Experienced on the construction, management, supervision and design of Industrial Complex and Oil and Gas Facilities such as Oil Refineries, Power Plants, LPG Recovery & Treating Plants, LNG Process / Product Loading & Storage Facilities / Storage Bulk Plants; Manufacturing Facilities and Factories; Steel Fabrication (Pre-engineering) ; Commercial and Condo Buildings (Reinforced Concrete / Structural Steel Buildings), Building Facilities Services and Public Market Complex; Land Development, Roads & Drainage; Piers and Harbors, Dams & Spillways; Bridges and Piles Driving Works, Structural Steelworks and Survey Works.
Experienced also in the Contract Review and Evaluation, Planning and Scheduling using Primavera Project Planner-Version 3 (P3), Cost Estimates, and Quantity Surveying, Bid Evaluations, Structural Engineering using STAAD3/PRO, SAP 2000, & ETABS, Detailed Engineering Design and Front End Engineering Design, Geo-technical Engineering, etc.
E-MAIL ADDRESS anastaciohular@hotmail.com
EDUCATION Bachelor of Science in Civil Engineering
Bicol University College of Engineering - 1982
Civil Engineering Technology
ILO-Association of Japan 1991-1992
COMPUTER LITERACY STAAD 3, STAAD/PRO, SAP 2000, ETABS Ver. 8
Primavera Project Planner Ver. 3.1
Microsoft Project Professional 2002
Microsoft Excels / Word
AutoCad 2000
WORK EXPERIENCE
COMPANY: RANHILL PETRONEEDS JOINT VENTURE
RANHILL ENGINEERS & CONSTRUCTORS SDN BHD
Kuala Lumpur, Malaysia
Position: Project Control Engineer
Dates: August 1, 2004 to Present
Project Assignment: Melut Basin Oil Development Project (Upstream)
(Palogue FPF / Al Jabalyn CPF/ Operation Base Camp /Produced Water Pipelines -250 Kms & Raw Water Pipeline Project -12 Kms)
Khartoum, Republic of Sudan
Job Responsibilities:
* Work as Lead Project Control Engineer in Four Project Package Area, supervising a group of planning engineers involve in the project control engineering, cost control, planning and scheduling, monitoring, etc.
* Project control engineering which includes planning and scheduling,cost control & estimates, quantity take-off and quantity tracking, coordination, monitoring, setting up controls for the engineering, procurement, construction and commissioning of upstream crude oil desalting and pre-heating plants namely Al Jabalyn Central Processing Facility(CPF) and Palogue Field Production Facility(FPF), and other utilities such as the Water Treatment Facility, Raw Water Pipelines & Produced Water Pipelines, and Operation Base Camp.
COMPANY: YANBU STEELCOMPANY (Formerly PDM –KSA)
Madinat Yanbu Al Sinaiyah
Kingdom of Saudi Arabia
Position: Scheduler / Estimator
Dates: May 14, 2003 to May 14, 2004
Projects Involved: Different Saudi Aramco Projects such as Medina Bulk Plant Project,
And many Other Tanks Constructions for Bulk Plants & Tank Farm
Projects; Jubail United Petrochemical Plant Projects; Saudi Arabian
Fertilizer Company (SAFCO) Projects, Arabtank Terminal Ltd, Saudi
Arabia Mobile Refinery (SAMREF), Saudi Yanbu Petrochemical
Plant (YANPET), Gulf Farabi Petrochemical Company,etc
Job Responsibilities:
* Planning, scheduling and setting up cost control on the fabrication (pre-engineered) and construction of different storage tanks and its appurtenances, pressurize vessels, drums & internals, piping lines and structural works for petrochemical plants, oil refinery, desalination plants, etc.
* Estimates, quantity take-off and cost estimates, cash flows schedule, manhour cost estimates, equipments utilizations, etc. of different storage tanks (plate / structural materials & other tank appurtenances) such as Naptha Storage tanks, Kero Tanks, Diesel Storage Tanks, Hexene and Octene Tanks, Caustic Soda Tanks, Cryogenic Storage Tanks, etc. with or without floating roofs, and External and Internal Floating Roofs.
* Planning and scheduling of different proposed storage tank projects for oil refinery, petrochemical plants, desalination plants, etc. as requirement for bid proposal.
COMPANY: ICC-IMPSA CONSTRUCTION CO./ CBK POWER LTD.
Caliraya-Botocan-Kalayaan Hyrdroelectric Power Plants Project, NPC Compound, Kalayaan, Laguna, Philippines
Position: Sr. Civil / Structural Engineer
Dates: April 3, 1999 to July 31, 2002
Project Assignment: The Build, Rehabilitate, Operate, Transfer (BROT) Project
Caliraya-Botocan-Kalayaan Power Plants Complex
National Power Corporation
Job Responsibilities:
* In-Charge of all the detailed engineering design for the rehabilitation of different facilities of the Caliraya-Botocan-Kalayaan Hydroelectric Power Plants(HEPP), which includes the rehabilitation of Steel Penstocks and accessories from intake to surge tank, then to bifurcator, then to power house; additional steel structures, equipments and transformer foundations, dams and spillways, roads and drainages, bridges, etc.
* Coordinate to the client, to contractors and subcontractors regarding to design requirements.
* Structural design of different concrete and steel structures such as new power house buildings, steel roof deck frames, transformer houses, and multi-purpose building, bridge designs, road and drainage design; by using the computer softwares such as STAAD 3, STAAD/PRO, SAP 2000, & ETABS.
* Quality inspection and monitoring of steel structures based on the codes and specifications, i.e. as per Uniform Building Code, American Welding Society (AWS), AISC Code, DIN Steel Structures –Outdoor and ASEP Code. Review of x-rays film results for welding joints, and inspect other welding joints tested thoroughly by non- destructive method.
COMPANY: TECHNOSERVE INT'L CO./JGC PHILIPPINES
TIC Bldg, 1606 Trade St. cor. Investment Drive, Madrigal Park, Ayala-Alabang, Muntinlupa City, Philippines
Position: Project Control Manager
Dates: February 2, 1997 to March 15, 1999
Project Assignment:
Caltex-Owned: LPG Treating Facilities Upgrade Project,
Caltex Oil Wharf & Pipelines Project,
White Oil Pipelines Project
Shell-Owned - TCCU Fuel Efficiency & Mixed Xylene Project,
HCS Rundown Manifold Project
KERO Hydro Sweetener Modification Project,
NAIA JOCASP Aviation Fuel Storage Project
British Petroleum-Owned - Bataan Polyethylene Project
Job Responsibilities:
* In-Charge of the project control engineering on the front end engineering design and detailed engineering design, procurement of the lead equipments & instruments, and management for the above-mentioned projects
* In-charge for the preparation of the engineering and construction proposals which includes planning and organizing the proposal team, review of the bid documents, contracts and other bid conditions; cost estimates and preparation of all items included in the Technical Proposal and Commercial Proposal for the proposed EPC Projects
* Review and technical auditing of different civil, mechanical, process, instrumentation, electrical plans and design output based on the internationally accepted standard codes and specifications such as ASME, API STD 650/12F, ACI, AWS, AISC, ASCE, JIS, British Standard (BS) Code / BS 5500, etc.
* Planning and scheduling using Primavera Project Planner Version-3 (P3), cost and budgetary estimates, bid package preparation, and other requirements for the construction management of the above-mentioned projects.
COMPANY: JGC CORPORATION - SONATRACH
Position: Planning Engineer
Dates: July 11, 1995 to November 28, 1996
Project Assignment: LPG Recovery Project
Hassi Messauod, Algeria
Job Responsibilities:
* Planning and scheduling on the construction of Administration building, control house, and switch gear building, equipment foundations/pump foundation, gas turbine foundation, tanks & vessels foundations, cable trenches, slab works, and other accessory offsite works
* Planning and scheduling for the construction and erection of equipments such as cryogenics storage tanks, drums, vessels, heat exchangers, coolers, and its stairs and platforms, booster pumps and surge pumps, etc.
* Inspection and monitoring the progress accomplishment and percentage computation; its progress of every activity, manhour monitoring for equipments and manpower (Histogram Analysis); cost report and monthly accomplishment reports.
* Planning and scheduling for installation works for electrical and instrumentation, i.e. cabling and pulling, tray installation, instrument calibration and installation, etc.
COMPANY: CONSOLIDATED CONTRACTORS INT'L CO. (S.A.L.)
Position: Project Engineer/ Planning Engineer
Dates: February 21, 1994 to January 19, 1995
Project Assignment: Adgas Third LNG Train Project
Das Island, Abu Dhabi, U.A.E.
Job Responsibilities:
* Supervision, planning and scheduling on the construction of civil structures and mechanical equipments erection and installations included in the LNG Process Facilities-Train 3, i.e. structural foundations for cryogenics storage tanks, vessels and drums, pumps, heat exchanges, air coolers, air compressors, boilers, gas turbine generators, etc.
* Supervision, planning and scheduling on the construction of Offsite Facilities such as Tank Farm (foundation, slabworks, firewall protections, trenches), Pumps, Waste Water Treatment Facilities, and Product Loading Facilities.
COMPANY: OVERSEAS OHSAKI CONSTRUCTION CORP.
No. 6762 National Life Insurance Bldg, Ayala Avenue
Makati City, Philippines
Position: Project Manager
Dates: September 28, 1992 to October 31, 1993
Project Assignment:
Ohtsuka Manufacturing and Polytechnic of the Philippines Project
LISP, Cabuyao, Laguna
Ciudad Del Sol Townhomes Project
Taytay, Rizal
Job Responsibilities:
* Management, supervision, design and construction of the manufacturing facilities such as the production bldg, administration bldg, canteen bldg, generator house, and warehouse bldg for the Ohtsuka Manufacturing & Polytechnic of the Philippines
* Management, supervision, design and construction of the subdivision, i.e. land development and earthworks, housing units, roads and drainage, bridges and river rip rapping, elevated water tank, deep well drilling, water distribution system, and electrical distribution system for the Ciudad Del Sol Townhomes
COMPANY: OHSAKI CONSTRUCTION CO. LTD / TAIYO CONST.
Fourteen (14) Storey Lions Mansion Condominium Project
Higashi, Chiba-ku, Japan
Position: Construction Supervisor / International Trainee
Dates: September 6, 1991 to August 27, 1992
Project Assignment: Fourteen (14) Storey Lions Mansion Condominium Project
Higashi, Chiba-ku, Japan
Job Responsibilities:
* Supervise and assist the Japanese Project Manager on the management for the construction of the fourteen (14) storey Lion Mansion Condo-Building.
* Monitor all the work items and accomplishments on the daily, weekly and monthly basis.
* Coordinates, inspection and supervision of construction of bored piles, foundations, erection of structural steel frames, plumbing, electrical, concreting works, architectural works, building facilities services such as electrical works & fire alarm, plumbing and piping works, electrical, HVAC / air conditioning works, land development / road facilities & corridors, drainage works, building automation and logic program system.
COMPANY: TRESTECH DEVELOPMENT CORP.
Makati City, Philippines
Position: Project Engineer / Structural Engineer
Dates: February 7, 1990 to August 30, 1991
Project Assignment:
Nabua Public Market Project, Narvacan Public Market, Narvacan Storm Drainage, Roads & Bridge Construction Project
Job Responsibilities:
* Overall supervision and management, inspection and monitoring on the construction of public markets facilities which includes buildings, bridges and main storm drainage roads and drainage, mechanical and electrical system, water tanks and water distribution system, water treatment, oil & water separator
* Prepare project execution budget, project schedules and reports, in-place quantity measurement and monthly billings to PREMIUMED Office at Manila
* Planning and scheduling for construction of public market facilities, bridges, roads and main storm drainage
COMPANY: PEOPLES RUBBER MFNG & STEELWORKS
Metromanila, Philippines
Position: Civil Engineer / Estimator
Dates: February 2, 1988 to February 5, 1990
Project Assignment:
Paracale Mines Vents Shafts and Winder House Project
ASTRA Pharmaceutical-Steel Building Project
People Rubber Fabrication Shop
Job Responsibilities:
* Supervision on the erection of structural steel members of ventilation shafts and winder house for the gold mine pits, construction of water distribution pipelines, water treatment facilities and its pipelines, pumps and motors.
* Supervision on the construction of the additional third floor steel frames for ASTRA Administration Building and Laboratory Building and includes electrical and air-conditioning works.
* Work as a Production Planning and Control (PPC) Officer at the FABRICATION SHOP, which includes monitoring construction of market complex and facilities and includes monitoring of production of the shop, planning of all works activities, traffic and receiving and delivery of finished and fabricated structures, control of usage of tools and equipments.
* Supervision on the fabrication of pipe spools, different kinds of tanks, structural frames, vessels and reactors, mixing tanks, chlorinator, etc.
COMPANY: EEI - KUWAIT NATIONAL PETROLUEM CO.
KNPC-BTC PROJECT
Position: Field Engineer
Dates: December 8, 1985 to December 15, 1987
Project Assignment: Mina Al-Abdullah Oil Refinery Project
Fahaheel, State of Kuwait
Job Responsibilities:
* Supervision, planning and scheduling on the construction of civil structures and erection of mechanical / process equipments for the oil refinery / crude desalting and crude distillation unit, i.e., pre-heaters, furnace, feed pumps, reactors, pressurized vessels, drums, fractionators, heat and air exchangers, air fan blowers, booster pumps and surge pumps, and other equipments included in the oil refinery.
* Supervision, planning and scheduling on the erection / installation of elevated pipelines, pipe racks, and pipe spools, pipe supports & sleepers, steel platforms and stairs, vessel externals / drums supports, vessel internals, etc.
* Supervision, planning and scheduling for the construction of equipment foundations, pipe rack foundations
COMPANY: AG & P - KUWAIT NATIONAL PETROLUEM CO.
KNPC-JGC PROJECT
Position: Field Engineer / Rigger Chargehand
Dates: November 19, 1983 to August 29, 1984
Project Assignment: Refinery Modernization Project / Further Upgrading Project
Mina Al-Ahmadi, State of Kuwait
Job Responsibilities:
* Assigned in the Erection Section of JGC Corporation- estimates and take-off materials and internal parts for vessel, reactors, heat exchangers, fractionators, drums, tanks, pipe racks, elevated pipelines and pipe spools, etc.
* Prepare materials and accessories needed for the erection of vessels and tanks, reactors and towers, fractionators, air-fan blowers, heat exchangers, condensers, and other equipments included in the oil refinery.
* Inspection, monitor, and supervision on the installation of vessels and drum internal parts, prepare punch list for final inspection and for pre-commissioning.
COMPANY: AG & P – MARINDUQUE MINING & INDUSTRIAL CORP/ NATIONAL POWER CORP.
Position: Field Engineer / Draftsman
Dates: November 9, 1982 to November 11, 1983
Project Assignment:
MMIC Coal Conversion Project, Nonoc Island, Surigao City
Calaca-Batangas Coal – Powered 300MW Thermal Plants Project
Calaca, Batangas
Job Responsibilities:
* Supervision, planning, scheduling, and inspection for the construction of coal unloading piers and harbor, sea wall abutments, sea wharf and jetty, mooring dolphins and conveyor foundations.
* Supervision on the construction of the desalination pond and water separator, chlorinator house, water treatment pond, and reinforced concrete water tanks.
* Supervision on pipe laying works from desalination pond to the powerhouse.
* Assigned in the Operation Center (OPCEN) – estimates and take-off quantities for extra works and cost estimates.
* Supervision, planning, and scheduling for the construction of burner piping, and soot blower piping (boiler parts)
* Supervision on the erection of structural roof frames for the whole boiler house (14 Storey Height), and vertical type Foster wheeler Boiler.
* Draft as built-plans of structural frames and modification works