Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #6341
next resume »»
CONTACT INFORMATION:
View contact information...
Knowledge:
Sound experience of using various Document control systems and extensive knowledge of computer packages including Word, Excel, WordPerfect, Access, Microsoft Office 2000, Outlook, Power Point, Adobe Acrobat, and Convero
Summary:
Experienced Project Document Control Supervisor working on large-scale on-shore/off-shore projects past 8years. Experienced in handling design/vendor packages, expediting of subcontractor's package, Document Control, scheduling, progress reporting, good communication skills and telephone manner, flexible and adaptable, able to lease effectively at all levels. Self-motivated and resourceful, operating on own initiative or as an effective team member.
Employment:
Jan 2003 – Present: Senior Document Controller - (WESTERN LIBYA GAS PROJECT)
* Saipem UK Limited - Responsible to AGIP Gas BV (Client)
* Action taken promptly for various queries when raised by Clients.
* Managing the document control department under my own supervision.
* Chasing engineers to return the vendor documents and in-house drawings on time.
* Co-ordinating with the head of delivery and development, to ensure that required documents are obtained and distributed correctly.
* Responsible for the archiving of project documentation and ensuring that client can easily retrieve them.
* Providing various reports for project management, client, site personnel and subcontractors.
* Maintenance of electronic and paper filing systems and associated logs.
Nov 2002 – Jan 2003: Senior Document Controller - National Physical Laboratory, Teddington
* Responsible to Project Manager for the construction
* Design & implementation of document/procedural/Computer system.
* Action taken promptly for various queries when raised by Site or Clients.
* Issuing and tracking of drawing and documents.
* Expediting outstanding returns from package engineers and suppliers.
*
Mar 2001- Oct 2002: Senior Document Controller (CORRIB FIELD DEVELOPMENT
PROJECT-IRELAND)
* AMEC Capital Projects, Responsible to Project Manager.
* Construction, Design & Implementation of document/procedural/Computer system
* Chasing engineers to return the vendor documents and in-house drawings on time.
* Action taken promptly for various queries when raised by Site or Clients.
* Ensure communication flow to Client and Partners (Hard and Electronic)
* Issuing and tracking of drawing and documents.
* Vendor Control system and communication
* Expediting outstanding returns from package engineers and suppliers
* Highlighting areas of concern.
Nov 1999 – Mar 2001: Document Controller (Hotel Property Investors)
DOCUMENT CONTROLLER holding the following key responsibilities:-
* Overseeing and managing day to day operations.
* Delivering weekly reports and ECN status to the Consultants and Sub-Contractors.
* Organizing Weekly Reports on drawings and Materials status.
* Providing weekly follow up documents and drawings to Consultants.
* Implementing and drawings to be identified from the Sub-Contractor and issuing to in-house engineers for review.
* Implementing weekly reports to the Project Manager.
* Overseeing and checking quantities and item descriptions against delivery note.
* Ensuring all material is log onto Excel Spreadsheets.
* Producing material reconciliation reports.
* Supervising site personnel.
Feb 1999 – Oct 1999: Senior Document Controller (London Jubilee Line - Underground)
* London Underground Limited - Responsible to Project Manager.
* Design, implementation and setup of Document Control systems.
* Liaison with Main and Sub-contractor to ensure communication flow of a high standard.
* Ensuring all material are log onto Excel Spreadsheets.
* Producing material reconciliation reports.
* Overseeing and checking quantities and items descriptions against delivery note.
* Overseeing and co-ordination the receipt and review of Sub-Contractor as built drawing and project closeout documentation.
* Managing the processing of all documents to ensure details are added to the database and transmittals created for the distribution of document to various department and engineers.
* Managing various reports according to each discipline/category by internal and external Engineers and Sub-Contractors.
* Supplying the site team with details information.
Jan 1998 – Feb 1999: Document Controller (British Airways Hotel - Heathrow Airport)
John Laing Construction Limited:
* Sole control of all aspects in document control on the projects.
* Visiting Sub-Contractors on site.
* Delivering reports to clients and Senior Managers.
* Updating all drawings in the drawing office.
* Overseeing and checking orders for customers.
* Administration and preparation and report writing.
Apr 1995 – Jan 1998: Senior Document Controller (RELIANCE JAMNAGAR REFINERY &
PETROCHEMICALS COMPLEX PROJECT)
Bechtel Limited
* Identifying, organizing and supplying documentation.
* Dealing with the maintenance of suitable records of all documentation.
* Issuing the progress report to Project Management scanning of all-important engineering and supplier documents.
* Managing the processing of all documents to ensure details are added to the database and transmittals created for the distribution of document to various department and engineers.
* Liasing with Design Contractors DCC.
* Filing, maintaining documents
Mar 1994 – Mar 1995: Document Controller/Technical Assistant
Noble Denton Limited
* Responsible for logging all incoming and outgoing correspondence, extensive use on various computer packages and managing project related timesheet records up to date.
* Filing and maintaining documents
Jun 1992 – Jan 1994: Document Controller (Thames Water)
Thames Water Utilities.
* Inputting of supplier's documentation onto tracking database.
* Main responsibility-tracking of engineering documentation.
* Filing all documents and maintaining.
* Issuing of weekly reports.
Jan 1992 – May 1992: Legal Assistant – (M.O.D Legal Department)
M.O.D – London
* Responsibilities included maintenance of all MOD legal documentation.
Nov 1985 – Jan 1991: Project Technician (Standard Equipment Group)
Air Products Limited
* Main Responsibility tracking all purchase orders and invoices.
* Issuing purchase orders materials under £3000.00.
* Attending weekly meeting.
* Archiving of all original documentation within standard engineering group.
* Compiling schedules registers and reports on daily/weely/monthly basis.
Education:
1970 – 1975: Rockby High School – Startford, London E15.
5 GCE O'Levels including Maths and English.
1975 – 1976: East Ham Technical College – London E6.
City & Guilds in Computer Programming.
References will be provided on request.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 251 to 300 of 1522)
Go to Search Parameters...
Brief Description
Experienced Landman
Seeking Royalty Owner Relations Position
I have worked as development geologist, geophysicist and production geologist. I have worked with seismic data, well log correlation and interpretation; creating and interpreting pressure, GOR, rock properties maps; well interaction analysis.
Internship experienced geologist seeking full time position
SAP BW/BI Techno-Functional COnsultant
Infor, Datastream, Maximo
I have the skills to work in “a smoke-free environment” which suits me much, ability to work independently, recognize and prioritize tasks. I have an experience of translation from English into Azeri and Russian and vice versa, both oral and written.
Hull structural engineer for 6 years, tribon and autocad user
Experienced in trouble shooting ships electrical automation systems, DP electr. maintenance
Excellent safety and attendance record. Through knowledge of area roads, highways,airports. Proven record of completing all tasks on schedule and safely. Experienced in operating heavy machinery. Excellent knowledge in rig pumps and equipment. Drilled on rigs ranging from 1800-4500m.
Seeking an opportunity in accounting or finance. Very ambitious and ready to take any challenges presented.
Master Science + engineering diploma + physic teacher
(2000-Present) Day and Night Drilling Supervisor in Petroiran Development Company (PEDCO) - Persian Gulf - Jack Up Rigs - HPHT with Sour Gas Environment - Exploration, Delineation, Development, Workover, Re-Entry, Directional, Horizontal, Multilateral Wells.
I have more than 11 years of experience in petroleum and water testing in laboratory.
10+ years experience in Oil and Gas industry construction, Drilling, Beam pump Maintenance, Rig Movement Operation, Preparation of Drill site base operation, ware house operation, Construction of 132 KV transmission line, substation & switch yard bay extension, Construction of 33 KV OHL & 33 KV Swi
Skills : Purchasing / Contracts, Oracle, Maximo, MS-Office, Peachtree Qualifications : Masters in Business Administration , Graduation : Economics, Oracle Certifications and few professional trainings for Purchasing/Supply Chain Management
PDS Piping & Equipment Modeling(Oil Industries)
Geologist Based On Oil And Gas Platform
Highly motivated person that has had the chance to work both independently and in teams in various industries. Education-related experience has included research in a lab environment that has enabled me to gain in depth knowledge in the area of Mercury Intrusion Capillary Pressure (MICP) analysis a
8 yers experiance safety officer
I am seeking a position as a Medic where my skills, previous experiences and currant safety training will provide your company with a professional medical service. The attached resume details my 24 plus years of military and offshore experience.
Bachlor Degree in Science, Diploma in Industrial Safety,Certificate course in fire Engineering,first Aid Trainning froom ministry of health ,kuwait
welding by an electric arch and welding by gas.The experience of work over 10 years.
Document Controller
ENVIRONMENT ENGINEER
2002- Present Head of Upstream Joint venture of NPC/SASOL 1998- 2000 Sr. Process Eng. IOOC / TS (TOTAL SIRRI) 1994- 1998 Production Eng. SIRRI /KHARG/LAVAN ISLAND
Skilled HSE professional seeking employment
Develop QMS per ISO 9001:2008, certified lead auditor
MSc. in petroleum geology, University of Tehran
IT specialist, professionally qualified in Management and Computers(M.B.A Information Systems, Masters degree in Computers) with 10 years of proven hands-on experience in Computer System Analysis, System Support, System Administration, Networking, Database development and management.
Past 20 years I been working as Document Controller, at present working for Saipem UK ltd as Senior Document Controller.
Bilinhual: Spanish / English, Computer Literate, International Experience.
I possess technical skills which includes the use of data anaylsis softwares, microsoft office applications and excellent communication and interpersonal skills. For that of my qualifications, i had BSc in geology and also MSc in Applied Marine Geoscience
Experience Petroleum Landman
I am very safety conscious and believe that safety is first priority. I am a great leader and have good communication & organizational skills. I work well with others. I am punctual and reliable. I take pride in my work and am always eager to learn. I will make a good addition to any organization.
I am a In-house Landman with 5 years experience.
I am a Rig Manager on a Service ( Workover) rig. I have experience with oil and gas completions and workovers in Alberta canada. Deep and shallow. I also have experience with heavy oil in Albania and Canada.
Worked as a geophysicist in the E&P industry for a period of two years. • M.S Geophysics, Rice University
Editor
PhD candidate with experience in hardrock and softrock
Materials, Logistics, Asset, Warehouse Management
DCS/CONTROL ROOM/PRODUCTION/PROCESS OPERATOR
Attorney specializing in Land and Oil/Gas Law
Medic wityh 14 years experience
An adaptable Materials Controller with specialist strengths gained onshore, offshore and overseas. Supervisory and hands-on experience, with the ability to communicate at all levels in a fast moving environment. Experience in Drilling, Construction, Maintenance and Production.
Application for Offshore Drilling Rig Mechanic
Accountant with considerable experience in industry
Dear Sir or Madam: I hope you take this CV in your database for future reference. If there is an opportunity on this moment as a Barge Engineer or Offshore Installation Manager within your company on international base I appreciate if you contact me.
I am a professional construction supervisor - Self-motivated with strong construction management skills, backed by extensive O&G industry experience, onshore /offshore.
Im a computer programmer since i started working in 1990 i know cobol,unix,informix ,sql,v.basic,oracle
1
2
3
4
5
[ 6 ]
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Seach Parameters
Change search parameters...
CATEGORIES:
Other;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com