Education BS (Eng.) in Civil/structural Engineering in power station
University of Wuhan, Institute of Hydro-Electric Power, 1983.
MSc (Eng.) in Construction Management and Engineering (project management, procurement management, contract and law, project finance, Engineering Encomics),
University of Leeds, UK 1999
Professional Status National First Grade Registered Structural Engineer, 1998
Specialization civil/structural design and project management in power station, SCR/FGD project
Countries worked in U.S.A, Canada, UK and China
Further Education 1 Ground Treatment on Soft Soil, Beijing University, 1985
2 Uniform Building Code, University of Wuhan, 1995
3 Quality Systems-Model for quality assurance design development
production, installation and servicing. GB/T19001 ISO9001: 1994
Great Wall Quality Assurance Centre. 5/1997
Position Employer, Major Projects & Responsibilities Period
Technical Associate Stone & Webster, Canada 06/01 - Present
SCR Project Unit 4 & 3, Lambton Power Station, Canada
Modification to Existing Boiler structural Steel
Modelling, analysis and design of structural steel for SCR
support steel by using STAAD-Pro.
Lurgi Lentjes Bischoff, Canada 09/00 –05/01
SCR project, Hoosier Energy Power Station, USA.
Reviewed SCR support steel and SCR inlet-hood ductwork design,
Prepared technical specifications - engineering, material supply, fabrication and erection of structural steel for SCR support steel, SCR Reactor and ductwork.
FGD project, Dallman Power Station, USA.
Project co-ordinated with ACRES International, managed engineering interface and reviewed structural design and detail engineering drawings.
Design of spray header support and mist eliminator support steel.
Senior Engineer Allott & Lomax Consulting Engineers, UK 11/99-05/00
Dona Steam Turbine Generation Station, UK
Provided design criteria for concrete works and concrete design for power house and equipment foundations.
Deputy-Chief Central South China Electric Power Design Institute 01/98 - 09/98
Engineer Heze (2x350mw) & Liao Chen (2x600mw) Projects, China
Structural analysis by using STAAD-III, provided general arrangement drawings for boiler structural steel and technical negotiation and co-ordination with Mitsuibabcock Engergy Ltd.
Deputy Chief Department of Civil/structural Engineering of CSEPDI 01/94-12/97
Senior Engineer In charge of Civil/Structural engineering and General layout Design divisions
Responsible for project planing and control by using MS Project and P3 software
Lai Bin B (2x350MW) Power Station, China 10/96-12/97
Provided concept and detail engineering design for coal bunker bay structural steel by using STAAD-III, project co-operated, liaison and co-ordinated with client – GEC ALSTOM.
Ezhou (2x300MW) Power Station 01/94-09/96
Prepared feasible studies for power plant site. Design of heater & coal bunker bay concrete structural frame.
Negotiated and co-ordinated the main building structural design with Foster Wheeler Co., New Jersey, USA.
Reviewed & approved the boiler structural steel design made by Raytheon Engineering & Constructors in New York, USA.
Head of Civil/ Central Southern China Electric Power Design Institute 10/89-12/93
Structural Section In charge of 50 staff design team. Responsible for civil/structural design for power plant, Planned and executed multiple site feasibility studies. Trained and developed staff members
Yang Lou 4x300MW Power Station in Hubei Province, China. 10/93-12/93
Prepared proposals for power plant site selection and civil/structural design
Yang Lou B Power Station (2x600MW) in Hubei Province, China 06/93-09/93
Responsible for the feasibility study of the project.
Yang Lou Power Station stage 1 (2x300MW) 07/91-05/93
Responsible for the design of 210m height of R.C. chimney, R.C. silo with capacity 4000 ton, foundation of main building, heater and coal bunker bay structures.
Qing Shan Power Station (1x300MW) 10/89-06/91
Design of main building structures and foundations, pipeline and duct supports, coal & ash handing structures, and underground facilities, roads/pavement and grade drainage.
Civil Engineer LG Mouchel & Partners Ltd Consulting Engineers, U.K 09/88-09/89
Yue Yang (2x362MW) Power Station, UK.
Design of transformer compound foundation, skidways and firewalls, super structure and foundation of water-treatment plant house and coal crusher house.
A27 Britain Bypass Project, UK.
Checked footbridge design and designed traffic sign gantry.
Graduate/Lead Central South China Electric Power Design Institute 08/83-08/88
Engineer Han Chuan Power Station (2x300MW), China. 01/85-08/88
Responsible for preliminary and construction design. Design of precast R.C. piles, powerhouse, mill and ID Fan foundations, and 210m height R.C. chimney.
Design representative worked on site for two years.
Sha Shi Thermal Turbine Station (2x200MW) 08/83-01/85 Design of civil/structures for fuel oil system, precast pile and pile foundation for main building and equipment.