Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #12255 next resume »»
CONTACT INFORMATION:
View contact information...

Language known: English / Hindi / Marathi / Kannada & Tulu

Education: Bachelor Degree in Economics
(Bombay University)
Diploma in Business Administration
(Specialized in Marketing)

Computer Skill: MS Word, Excell and Internet Operations

On Job Training: Successfully completed a training course on
General Safety Training Course & Communicating the Safety Message organized by British Safety Council

EMPLOYMENT HISTORY

April 2003 to Feb. 2004: G+H Gulf
Country: Doha - Qatar
Contract: Ras Laffan LNG Project, Train-3
Clients: CCIC (CMS&A) / Ras Gas
Staus: Sr.Insulation Supervisor

________________________________________________________

Feb 2002 to March 2003: G+H Gulf
Country: Doha - Qatar
Contract: Dukhan Gas Lift Project
Client: CCC/Snamprogetti for QGPC
Status: Site Manager

__________________________________________________________________

March 2000 to Dec. 2001: LG Engineering & Const.Coorporation
Country: Doha - Qatar
Contract: QGPC Refinery Expansion Project
Client: QGPC
Staus: Insulation Inspector

_________________________________________________________________

Feb.1998 to Jan.2000: Masco.W.L.L. (under Meseie Industrial Co.Ltd)
Country: Doha - Qatar
Contract: Ras Gas LNG Project (Train 1 & 2)
Client: Japan Gas Co. (JGC) – Ras Gas
Status: Insulation & Fire Proofing Supervisor

________________________________________________________________

Oct.1995 to Dec.1997: Cape East Ltd.
Country: Doha - Qatar
Contract: Qatar Gas LNG Project (Train-1,2 & 3)
Client: Chiyoda – Qatar Gas
Status: Insulation & Fire Proofing Supervisor

JOB RESPONSIBILITIES

April 2003 to Feb.2004: To oversee the execution of Hot and Cold Insulation:
Cold Insulation, Cryogenic Insulation especially Cryogenic Vassal, LNG loading line which operates at Cryogenic temperature and Cold Acoustic Insulation including MR and PR Compressor Lines..
Foam Injection for cold piping and equipment valves and flanges and manways.
Foam Glass Insulation for fire proof equipment.
Hot Insulation, Hot Acoustic Insulation using lead and Vinyl Rubber Sheet especially MR and PR Compressor Lines
Day to day planning of work schedule
Allocation of works to charge hands
Arranging work permits
Performing Quality and Safety checks on site
Reporting status of work to Site Manager
Total Manpower under my task 80 nos.

Feb.2002 to March 2003: Involved in the running of Fire Proofing and InsulationWorks:
Fire Proofing: involved in cementetious fireproofing for vessel skirts internal and external by guinniting process using reed machines with 150 psi pressure
Cementitious fireproofing for structurals including colums, beam,by gunnite process using Putzmeister machine with 4 bar pressure
Day to day activity liasing with clients
Making sure all work carried out to contract specification and construction time schedule
Involved in controlling the whole workforce
Preparation and submission of daily, weekly and monthly
Reports
Progress monitoring and updating, subsequent necessary rescheduling of job and manpower
Total workforce approx.250 Nos

March 2000 to Dec. 2001: Responsible for ensuring QA/QC System in accordance with Project Specification and ISO Requirement
Coordinating with client for site inspection
Attending inspection with company inspectors
Inspection of all ongoing insulation activities of contractors
Attending QC meeting with client and subcontractors
Instructing quality requirement for all subcontractor supervisor
Preparing reports and ITPs
Conducting QC Audits with subcontractor

Feb.1998 to Jan 2000: To oversee the execution of Hot and Cold Insulation
Cold Insulation, Cryogenic Insulation especially Cryogenic
Vassal, LNG loading line which operates at Cryogenic temperature and Cold Acoustic Insulation including MR and PR Compressor Lines..
Foam Injection for cold piping and equipment valves and flanges and manways.
Foam Glass Insulation for fire proof equipment.
Hot Insulation, Hot Acoustic Insulation using lead and Vinyl Rubber Sheet especially MR and PR Compressor Lines
Fire Proofing: involved in cementetious fireproofing for vessel skirts internal and external by guinniting process using reed machines with 150 psi pressure
Cementitious fireproofing for structurals including colums, beam,by gunnite process using Putzmeister machine with 4 bar pressure
Day to day planning of work schedule
Allocation of works to charge hands
Arranging work permits
Performing Quality and Safety checks on site
Reporting status of work to Site Manager
To oversee the execution of Fire Proofing works
Day to day planning of material requirements of the following working day
Total Manpower under my task 65 nos.

Oct.1995 to Dec.1997: To oversee the execution of Hot and Cold Insulation
Cold Insulation, Cryogenic Insulation especially Cryogenic Vassal, LNG loading line which operates at Cryogenic temperature and Cold Acoustic Insulation including MR and PR Compressor Lines..
Foam Injection for cold piping and equipment valves and flanges and manways.
Foam Glass Insulation for fire proof equipment.
Hot Insulation, Hot Acoustic Insulation using lead and Vinyl Rubber Sheet especially MR and PR Compressor Lines
Fire Proofing: involved in cementetious fireproofing for vessel skirts internal and external by guinniting process using reed machines with 150 psi pressure
Cementitious fireproofing for structurals including colums, beam,by gunnite process using Putzmeister machine with 4 bar pressure
Completion of daily task tothe satisfaction of the management as well as to the client by using workforce on
Suitable areas
Day to day planning of work schedule

Allocation of works to charge hands
Arranging work permits
Performing Quality and Safety checks on site
Reporting status of work to Site Manager
To oversee the execution of Fire Proofing works
Day to day planning of material requirements of the following working day
Total workforce under my task 50 nos.

Please also note that I have considered experience working with multi national and multi cultural environment.

I here by declare that all statement made in this application are complete to the best of my knowledge.

Place:Doha
Date: 24/11/2004

View contact information...
«« previous resume next resume »»
Search Results (Resumes 4651 to 4700 of 9785)Go to Search Parameters...
Brief Description
Electrical and instrument project manager construction, design and inspection
Open Hole LWD Logging and log analysis, M.Tech (Applied Geology)
Overhauling of Rotating equipments e.g pumps, compressors, gas turbines etc. in an oilfield
Presently working with ConocoPhillips Syria Dez.Gas Ltd. since April 2002 as a Senior Warehouse & Procurement Supervisor in Syria (Middle East) on 28 Days ON/OFF schedules through GMOS (MSI). Job Profile: Responsible overall for all aspects of materials including warehousing, procurement operations
Working In the Oil and Gas Drilling Industry Since 1986 Looking for a company that wants its employers to look after it !!
Rotating Equipment Mechanical Engineer
Senior Geologist (16+ years oil and gas experience), graduated in geology from University of Kansas in 1987.
Having 15 years of experience in oil and gas construction and maintenance feild, with Diploma in Industrial safety, Environmental management
Power Plant Operator Gas Turbine Steam Turbine Supervior Operations GE HRSG
Education: Bachelor Degree in Economics
Piping stress analysis usisng CAESAR-II, support engineering, pipe thickness calculation, pressure balance in PIPENET software, etc
Analytical Thinking , Technically Sound, Good Negotiator, Innovative
10 years of experience as chemist with exposure to most modern methods of analysis
chemist, corrosion eng, oil and gas fields
To obtain a Technician, Operator, or Specialist Position.
8 years experience in reviewing Isometric drawings, P&ID, Process Flow Diagram, General Arrangement Drawing, As-Built Drawing etc. and Joint walk with client for X-RAY / NDT, Hydro testing, Flushing, Re-instatement, Painting, Test packs to be cleared after Erection
Electrical engineer with 2 year experience
Piping desiner and profissional in PDS software.i have 8 years experiences in oil and gas projects.
2.2 Years of EXP on Primavera, MS-Project, Pro/E wildfire 2.0 and AutoCAD
Over 28 years in the oil and gas industry.
Considerable experience in Maintenance Engineering Division for Oil and Gas industry with major Production Petroleum Company in Egypt as a Maintenance Planning and scheduling Engineer as a Maximo Data Gathering and Analysis Consultant with B.P (British P
Over 16 years of total experience in the industry of which 8 year’s industrial experience as Chemical Engineer. This is backed by 8 years of experience of implementation of Intergraph’s Plant Design System (PDS) software. The domain of PDS expertise comprises of piping and structural modeling, extra
Mastering on ANSYS , MECHANICHAL DESKTOP,TEKLA,PDMS
Design/Detail engineering, inspection , erection & commissioning of Oil & Gas Plant,Agro-Chemical industry, Refinery, Pharmaceutical industry involving PLC & DCS system, fire alarm system, access control system, CCTV system ,Public address system, local control panel & field instruments like pH met
6+ years of experience in Reservoir Engineering and Oil Industry.
A state Engineer in refining
I have 7 years of design and construction experience in power, petrochemical and oil & gas industry.
30 years experience in the pipeline field, which includes- bidding jobs, safety procedures, quality control, facility installation, environmental knowledge, welding procedures, know procedures for filling out ground disturbance, hot and cold safe work agreements and confined space entries
I have good Communication skills, good software ability and talent to Drilling , Completion and production jobs.
Design Engineer with 2 1/2 Yr exp in control valve and flow element manufacturing industry.
Engineer with 3 years of experience in instrumentation
Working as engineer in field of chemical. i had started my carear as tranee recently a am working as asst. engineer in field of process ,design & erection.
M.E Instrumentation Engineering, PLC, DCS, Labview, Matlab
I have been in the drilling industry for about 12 years. For the last 4 years I have been working offshore in Doha, Qatar. For more than 2 years I have been a toolpush on a Friede & Goldman jackup here in the gulf. I am seeking a position as a wellsite supervisor.
Shutdown Planning, sheduling
I am a 3rd Class Power Engineer with an Operator 1 ceritficate. I have worked in the Oil and Gas sector for 6 years, from well servicing to field operating and onto midstream operator, where I have been a plant operator, trainer and on the panel. I also have 20 years experience as a manager.
Awareness of technical/ QC requirements, Work as a site based QC inspection coordinator, Interpret standards, codes & regulations, comment on supplier documentation such as inspection & test plans (ITP’S) , NDE and testing procedure, site surveillance report(SSR) and non conformance reports(NCR),
Has more than 3 years work experience in the field of Instrumentation and Control performing Detailed Design with application software such as Plant Design System for Offline Modeling, Stat-Soft and Drawing Manager, Autocad, Microstation for Instrument Location Plan, Junction Box Loading, INtools f
B.E in EEE with 2+ Years of experience in High voltage substation design
I am a Postgraduatre in Petroleum Geochemistry which I have completed from Newcastle University,England,United Kiongdom.I have finuished my Bachelors in Petrochemicakls and acquired a very good score as well.I have included all my skills and qualification below
B. Tech, Installation & Commissioning and maintenance of hydrographic survey equipment including DGPS with 3 yrs experience
Gas Plant Operations Specialist
Petroleum Engineer with 3 yr of Exp : Exp in Production Optimization, Gas Lift Optimization, Workover, Material Balance, Decline Curve Analysis, Stimulation and Reservoir Studies, Reservoir Simulation
Having exp. in plant operations of petroleum refinery & petro chemicals.Having commissioning exp. in refinery sulphur recovery unit
Construction Manager with 22-years experience in Mechanical Construction discipline for Industrial Projects (Oil & Gas, Refineries, Petrochemical Project and Power Plant Projects).
I hold a BSc in Engineering and have extensive experience in procurement and contracts activities in the upstream oil and gas projects. I seek an employment in the Middle East region as Senior Procurement /Contracts Engineer.
Engineering manager, Planning, Contracts and administration. Production engineering a specialty.
Experiance in Detailed engineering, System Engineeering (PLC ,SCADA,DCS) FEED study, instrument selection, BOM preperation, Hotcutover, start up and commissioning, engineering and feild engineering
PDS Modelling, Microstation & ACAD 3d Modelling
Bachelor’s degree in Mechanical Engineering passed from N.E.D. University of Engineering and Technology Karachi in the year 1998
First   Prev   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   [ 94 ]   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com