CONTACT INFORMATION:
View contact information...
PRECISION MILLWRIGHT
OBJECTIVE:
To obtain a position in the engineering field, that offers professional, as well as personal growth opportunities with an organization that recognizes my achieved skills and personal/professional work ethics as an asset.
WORK HISTORY:
May 2008 – May 2008
Millwright
Turner Ind. - Hodge, LA
20 Day Shutdown
Installed Beloit re winder Paper Machine
April 2008 – May 2008
Millwright
RSO - Tulsa, OK - Westinghouse
Power Plant
Turbine and Generator Overhaul
February 2008 – April 2008
Millwright
Colorado Energy – Hobbs, N.M.
Power Plant
GE Steam Turbine and Generator Overhaul
December 2007 – December 2007
Millwright Foreman
SIMMCO - Maverick Tubing – Blytheville, AR
Pipe Manufacture and Threading Facility …. 10 Day Shutdown'
Rebuild threader under manufacture guidance (PMC Colinet)
August 2007 – December 2007
Millwright General Foreman
Gemma Power Systems, CT – Carlton, NE
Ethanol Plant 100 Million Gallons per year
Construction of new plant, install various components and equipment throughout plant such as centrifuges, screw feeders, blowers and fans, also setting chemical pumps and motors, tanks and vessels throughout plant site. All equipment leveled and set at elevation as per manufacture specs.
December 2006 – July 2007
Millwright Superintendent
SIMMCO – Colorado Energy –Kosciusko, MS
Disassemble and remove steam turbine, generator, H.P. & I.P. turbines, feed pumps and all other auxiliary equipment including piping and valves to relocate in Hobbs, New Mexico.
November 2005 – November 2006
Millwright
H&M Industries – Atlas Tubing Manufacture – Blytheville, AR
Construction of new facility, assemble and install various equipment such as rolling machines, forming machines, cutters, pumps and motors. Including hydraulic systems and units, all equipment set to elevation as per specs and all couplings aligned to within. 002 of in inch.
November 2005
Millwright Foreman
SIMMCO – Nucor Bar Mill – Jewett, TX
12 Shutdown
Remove and replace various equipment throughout plant used for manufacturing – rebar, flat bar, angle iron.
October 2005
SIMMCO – Gerdau Ameristeel – Sandsprings, OK
Millwright
3 Week Shutdown – Bar Mill
Remove and replace various equipment throughout plant used for manufacturing rebar, flat bar, angle iron.
September 2005
SIMMCO – V&M Star – Youngstown, OH
Millwright Foreman
21 Day Shutdown- - Seamless Pipe Plant
Remove and replace various equipment and conveyors throughout plant.
August 2005
SIMMCO – Blue Scope Blue Steel – Delta, OH
21 Day Shutdown
Remove and replace various equipment throughout plant, rollmill stands, hydraulic units, various piping modifications.
July 2005
SIMMCO – Nucor Steel – Blytheville, AR
2 Week Shutdown
June 2005
SIMMCO – North American Steel – Ghent, KY
2 Week Outage – Stainless Steel Sheet Mill
Remove and replace conveyor systems, installed various pump and motors throughout plant.
March 2005 – May 2005
SIMMCO – Nucor Steel Mill – Blytheville, AR
Millwright
Assemble and install various components and equipment throughout plant. Hydraulic rams, valves, and motors.
February 2005 – March 2005
WPS Industries, Valdosta, GA
Trust Joist Plant
Install new sections of conveyors and cyclones; various piping and tubing modifications throughout plant.
January 2005 – February 2005
WPS Industries – Cordele, GA
3 Week Shutdown - Plywood Plant
Replaced various sections of conveyors and replaced various equipment throughout plant.
December 2004 – January 2005
WPS Industries – Oakdale, LA
6 Week Shutdown – Plywood Plant
Installed new cabover wood lathe and feed conveyor.
July 2004 – December 2004
SIMMCO – Owens Corning Glass Plant – Jackson, TN
Various equipment replacement and modifications of existing equipment throughout plant.
October 1999 – June 2003
Harley Valve – Norfork, VA
Mechanical Technician
Overhaul and repair various types of valves – gate, glove, butterfly, stop check, swing check, relief valves and inline pressure seal valves. Operating honing machines, lap master, hydro and test stand set-ups.
February 1997 – March 1999
Bay Mechanical, Inc. – Virginia Beach, VA
Millwright Foreman
Supervised the repair, installation and troubleshooting of various components and equipment in the synthetic paper industry, such as; extruders, mixers, ovens, sheet cutters, wrappers and conveyor systems, vacuum systems, various pipe fabrication and valve work. All Equipment was set and aligned with the metric system as per Mitibishi Heavy Industries out of Tokayo, Japan
March 1995 – January 1997
Hydraulic Repair Corporation, Portsmouth, VA
Mechanical Technician
Assemble, install, troubleshoot and repair hydraulic rams, pumps, valves and motors for various industrial applications. Manufacture hydraulic hoses and other appurtenances. Operate machining tools, test stands, honing machines and other shop equipment including welding and burning skills. Ability to work from blueprints and schematics.
1985 – 1990, 1992 – 1994, 2000 – 2002
Marine Hydraulics International, Norfolk, VA
Mechanical Supervisor
Supervised the repair, troubleshooting and installation of various shipboard engineering components to include: combustion turbines, marine boilers, reduction gears, propulsion steam turbines, steam turbine generators, diesel engines, hydraulic equipment, main propulsion shafting systems and propellers (inclusive and variable pitch), freshwater distillation plants, pumps, bearing and shaft tolerances, coupling alignments within. 002 "face and para". High-pressure piping systems, extensive valve repair and overhaul experience. Supervised and directed the work efforts of up to 10 man crews and up to 10 jobs occurring concurrently. Responsible for development of work scope, job critical path, obtaining the appropriate parts and materials. In charge, with reporting of progress and completion activities to U. S. Government and civilian customers.
1990 – 1992
Moon Engineering Co. – Portsmouth, VA
First Class Mechanical Technician
Responsible for the repair, troubleshooting and installation of various shipboard engineering components as listed above. Extensive alignment experiences, valves repair and overhaul. Operate machine tools, lap-master, hydro and test stand setups.
EDUCTION:
High School – Haywood High School – Brownsville, TN
GED Equivalency – Commonwealth of PA 1982
Quality Assurance Qualified, Moon Engineering, Marin Hydraulics
Structural Weld Test – Certified at SIMMCO and Gemma Power Systems
EQUIPMENT
Familiar with all inside/outside micrometers, venire calipers, dial indicators, 98 Levels, Tripod Levels, and all lift equipment.
View contact information... |