
Planned Camisea Gas Project (Peru), which was canceled by client, Shell.

SILVERTECH SYSTEMS, INC., Houston, Texas, USA
Directed 26 personnel, organized, developed and guided all Fiber Optical Cable Multiplex Control Systems & Remote Power Modules projects for Petrochemical Plants, Offshore & Subsea in USA division.
Huntsman Chemical, Port Neches, TX - Control Systems (GMR/Graphics) T/A Updates
Shaffer - Deepwater Surface & Subsurface UPS and Control Systems (8 vessels)
Santa Fe Drilling - Deepwater Drilling Vessels Control Systems (3 Vessels)
MODEC - Pemex Floating Production Vessel Control Systems

STONE & WEBSTER (6 years)
Project Controls

Responsible for Project MIS design, set-up, maintenance and Due Diligence. Audited and established standards for, and created, maintained and supervised effective Cost, Finance, Documents and Schedule Project Controls for International & Domestic Power, Pipeline, Petrochemical & Refinery projects. Simultaneous projects ranged from simple small local projects, to the 4 billion US$ TPPI multinational project. During this TPPI project, directed the Planning at 9 locations in 7 countries, participated in Risk Analysis, Due Diligence reviews and Cost Control, and produced periodic Executive Financial Metrics and Status Reports. The TPPI project was the largest at-risk project that S&W had undertaken. When the End-1997 Asian Money Crisis forced shutdown of the project during the middle of construction, S&W did not suffer a negative cash flow, due to the anticipatory contract payment terms that always covered the "Contract Cancellation Liability" at any time. Set-up the Cash Flow and Liability Cost Analysis System before the project started. Was usually assigned to the highest-risk largest projects from their conception, or to recover small/medium projects already behind schedule and/or over budget. - Based at Houston, TX and assigned at Korea, New Brunswick & England. Process studies & proposals for ethanol facility in Hawaii, gas-processing facilities in Texas & Pennsylvania, & pesticide plant in Texas.

Senior Principal Project Controls Engineer

PT Trans-Pacific Petrochemical Indotama (subsidiary PT Tirtamas Majutama) - Main Contract Project team for a "Grass-roots" EPC of a 3 Million MTPY Petrochemical Complex in Tuban province, Java, Indonesia. The Main Contract Project had overall project coordination responsibilities including downstream units, and lump-sum supervision responsibilities for the following EPC projects: He set-up and coordinated update of an Inter-Project Interface Milestones Table. He established scheduling standards, and integrated all project schedules. He reviewed and coordinated planning between all the domestic and international offices. He prepared or assisted in writing the monthly and weekly project reports, Cash-Flow analysis and Special Reviews. He also went to Milton Keynes, England detailed-design office.

Thai Petrochemical Industry Co., Ltd. (TPI) - 16,430 BPSD Deep Catalytic Cracking (DCC) Plant (officially called the Lube Waste Treatment Project) - TPI Refinery Complex, Rayong, Thailand. This grass-roots EPCM project for 110,000 MTPY Propylene, 98,956 MTPY LPG, 177,456 MTPY Napthas, 102,200 MTPY Diesel, 116,000 Fuel Oil, 45,411 MTPY LCO, 28,365 MTPY Isobutylene and 25,000 MTPY Ethylene.

Tenneco Gas Transportation Co., Houston, TX - Compressor Stations Repowering Projects in TX, KY & MS
Full Design for Compressor Stations Revamps
He created/updated Summary and Detailed Integrated Engineering, Procurement and Construction EPC schedules, as well as the EMS cost analysis program, the DDSR (disciplines' deliverables control document), change orders, & Definitive Cost Estimate/Budget. Detailed Progress Analysis was made on critical activities.

JGC/China Petro-Chemical Intl., Inc. / SINOPEC - Maoming 300,000 MTPY Ethylene Plant
Developed and taught other Stone & Webster personnel, a new standardized integrated project controls system to be utilized by all future Stone & Webster projects. In conjunction with the project manager, project engineer and leads, he reviewed the contract documents, and developed/used the Scope of Work Deliverables list, Contract Deadlines List, and Initial Project Manhours Estimate (Budget) based on the new Work Breakdown Structure standard. He developed and bi-weekly updated the CPM schedule, integrated data with the Engineering Management System (EMS) and Document Control Engineering Deliverables list, and generated reports/schedules for the management and leads. The weekly project progress meetings and bi-weekly status meetings were supplemented with "Punch Lists" and communications with management/staff to assure a timely/efficient completion. He integrated the S&W sub-projects, the Process Design Package (PDP) and the Advanced Control System (ACS), with the customer's detailed design, procurement and construction needs.

Thai Olefins Co., Inc. - Thai Olefins Plant and GHU & BHU Addendum Projects
Expanded, redesigned and updated both the Exim Procurement and DCS bar chart schedules. He maintained the total olefins plant schedule. Developed & maintained the additional schedules for GHU and BHU projects.

Chevron, Beaumont, Texas - Ethylene Unit 1544 Expansion (Phase I)
Maintained and bi-weekly updated the Phase I Master Schedule and reports. He developed, and daily updated, MTO, Estimate and Punch list/schedules, coordinating with engineering & procurement leads & management.

Peninsular Gas - GPP4 Malaysian Utilization, 250 MMSCF/D Gas Treatment Plant Expansion
Overseas at Seoul, Korea office, Mr. Brown developed, merged, resource-loaded and corrected engineering, procurement & construction subproject schedules for the separate Stone & Webster, Hyundai and Percon company responsibilities under a master schedule. He interfaced with non-standard computer network equipment, produced bar-chart schedules, work package schedules, time-scaled logic diagrams, and reports.

Confidential Client, Canada - New Brunswick Refinery Instrument Modernization
Developed construction-driven engineering schedule by integrating Engineering & Construction schedules. He coordinated with Engineering & Construction managers & schedulers, & recommended schedule changes.

CONTRACT WORK @ SEVERAL COMPANIES (See Below) (2 Years)
Senior Management Consultant (Project Control, Estimating, Controller, IT Mgr., Safety Dir., Proposals, etc.)

NORTHERN ENGINEERING (1 Year)
Chief Estimator, Project Control and Project Engineering - Cogen Power Projects - Developed/used integrated computer network to provide management with Project Proposal Estimates, Change Order Cost Control & Refutation, Risk Analysis, Cash Flow Analysis, Reports & Planning, Expedited Projects and field start-up.

Chief Estimator

Made Total Installed Cost (TIC) Engineering, Procurement and Construction estimates, using a database of historical costs with inflation, bid quotations, factored costs and standard references. Created and maintained an International Reference Library of regulations, costs and general information. Using Lotus 1-2-3 and estimating computer programs, he established a standardized estimating format, based on a new Work Breakdown Structure, which greatly improved the quality of, and minimized time for, estimates.
Order Of Magnitude Or Factored Estimates - for Conceptual Studies for the following:
Enron Power Corporation - International Cogeneration (150 to 2,500 MW) Power Plants for Burcena and Santurce, Spain; Panama; BASF, Germany; England; and Argentina
* Saranac, NY Cogeneration Plant
* Union Oil, Indonesia - Cogeneration Plant Addition to Petrochemical Plant & Refinery
* Coal Gasification Plant Studies
* Pyrolysis Furnace Studies for Petrochemical, Biomass or Tire Fuels
* Gas Compressors Stations
* Gas Treatment Plants
40+ Detailed EPC Total-Inclusive Lump Sum Proposals for power plants, w/ cash-flow/ proforma analysis, based on MTO's, risk analysis, bid quotations, inflated historical costs, or factored costs
* Minnegasco, St. Paul, Minnesota - University of Minnesota Gas Cogeneration Plant
* Saudi Aramco, Saudi Arabia - Gas Turbine Pre-cooling Power-Supplement Retrofit
* Farmington, NM Electrical Utility Cogeneration Units
* Northern California Power Authority - Two (2) California Cogeneration Plants
* Northern Canadian Power Lykes Pasco and Umatilla, FL - Cogeneration Plants
* Saranac, NY Cogeneration Plant
* COBISHA Texas II Cogeneration Plant
* Cogen Technology, Venezuela, Two (2) Cogeneration Plant Sites for Petrochemical Plants
* Rahr Malt Brewery, Michigan, Cogeneration Plant
* Schenley Brewery, Toronto, Canada, Cogeneration Plant
Detailed Change Order Take-Off Estimates

Principal Project Control Engineer
Created 28 cogeneration power, single power and pyrolysis furnace proposal schedules. Responsible for generation of tabular reports, bar chart schedules, analytical reports, and maintenance/update of schedule for:
University of Syracuse, NY - Orange GAS 225 MW Cogeneration Project

Project Engineer
Expedited and created/implemented a new quality control system in engineering/design drawings for the constructability/feasibility & definitive take-offs for the then "world's largest" cogeneration project:
Enron Power Corporation, Teesside, England - 775 MW Cogeneration Power Plant

ESTIMATORS INTERNATIONAL, INC., Houston, Texas
Scheduler; Project Control Manager, Comptroller; Estimator, Computer Network Supervisor; Office Manager; Safety Director; Backup Project Manager; and Backup Superintendent

BROWN & ROOT - International Power & Infrastructure Projects - Estimates Quality & Risk Analysis

AMERICAN REF-FUEL – Schedule 3 Refuse Disposal-Conversion Power Generation EPC projects

Harris Associates Inc., Las Vegas, Nevada, - Church Street Station & Main Street Development $30 million Casino, Project Control Manager, Comptroller, Estimator, Safety Director, IT Supervisor & Office Manager

HAWKER SIDDELEY POWER ENGINEERING (1 year)
Chief Estimator; Proposals Coordinator; Project Control Engineer

Cogen Power Projects - Established integrated network historical/design/proposal/forecast projects MIS system. As Chief Estimator and Proposals Coordinator, prepared about 25 detailed EPC total-inclusive lump sum proposals for cogeneration and single cycle power plants, with cash flow and proforma analysis, based on MTO's, risk analysis, bid quotations, inflated historical costs, or factored costs. He established a new standard integrated cost gathering and historical cost retrieval computer system going across all company departments. He also made detailed change order take-off estimates for 12 projects.

As a Project Controls Engineer, he prepared schedules for 5 Cogen & Single Cycle power plant proposals.

BROWN & ROOT (1 year)
Scheduler

BRITOIL, LTD., (NOW BP), Glasgow, Scotland, UK (3 years)
Lead Senior Project Engineer

Lead Senior Reservoir/Petroleum/Project Engineer in the Asset Appraisal and Development team of the Reservoir Engineering section of the Britoil Petroleum Engineering Department – He directed the Planning/Scheduling, Alternate Development Design and Analysis for the $4 billion Bruce Oil and Gas Condensate Field, North Sea Development. Analysis included Compositional Reservoir Modeling. Analyses included being official company representative for Intercompany/Government Development, Technical and Unitization meetings. He directly participated in the analysis of the development of scenarios for, and financial/production/cash-flow analysis for:

BELCO CORPORATION, Talara, Peru (South America) – (2 Years)
Chief Engineer (Lead Engineering/Project Manager)

Supervised 86 engineers, 30 designers, 100 contracting companies and crews in a field operation with 20,000 direct/indirect employees, with all of Peru's offshore oil/gas production, oil/gas distribution and offshore terminal facilities, pipe-coating plant, hospital, living quarters, 96 ships/barges, compressor and pump stations, power plant, road/air-strip maintenance, water lines, piers, port facilities, onshore and offshore pipe-laying and construction facilities, 9 drilling rigs, refinery support, communications system, etc. Oil production was increased from 12 to 45 Mbbls/day. Installed 14 platforms/year in up to 420' water depth, and maintained a massive emergency aid effort during the worst flood in Peru's history. Company's profits were doubled, although the oil and gas prices halved. Analyzed Reservoirs and introduced & trained staff in new Completion designs & methods.

CONOCOPHILLIPS, Houston, Texas – (3 Years)
Senior Petroleum Engineer

EXXON COMPANY, USA, ANCHORAGE, ALASKA – (1 YEAR)
Sr. Project/Petroleum (Drilling/Production) Engineer out of Anchorage, Alaska office

SAUDI ARAMCO, Saudi Arabia – (1 Year)
Engineer III (Sr. Drilling/Completions/Testing Engineer) at Ras Tanura, Saudi Arabia

FLUOR CORPORATION, Irvine, California – (4 years)
Subsea/Petroleum Reservoir/Drilling/Completions Engineer

View contact information...
«« previous resume next resume »»
Search Results (Resumes 501 to 550 of 1522)Go to Search Parameters...
Brief Description
Please see attached resume for work history, experience, and education in your related fields.
14 years in the energy community. Expertise in project coordination, technical knowledge, and communication skills. Comfortable with all aspects of industry. Project promotion, development and production through sales and fiscal accountability.
I am a new graduate geologist. During my academic career, I have worked on several large independent and team projects including my master’s thesis. These have developed my independent working, teamwork, and time management skills.
Highly motivated and disciplined. Able to multi-task and prioritize responsibilities in an efficient manner. Adapt well to environmental changes. Possess excellent communications skills. Proficient in all MS Windows and MS Office Products, as well as various land tracking software. Member of AAPL
Costs Analysis; Cost Controlling, Business Development
The resume is a combination of my field of operation which include safety officer and rig medic.
I am C.A Finalist (Institute of chartered accountants of Pakistan) and have completed my articles as per C.A bylaws for the period of 3&1/2 years with Avais Hyder Liaquat Nauman Chartered Accountants (A correspondent firm of RSM international. I have sufficient expertise in account, tax, financial m
Experience with successfully managing all aspects of a large drilling center including implementing manual and automated drilling systems; selecting, managing and training staff.
Christo has been involved in Labour Risk Management, Organizational Development, Human Resources and Training in the private and public sectors for 18 years. His experience in the private sectors covered the broad Human Resources field and he has conducted management training in the public sector. H
MSc in Petroleum Geology.
Seek a position in the area of finance that is both challenging and rewarding. The position should offer professional and personal growth.
Growth with Profit (Marketing, Operations, Sales & Business Development)
Master Mariner/ULCC/VLCC/FPSO/Marine Bulk Oil/Port Captain/Marine Superintendent/Company Representative/Marine-Project-Operations-Manager/Oil Terminal Manager
Goal oriented professional with experience in corporate and agency recruiting, customer service, training & supervision. Proficient at handling multiple tasks simultaneously, problem solving & articulate with strong interpersonal skills.
Post Applied Document Controller
Main job is Seismic Processing Analyst The main Projects 2D, 3D (land &marine), AVO All Projects works include; pre-stack processing, post-stack Processing ,and migration(PSTM_some Projects) ,Velocity Analysis AND build modules , finalizing these projects by writing the processing reports
Training for Entry Position for Oil and Gas Industry (Floorman), Engineer Degree for Fisheries, Experience working for Major Projects and at the Sea, ourdoors and long hours
A Highly Motivated, Vastly travelled and Adaptable Drilling Specialist With over 25 yrs of on/offshore experience – Africa, Middle East and South East Asia – who offers: Expertise in drilling rigs operations, support and mgt; well engineering, HSE coordination; Training, HR mgt & Recruiting.
A Health, Safety & Environment (HSE) Professional with more than 12 years of extensive working experience in Oil & Gas Onshore & Offshore Project, LNG Construction, Commissioning & Start Up.
Bachelor of Agriculture Science (Honors): 1995-1998 Major in Economics U of A, Excellent communication, trouble shooting skills and professional knowledge gained through interaction with public and running own business for the past 3 years.
A Well Services company manager with almost 30 years of industry experience; my background includes working in the oilfield service sector with numerous postings in Canada, Russia, China, and New Zealand. Working with teams of talented people to achieve exceptional results is foremost on my list of
Professional Geologist with petroleum exploration and hydrogeological environmental experience
Courthouse trained on Section/Township/Range and Metes and Bounds in Kentucky and Indiana. Worked three years in ten counties in Texas completing many types of research in courthouses and abstract plants. In East Texas I have spent about 10 months on various curative projects. Worked as trainer .
I have Bachelors Degree in Mechanical Engineering with 18 years Experience India, Middle East and African countries in Oil, Gas sector both onshore and offshore fields.
36 year old gentleman looking for a job as a rigger. I have been in this industry for years, please feel free to contact me if ther is anything more you would like to no about me. Thank you
Experienced Work Over & completions wellsite Supervisor, safety orientated, Well Site Testing, Perforating, CBM Fracing, WIreline, Slickline, Logging, Fishing, Swabbing, Snubbing, Cementing, Coil Tubing, Heli-Portable Supervision, Project Coordinating
Project Interface Manager, Stategy Planning, Engineering/Projects Development/Management/Controls
Expeditor and site buyer. Currently based in Italy, I will be relocating to Australia towards the end of the year with the possibility of moving earlier in the event of an employment offer.
looking for a doorway into oil and ind.
Onshore/Offshore Medic,very experienced medical doctor with long years of medical service
Computer knowledge ( Word,Excel & Powerpoint) , Safety & Health Occupational Course , Dilpoma in Secretary Sciene
Working as bars manager I have got good skills to work with team of people supervison make sure all standarts are achieved. Duty manager shift responsible for whole hotel.
Expertise in Contracts & Materials Management field of Vendor Development, Materials Procurement, Expediting etc.
Knowledge in Electronic Document Management Systems and excellent computer skills
Network Administrator Looking for a challenging job in the field of Project Management, Network Installations and Internetworking, which provide me with a completive and healthy environment and enables me to build up an excellent career.
Highly experienced and motivated Electrical Technician with over 16 years in the Oil and Gas industry having Electrical Installation, Commissioning and Testing experience, of which several years were spent in the Drilling and Exploration as Chief Electrician, on a Mobile Jack Up Unit.
I have worked as HSE Consultant with multinational Oil companies on Seismic survey and at rigs. I have earned M.Sc. and M.Phil degree in geophysics with research on environment in M.Phil.
I have a large experience in erosion control works for pipelines
Contact ASAP
Tax Specialist
on/offshore seismic data acquisition.Field seismic QC.Seismic recording: SN 388.DESIGN 3D Layout.and NAVIPAC as navigator.Deployment/recovery of seismic devices.Trouble shooting and attend to work shop.
I have been fortunate enough to work all over and have seen many different angles to get the job done. All in all, I work very hard to stay organized and focused on the job. I have +2 yrs experience. I am always willing to learn more at any job to be the best at it.
Emergency Officer with the experience of 10 years in safety and emergency management .
Mechanical Engineering (Rolls-Royce U.K. Limited). Canadian Inter-provincial certification in Industrial Mechanical Maintenance. Extensive experience in Maintenance and Maintenance Planning.
Librarian / Information Management / Information Scientist / Document Controlle
I have knowledge in Maintenance and Operation procedures. My experience is in PM's, Reliability, Planning & Scheduling. I would like to continue to grow in the Petroleum Industry and at present I am continuing my education in Operation Controls. I am also very interested in offshore or shift work.
Open in the Oil and Gas industry that will utilize my strong business/economics educational background, and accounting experience.
I have eight years experience in the petroleum industry and five years experience in construction. I am also an experienced medical technician. I am skilled in the Spanish language. I have instructed Water Safety and Survival courses. I am comfortable working with personal computer systems.
Drilling Fluids Engineer / Consultant with expertise in all drilling fluids including Silicates, Glycols and syntetics. Expertise in deep water, ERD and HPHT enviroments. Skills in operations, coordination, tendering, well site, marketing and presentation
IIT Chemical Engineer with 23 yrs exp in Sales & Marketing of Downstream Petroleum & Petrochemical Products in a Fortune-500 Oil & Gas Company
1   2   3   4   5   6   7   8   9   10   [ 11 ]   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31  
Seach Parameters

Change search parameters...
CATEGORIES: Other;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com