CONTACT INFORMATION:
View contact information...
Mining-Civil Engineer, M. Eng. (geotechnical engineering)
OBJECTIVE: To fulfil company prerequisite for Mine/Geotechnical Engineer Position as for inculcating of different undertakings and projects for a mining operation or a construction.
EXECUTIVE: over 15 years mining experience.
PROFILE: skilful in mine planning, scheduling, budgeting and design of safety procedures & standards, ground control, geomechanics simulations, mine backfill, mine ventilation, destress & stress governing blasting, precautionary blasting within dangerous conditions of exploding gas, coal dust, vapour, etc.;
contemporary education in mining engineering and rock engineering with a key-opener knowledge of mechanics, mathematics, and geomechanics numerical modelling methods; proficient communication, presentation and project management skills; enthusiastic, responsible, self-motivated, problem-solver, and profit oriented; equally effective working collaboratively in a team effort or independently; fluent in English, Russian, and Ukrainian.
EXPERIENCE: MINE ENGINEER, Ruttan Mine, Hudson Bay Mining & Smelting Co., in Canada: Anglo-American plc., Leaf Rapids, MB,...Fall 2000-May 2002
- carried out long/short range mine planning (drilling and development layouts, production blasting, ground control, process scheduling and work flow, budgeting, and stopes reconciliation)
- made geotechnical modelling for stope sequencing forecast & ground stability optimization;
- developed safety procedures and standards for labor and equipment utilization;
- worked with front-line supervisors, management and engineering staff, inspected and monitored implementation of plans and recommendations on sites;
- performed cavity monitoring (CMS) and GYRO surveying, data interpretation;
- carried out geotechnical mapping and ground control assessments;
- experienced in long/short term backfill scheduling, design of fill fences & delivery system, water balance/content calculation, stope saturation and stope backfill completion for adjacent production;
- experienced in mine ventilation.
M. ENG. CONTESTANT, Laurentian University, Sudbury, ON...1998-2000
- conducted with INCO Ltd. M. Eng. applied research project "Blasthole Instability within Mining of 1290 Orebody Panels, Creighton Mine"
- performed geotechnical studies and inspections of planning, drilling and blasting;
- defended obtained geotechnical results of research.
RESEARCH ASSISTANT, Geomechanics Research Centre, Sudbury,. ...fall 1997
- performed tests, modelling, AutoCAD drawings;
- developed a mathematical solution for the area computation of any uneven surface.
CO-OP STUDENT, SHAFT SERVICES, Placer Dome Canada Ltd.,
Detour Lake Mine, Timmins, Ontario, Summer 1996, Winter 1997
- worked in core shack, on surface, and underground with geologists and surveyors;
- operated rock breaker and loading pocket equipment.
(experience) HEAD ENGINEER, Enterprise of Boring and Blasting Consulting, in Ukraine: Lugansk Coal Company, Lugansk, Ukraine. .Sept. 1986 – May 1994
- enterprise is instituted to implement different blasting projects and effective measures in coal mines of Ukraine and to improve the efficiency and safety of boring-blasting operations in the coal mines.
HEAD OF PRODUCTION TECHNICAL DEP-T, Mine-Construction Undertaking,
Lugansk Coal Company, Lugansk, Ukraine. Dec.1982 - Sep.1986
- undertaking is established to construct underground structures, and mines to sink shafts, to develop underground levels and other facets of coal mines.
SENIOR ENGINEER, SHIFTER, DRIFTER V, Site Development Division,
Lugansk Coal Company, Ukraine,. June 1975 - Dec. 1982
- performed projects, analysis and studies for the Head of Department;
- supervised the crews; worked with loading and boring equipment.
EDUCATION: MASTER OF ENGINEERING (concentration in geotechnical and mining engineering),
Laurentian University, Sudbury, Ontario, Canada, Jan.1998 - May 2000
MINING ENGINEERING TECHNICIAN, Northern College (Haileybury School of Mines), Haileybury, Ontario, Canada Sept.1995 - Aug.1997
UNDERGRADUATE STUDY IN MINING-CIVIL ENGINEERING at Kommunarsk Mining
Metallurgical Institute, Kommunarsk, Ukraine Sept.1973 - June 1979
Programming: knowledge of Auto Lisp, Visual Basic 6 and JAVA computer language.
COMPUTER - AutoCAD, MEDSystem, Datamine, CMS & GYRO Survey, MS Office 2000 Pro, MS Project,
SKILLS: PrimaVera3, Dips, Unwedge, Phases2, Eximine3D, Map3D, FLAC3.4, WinNT, DOS, Mac
- able to learn and adopt new software packages.
INVENTIONS SU 1700350 1989 Ampoule-Sealer for Blasthole Stemming.
SU 1728202 1990 Automatic Machine for Production of Elastic Packages.
SU 1813674 1990 Apparatus for Filling of Elastic Back-Valve Ampoule with Viscous Material.
PUBLICATION New materials for blast-hole stemming. Scientific Info Centre Circular, Lugansk, Ukraine, 1989
A modelling technique for better prediction of tunnel stability in deep mining. Ground Stresses &
Ground Control in Mining, Proceedings of Donetsk Engineering University, Ukraine, 2000
Affiliation: - Professional Engineer certified by Lugansk region executive committee, Ukraine, 1992-1994
- associate of Inventors and Developers Association of Ukraine, 1987-1994
- member of Mining Research and Development Society of Ukraine, 1982-1994
Awards - awarded the Graduate Study Scholarship, 1998, 1999;
Achievements - awarded the J.P. Bickell Foundation Mining Scholarship, 1996, 1997; recipient of the D.G.
Treilhard Memorial Bursary, 1996 and Bursary from the Board of Governors, 1997.
Interests - a qualified tennis player, skating, cross-country skiing, fishing and swimming.
References -list of references will be furnished upon request
View contact information... |