List of present & previous Company
Jun 2006 to present: Carigali Hess Operating company Sdn. Bhd.
Nov 2004 to May 2006: OGP Technical Services Sdn. Bhd.
Nov 2003 to Nov 2004: Arashins Services (J) Sdn. Bhd.
August 2003 to Oct 2003: K & K Sepadu Sdn. Bhd.
July 2002 to July 2003: Arashins Services (J) Sdn. Bhd.
Feb 2002 to May 2002: Yongchan Jaya Engineering Sdn Bhd
April 2001 to Jan 2002: Alstom Export Sdn. Bhd.
Sept 2000 to Feb 2001: Amerstrand Engineering Sdn. Bhd.
Sept 1999 to May 2000: Malaysia Shipyard and Engineering Sdn. Bhd.
March 1999 to July 1999: Penang Shipbuilding and Construction.
June 1998 to Feb 1999: Gunawan Iron and Steel Sdn. Bhd.
June 1996 to May 1998: Time Salam Lavalin Construction J. V.,SNC & GTMI J. V.
Dec 1994 to May 1996: Teknispek Sdn. Bhd.
Nov 1993 to Nov 1994: Sime Sembawang Engineering Sdn. Bhd.
July 1992 to Nov 1993: Malaysia Shipyard and Engineering Sdn. Bhd.
Course Attended
July 2006: Incident Investigation course
Conduct by Risk Global Technologies Sdn. Bhd.
Kuala Lumpur.
June 2006: Basic Offshore safety, Sea survivaland helicopter underwater
Escape training, basic fire fighting, first aid CPR/EAR.
Offshore safety Sdn. Bhd. Kuala Lumpur.
May 2001: Construction Industry Development Board Malaysia (CIDB)
Supervisor for Mechanical Works
August 2000: Welding Inspector CSWIP (RTO / QA7)
Ruane & T. P O'neill. TATI Terengganu.
Sept 1994: Magnetic Partical Inspection Course
Organised by Mr. Saharuddin Kambari
NDT Level III from NDE Consultancy Services
June 1994: Total Quality Management (TQM)
Conducted By Mr. Azaddin Aziz
QA/QC Manager
Sime Sembawang Engineering Sdn. Bhd.
Pasir Gudang Johor.
Nov 1993: In House Training ASNT Level II MPI and DPI
Sime Sembawang Engineering Sdn. Bhd.
Working Experience (1)
Turn Around / Shut Down Jobs
Nov to Dec 2002: Corro-shield (M) Sdn Bhd. Miri Sarawak
Position: Inspector
Location: Petronas Methanol (Labuan) Sdn. Bhd.
WP Labuan. Sabah.
Jun 2002: Arashins Services (J) Sdn Bhd
Position: Inspector
Location: 1) Kaneka (M) Sdn Bhd, Gebeng, Kuantan
2) Petronas CUF (M) Sdn Bhd, Kertih, Terengganu
May 2002: S. E.M Inspection Sdn Bhd, Shah Alam, Selangor
Position: Inspector
Location: PSR-1 Turn Around May 2002
Petronas Penapisan Melaka Sdn Bhd
Sungai Udang, Melaka
July 2000: Pakaruji Sdn Bhd.
Position: Inspector
Location: FPG Oleo chemical Sdn Bhd, Kuantan, Pahang
Working Experience (2)
Jun 2006 to present: Carigali Hess Operating Company Sdn. Bhd.
Position: Structural Welding Inspector
Project: Brown field Construction (Fast Track Project)
Cakerawala Gas field Development Phase 2
KHL yard. Lumut Perak.
Scope of Work: Monitor All welding NDT activities as per contract requirement (structure and Piping).
Review NDT result and witness Welder Qualification
Test (WQT) to qualify welder.
Signing inspection report of acceptance of all the above inspection results.
Monitoring contractor work activities to ensure all works are performed in accordance with the specification and procedure.
Report to the Client Site Representative (CSR) for area assignment.
To monitor weld summary record and compile for the final documentations
Monitor tie-down jobs during load-out activities
Nov 2004 to May 2006: OGP Technical Services Sdn. Bhd.
(A Member of PETRONAS Group of Companies)
Client: Petrodar Operating Company (PDOC)
Republic of Sudan,
Position: Welding Technical Inspector
(Project management Consultant)
Project: Central Processing Facilities (CPF)
Al-Jabalayn site
MELUT Basin Oil Development Project
Block 3&7 (Upstream)
Republic of Sudan,
Scope of Work: Monitor all welding and NDT activities as per contract requirement (piping, tanks. Pipeline, mechanical and pile caps)
Review NDT result and witness Welder Qualification Test
(WQT)to qualify welder.
Signing inspection report of acceptance of all the above inspection results.
Monitoring contractor work activities to ensure all works are performed in accordance with the specification and procedure.
Report to the site manager for area assignment
Dec 2003 to Nov 2004: Arashins Services (J) Sdn. Bhd.
Taman Rinting, Masai, Johor Darul Ta'zim
Client: Sime Sembcorp Engineering Sdn. Bhd.
Pasir Gudang, Johor.
Position: Structural Welding Inspector
Project: Talisman Energy
East Bunga Raya BR-E CO2 PLATFORM.
: West Africa Field Development FPSO Project
MODEC International LLC. Singapore.
(Fast Track Project)
Scope of Work: Liase with client representative and PMT on matter related to quality.
Perform Inspection as per ITP.
Monitor of all welding activities during fabrications
Request NDT on Complete joint as per contract requirement
To monitor weld summary record and compile for the final documentations
Monitor tie-down jobs during load-out activities
August 2003 to November 2003: K & K Sepadu Sdn. Bhd.
Petaling Jaya, Selangor.
Client: Gas Malaysia Sdn. Bhd.(GMSB)
Position: Pipeline QC Supervisor
Project: EPCC of NGDS to Super Food Technology (6 inch-1.75km)
Mukim Plentong, Masai, Johor Darul Ta'zim.
Scope of work: Witness and monitoring welding activities,
Fit-up and visual inspection of each weld,
Witness and monitoring holiday testing and wrapping around the joint,
Request and monitoring Radiography activities,
Preparation Pre lowering acceptance report and lower in report, approval for backfill.
To monitor weld summary Record and compile for the final documentations.
July 2002 to July 2003: Arashins Services (J) Sdn. Bhd.
Taman Rinting, Masai, Johor Darul Ta'zim.
Client: Sime Sembcorp Engineering Sdn. Bhd.
Pasir Gudang, Johor.
Position: Structural Welding Inspector
Project: Petronas Carigali Sdn. Bhd.
Angsi C & E Topside and Jacket
(Fast track Project)
Sarawak Shell Berhad
B11DR-A Jacket
Scope of Work: Liase with client representative and PMT on matter related to quality.
Perform Inspection as per ITP.
Monitor of all welding activities during fabrications
Request NDT on Complete joint as per contract requirement.
To monitor weld summary record and compile for the final documentations
Monitor tie-down jobs during load-out activities
Feb 2002 to May 2002: Yongchan Jaya Engineering Sdn Bhd
Johor Bahru, Johor
Position: QA/QC Supervisor (Structural, Piping, painting)
Project: Gadong Power Station
Brunei Darussalam
Client: Shinwa Corporation Pte. Ltd. Japan
Scope of work: Arrange sub-ordinate to do the job as per client's requirement.
Inspection of all fit-up and visual during fabrication and installation as per ITP.
Perform dimensional check of structure
Perform Welder Qualification Test (WQT) to qualify welder.
Review NDT report before submit to client for review.
Monitor and inspect on painting work after fabrication.
To monitor weld summary record and compile for the final documentation.
April 2001 to Jan 2002: Alstom Power Sdn. Bhd.
Petaling Jaya, Selangor
Position: Piping Inspector
Project: 3 x 700 MW Combined Cycle Coal Fired Boiler
Manjung Power Station, Perak.
Scope of work: Inspection of all fit-up and visual during pre- fabrication and installation.
Perform Welder Qualification Test (WQT) to qualify welder.
Review NDT report before submit to client for endorsement.
Perform line check together with client and sub-
Contractor for any rectification.
To monitor coating work for underground pipe line(fresh water)
To witness for flushing and hydro test, to monitor weld summary record and compile for the final documentation
Sept 2000 to Feb 2001: Amerstrand Engineering Sdn. Bhd.
c/o SIME Sembcorp Engineering
Pasir Gudang, Johor
Position: Qa / Qc Coordinator Piping
Project: Petronas Carigali Sdn. Bhd.
Angsi- A Topside
Scope of work: Arrange subordinate to do the job as per client request.
Inspection of all fit-up and visual during pre-
fabrication and installation.
Perform line check together with client and sub-
Contractor for any rectification.
To witness for flushing and hydro test, to monitor weld summary record and compile for the final documentation
Sept 1999 to May 2000: Malaysia Shipyard and Engineering Sdn. Bhd.
Pasir Gudang, Johor.
Position: QC Inspector Structural & GRE Piping
Project: Petronas Carigali Sdn. Bhd.
ANDR-A Topside and Jacket.
Scope of work: Inspection of all fit-up and visual during pre-
fabrication and installations
Liase with client representative and PMT on matter related to quality.
Perform Inspection as per ITP.
Monitor of all welding activities during fabrications Perform line check together with client and sub-
contractor for any rectification.
To witness for flushing and hydro test, to monitor weld summary record and compile for the final documentation.
March 1999 to July 1999: Penang Shipbuilding and Construction Sdn. Bhd
Kemaman Supply Base (KSB) Kemaman, Terenganu.
Position: QC Inspector Piping & Structural
Project: Esso Production Malaysia Inc (EPMI)
GUD-12 Angsi Host Tie-in and Tabu-11 Gas Injection
Scope of work: Conduct welder qualification test, prepare welder certificate, carry out material inspection, material verification, fit-up inspection, visual inspection, request NDT, interpret RT result, prepare hydro test report, prepare welding summary and prepare manufacturing data report.
June 1998 to Feb 1999: Gunawan Iron & Steel Sdn Bhd
Phase 2 Project
Kemaman, Terenganu
Position: Welding QA/ QC Inspector (Piping & Mechanical)
Power Station Department
Scope of Work: Carry out inspection of structure, piping including underground pipeline (coating work) and pressure vessel such as material inspection, fit-up inspection, roundness inspection, straightness inspection,
Witness hydro test, NDT final inspection and prepare manufacturing data report.
Supervise all welding and NDT activities as per contract requirement.
Review NDT result and recommend acceptance/ rejection of contract work.
Report to the respective area Construction manager for area assignment.
Material receiving, inspection of material equipment and approved equipment for installation on site.
Inspected and verified positioning of equipment prior to anchor bolt grouted.
Inspected and verified verticality, horizontality &
levelling of static and rotating equipment.
Inspected and verified preliminary alignment, pipe stress and final alignment of rotation equipment.
Welding inspection for fabrication of shell and water box condenser (Fit-up, visual and witnessed N. D.T
Inspection).
Signing inspection report of acceptance of all the above inspection results.
Monitoring contractor work activities to ensure all works are performed in accordance with the installation specification and procedure.
June 1996 to May 1998: Time Salam Lavalin Construction J. V.
Taman Megah, Petaling Jaya
Project: PUTRA-KLRT System 2 (for Kuala Lumpur)
Position: QC Inspector (Track Work, Civil & Welding)
Scope of work: 1) Checking concrete work as per Stated below:
- Slump Test
- Pressure Test
- Dial Gauge Test
- Sieve Analysis & Moisture Analysis
- Checking & Supervising casting Concrete Operation
- Checking as built thickness of panel according to drawing and cut sheet
- Filing report and submit to QC Manager.
2)Track works as per stated below:
- Study drawing, specification and procedure of works.
- To observe and witness with format sheet for operation progress as per stated below:
- assembly and placement of turn out
- assembly and installation special track work
(cross over) tie placement and spacing rail installation flash butt welding
- thermit welding bonded joints distressing operation linear induction module installation
- power rail study and power rail installation
- cable trench installation — fine tuning track
- filing report and submit to QC Manager
3)Cut & Cover Work (tunnel section) as per stated below: — Inspection of Bored Pile:
- with 600 mm, 800 mm & 1200 mm of diameter.
- Checking reinforcement before installation
- Checking concrete before pouring.
- Inspection of Starter Bars:
- measured and make sure length of the starter bars as in order refer to the drawing.
- Checking the reinforcement for base slab before concreting
- Dealing with sub contractor & consultant.
- Reporting to QC Manager & Consultant.
December 1994 to May 1996: Teknispek Sdn Bhd
Damansara Height Kuala Lumpur
Position: NDT Technician
ASNT Level 2-MPI & DPI
ASNT Level 1-UT
ASNT Level 1-RT
Assistant General Inspector
Project: Esso Production Malaysia Inc (EPMI)
Offshore: Jerneh-A
Semangkuk-A&B
Guntung-A&D
Tapis-A,B,C&D
Seligi-A
Bekok-A
Tioman Drilling (T-2)
Onshore: Sludgecatcher Terminal (OSC) Kerteh.
: Terengganu Crude Oil Terminal (TCOT), Kerteh.
: Tepat Teknik, Kemaman Supply Base(KSB),Kemaman.
: Petronas Penapisan Terengganu (PPT), Kerteh.
: Promet-Petronas Terengganu, Teluk Ramunia, Johor.
: Sarawak Shell Berhad(SSB),Pasir Gudang, Johor.
: Antara Steel Sdn. Bhd., Pasir Gudang, Johor.
Scope of work: To carry out Magnetic Partical Inspection and Dye
Penetrant
: Inspection and Radiography Testing on various type of weld configuration and other material.
: Thickness measurement of material.
: Job including reporting and documentation as per client requirement.
: Shutdown job.
Nov 1993-Nov 1994: Sime Sembcorp Engineering Sdn. Bhd
Pasir Gudang, Johor
Position: NDT Technician
ASNT Level 2
Project: EPMI Jerneh 'A'
- Compression Module 2
- Compression Module 3
- Compression Module 4
- Compression Module 5
: EPMI Guntong 'D'
- Production Module 1
- Production Module 2
- Production Module 3
- Production Module 4
Scope of Work: Performed MPI on various type of beam plate and pipe with various diameter.
: Performed MPI and DPI on piping with various material type
Project: Sarawak Sheel Berhad (SSB)
- M 1 Living Quarters
- M 3 Living Quarters
Scope of Work: Performed MPI on M 1 and M 3 plate girder fabrication.
Project: Sarawak Shell Berhad (SSB)
Integrated Production Module-M3PQ-A
Scope of Work: Performed MPI on M3PQ-A Structure.
Project: Tenaga Nasional Berhad (TNB)
Diverter Valve and Guillotine for Pasir Gudang Power
Station and Paka Power Station.
July 1992-Nov 1993: Malaysian Shipyard and Engineering Sdn. Bhd.
Pasir Gudang, Johor.
Position: Machinery Fitter
Scope of Work: Performed Overall Ship Maintenance.
: Repairing for diesel main engine and accessories.
: Repairing for diesel generator engine and accessories.
: Repairing and alignment for shafting and propeller.
: Repairing and alignment for turbo charger turbine engine.
: Repairing for anchor winch.
: Repairing for marine gearbox and marine clutch.
: Repairing and alignment for electrical pump and centrifugal pump.
: Repairing for hydraulic and pneumatic system.
: Repairing many type of valve.
: Repairing for bow trustier at marine container ship.
: Sea-trial.