Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #13880 next resume »»
CONTACT INFORMATION:
View contact information...

Place and Date: Jombang, East Java, November, 28, 1952
of birth
Nationality: Indonesian
Married status: Married with 3 daughters

EDUCATIONAL BACKGROUND:

1973 - 1977: B.Sc. Majorly in geology, The Academy of Geology and Mines, Dept. of Mines and Energy, Bandung, INDONESIA Thesis: "The Geology of Southern Part of Purwakarta Area, West Java, INDONESIA".

1984 - 1987: M.Sc. Majorly in geology, The University of Canterbury, Christchurch, NEW ZEALAND.
Thesis:"The Cretaceous-Tertiary Geology of the Wandle Depression, North Canterbury Area, Waiau District, Northern Canterbury,
NEW ZEALAND.

Laboratorium equipment thesis support: Polysator Microscope; SEM; XRD; XRF; Magneto Separator; Pippette Analysis and rock cutting and polished for thin section procedure to described, point-counting/modal analysis and to analyze the sedimentary and igneous petrographics (provenance and diagenesis studies), petrophysical work, log analysis, clay structural model and seismic stratigraphy for sequence stratigraphic interpretation.

FIELD OF INTEREST IN GEOLOGY:

* Sedimentolgy is to emphasize on the clastic sedimentary petrography applies for provenance and diagenesis studies to end-up with good prediction about reservoir quality of the sedimentary basin especially for hydrocarbon exploration and development geology. Sequence stratigraphy (i.e. study of the measuring sections of the outcrop surface geology, seismic stratigraphy and log characteristic).
Basin analysis leading to petroleum exploration and play.
* Regional tectonic study related to basin configuration within hydrocarbon prospect.
* Economic geology - including gold and other economic minerals explorations.
* Regional tectonic related to the mineralisation; ephitermal and porphyric gold and copper, and also to design basin configuration within which the hydrocarbon trap is the main target for exploration.

EXPERIENCES

1977-1979: Regional geological field mapping in P. Kei, SW Molluca; Jambi-East Sumatra (Jambibasin); Salatiga-Central Java; south-central-southeast arm of Sulawesi and western part of P. Seram quadrangles. Duties involved as party chief field geologist especially for analysing and interpreting data taken from geological traverses to design and to finalyse on geological map, scale 1:250,000.

1980-1983: Regional geological field mapping mainly in Sulawesi includes West-Central- East and Southeast Arms of Sulawesi. The Kendari area and Banggai-Sula islands are still partly of the Sulawesi regional geological mapping project (scale 1:250,000). Duties involved as above. Party Chief.

1988-1989: Geological field mapping on the 'outer arc ridge' west-off Sumatra, Simeulue island. Duties involved; party chief geologist and geological map first author. Sinabang Quadrangle, Scale 1:250,000.

Geological Research and Development Centre (GRDC) representative for the technical assistance (geologist consultant) especially in the petroleum companies, as follows:

1987-1988: Geological field mapping stressed on the stratigraphy measurement and sedimentology aspects of basin study to search hydrocarbon potential, oil and gas sampling in northern Buru basin, northern Molucca. Join research GRDC- PERTAMINA. Consultant Geologist (full time).

1988-1989: 6 month services on basin study special attention study on Ngrayong sand (paleoenvironment, reservoir characteristic, diagenesis and provenance), seismic stratigraphy, oil-play and concept using (i.e.lopatin, static-seismic and well corellations) in NE Java back-arc basin including Madura island. The services performed both in the field and office works. Join study GRDC- TREND TUBAN -PERTAMINA. Consultant Geologist (full time).

3 month services on gold exploration, duties involved volcanic and igneous rock alterations field mapping and stream sediments in east Kalimantan. Join project between GRDC and PT.Tridaya. Consultant Geologist.

1989-1990: 6 month services on structural geological mapping to modelize the balance section related to hydrocarbon traps in Lengguru Fold Belt (thin skin model), Irian Jaya, Indonesia. Join study GRDC-MOBIL OIL INDONESIA- PERTAMINA. Consultant Geologist (full time).

1991-1996: Provenance and diagenesis studies (using modal analysis, petrography) of lower Miocene clastic deltaic sedimentary rocks dealing with reservoir characteristic or quality, Sanga-Sanga PSC, Kutei Basin, East Kalimantan, Indonesia. Join Research GRDC-VICO INDONESIA- PERTAMINA. ConsultanGeologist (full time).

1996: Basin Study on South Sulawesi (West-Arm of Sulawesi) especially Upper Cretaceous-Tertiary sedimentary-volcanogenic rock sequences, and also includes the study of some carbonate platform problems within the basin development of Karama-Lariang basins. Join study between the University of London (UCL) and GRDC on the possibility of hydrocarbon prospects in this basin. As Superviser.

1997: The continuation of basin study as above. This time detail section on the geological field traverses of the Lariang sub basin, western tip of the west arm of Sulawesi. Partly of join research University of London (UCL) and Geological Research and Development Centre (GRDC), Bandung, Indonesia. Superviser.

1998: 2.5 month field works on coal exploration and basin study of Jambi subbasin partly of South Sumatra basin. A month writing report on that part. Mineral Resources Dept. Dept. of Mines and Energy Project. Party Chief.

40 days geological field mapping in Pangandaran and Padaherang quadrangles (West Java) to accomplish the systematic geological map in scale 1:50.000. GRDC Project. Party Chief.

40 days structural geological mapping and research work on Latimojong Mtn central South Sulawesi. To see how relate to regional tectonic development in Western Arm of Sulawesi. GRDC Project. Party Chief.

15 days (during month of October) geological field observation on the spot of detail study on Ngrayong Sand to see sedimentological aspects (e.g. paleo- environment, geometry, stratigraphic position, and lateral distribution) in Madura Island. Joint Project GRDC-SANTOS SAMPANG Pty Ltd - PERTAMINA. Party Chief

60 days (November-December) writing report on the Ngrayong Sandstone outcrop distributions in Madura Island. Joint Project GRDC-SANTOS SAMPANG Pty Ltd (Sponsor) - PERTAMINA.
Consultant Geologist (full time).

1999 May-40 day research work + 90 day writing report on the Pegunungan Tigapuluh Sept. subbasin, South Sumatra basin, Jambi Province. To analyze the Tersier subbasin around the Peg. Tigapuluh. Geological Research and Development
Centre internal research. Party Chief.

2000 June-40 day geological field work of Pare Pare Quadrangle, scale 1:100,000 Augt. South Sulawesi. Party Chief.
2001 - Augt- Petrography analysis on provenance studies of West Sumatera Basin Oct. (Sawahlunto basin). To determine the tectonic setting of the area.
2001 - 2002 Rehabilitation worked on post mining area (e.g. coal mining – KPC East Kalimantan and nikel mining – in INCO consession, Sorowako South Sulawesi)
2002 – 2003 Coal exploration and distribution in the Barito Basin, Sedimentologist.
2003 – 2004 Pulau Balang – coal bearing formation, exploration, mapping and its distribution in the Kutei Basin, East Kalimantan. Chief Sedimentologist.

PUBLICATIONS

1) Endharto, M., 1979. Applied geomorphology. Journal of Survey and mapping, Bandung. ISBN no: 0125-8466, p.81-88.
2) Endharto, M., 1987. Cretaceous-Tertiary geology of the Wandle depression, Waiau District, North Canterbury, New Zealand. M.Sc. thesis (unpublished) lodge in the University of Canterbury, Christchurch New Zealand. 270 pages.
3) Endharto, M., 1987. Allochtonous and suspect terranes of the Gondwanaland and Pacific margins. Presented on GRDC seminar (extended abstract). Bandung,
Indonesia.
4) Endharto, M., 1988. Turbidite problem. Presented on GRDC seminar (extended abstract). Bandung, Indonesia.
5) Endharto, M., 1989. Structural elements and tectonic settings of Irian Jaya Data Package-BMR Australia and GRDC Indonesia. Proceeding, 15 pages, p. 15-20.
6) Endharto, M., 1990. Structural geology and tectonic setting of Irian Jaya related to hydrocarbon prospect. The 19th Annual Convention of Indonesian Association of Geologists, Bandung, Indonesia. Proceeding, p.
7) Endharto, M and Surono, 1991. Prelimenary study of Meluhu Complex associated with terrane formation in Sulawesi. The 20th Annual Convention of Indonesian Association of Geologists, Jakarta. Proceeding, p.340-353.
8) Surono, M. Endharto, Judah dan Ali, 1992. Sedimentology of Meluhu Formation, Southeast arm of Sulawesi. The 21st Annual Convention of Indonesia Association of Geologists, Yogyakarta. Proceeding, p. 833-851. ISBN 979-8126-04-1.
9) Endharto, M., 1993. The Provenanance type and diagenesis process of the Lower Miocene sandstone within the Kutei Basin, East Kalimantan, Indonesia. The 22nd Annual Convention of Indonesia Association of Geologists, Bandung. Proceeding, p. 1044 - 1060. ISBN 979-8126-04-1.
10) Endharto, M and Sukido, H., 1994. Geological Map of Sinabang Quadrangle, west off Sumatra, scale 1:250.000. Geological Research and Development Centre, Bandung, Indonesia, Published.
11) Tanean, H., Patterson, D. and Endharto, M., 1996. Source provenance interpretation of Kutei Basin sandstones and the implications for the tectono-stratigraphic evolution of Kalimantan. Proceeding, Indonesian Petroleum Association, Twenty-Fifth Silver Anniversary Convention, p.333-345.
12) Endharto, M., 1996. Neogene geology of the outer-arc ridge:with a special reference of Simeulue Island, west off Sumatra, Indonesia. The 25th Annual Convention of Indonesia Association of Geologists, Proceeding, vol. III, p.470-487.
13) Endharto, M., 1997. Reservoir characteristic os sandstones in Kutai Basin and its tectonic setting of East Kalimantan. GRDC Bulletin, p. 127-149.
14) Endharto, M., 2000. Studi stratigrafi kaitannya dengan perkembangan struktur geologi di
Kawasan Latimojong, Lengan Barat Sulawesi. Journal of Geology and Mineral Resources, No. 107, Vol. X, p.14-45.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2151 to 2200 of 9785)Go to Search Parameters...
Brief Description
• Using STAAD and AUTOCAD for Design and Detailing of Buildings and Civil Engineering Structures. Design and construction of pipeline, building and civil engineering structures, Pipeline integrity assessment and asset management , ISO 9001:2000 Qulaity Management System lead Auditor ,
Sr. Drilling & Completion Consultant
Instrument Designer/6 years of experience in Instrumentation Engineering & Construction Design
Installation, Wiring, Loop checking, Calibration commissioning of new electrical instrument and project
+12y of experience in the oil industry, especially onshore& offshore oil drilling service which has worked in the Senior Electrical engineer in more than two company to the position of Assistant Director of maintenance
Petrophysicist (Senior Geoscientist) with almost 7 years experience, Skills: Log Analysis and interpretation (Cased Hole/Open Hole) Integrated core and log data analysis, petrophysical moddeling, reserves evaluation, base knowledge of seismic interpretaion
marine, Industrial Journeyman Electrician
I have over 10 years experience out of which has solid 7 years of experience both as a Project Leader and a Team Leader and is has excellent understanding of project life cycle, quality systems, data migration, risk management, software testing, data modeling and developing specification
I M WORKING AS OPERATOR SINCE IN PETROCHEMICAL FIELD SINCE 15 YRS.
Firoz Khan, A NACE CP Level 2 , have had a great deal of corrosion / Cathodic Protection experience in Pipelines, Above/Under ground storage tanks, Jetty & Offshore Structure. Have done a lot of CP Surveys also.
Production/Development Geology, Exploration geology, Sedimentology, Sequence Stratigraphy, Geomodeling, Seimic interpretation, Reservoir Characterisation, Petrel.
I have M.Sc. in Mechanical Engineering and as a Piping Engineer I have 7 years experience both in design and construction phases of oil, gas and petrochemical projects led by International firms like TECHNIP and LINDE.
My career ambition is to be working for a firm that allows me to work with Electrical Power Generation, High Voltage/Low Voltage Power Supply Systems, Sub-stations, Distribution, Transmission Lines, Protection and Metering Scheme Design, Installation, Testing, Modification and Maintenance. Qualific
I have dedicated 14 years in the corrosion protection, corrosion monitoring, material selection and material upgradation in Oil and gas based industries. For the last two years I have been associated with the Inspection Management System and Risk Based Inspection programme being developed.
Expert in alignment, maintenence, troublrshooting, overhouling with nice computer knowledge
Fourteen years of experience in Estimation & Proposal preparation of Co - Generation Boilers, Refineries & Oil, Gas and Petrochemical Plants. Well versed in all aspects of Estimation and commercial terms & conditions of contract.
Excellent working knowledge in Piping stress analysis using caesar II
Instrument Engineer with MBA having 10 years Expeience in Refinery & Chemical Industries Project & Maintenance.
Stractural/ Mechanical Engineering
I am a Chemical engineering graduate with Diploma In Industrial Safety and having 15 yrs. experience in Refinery, Petrochemicals, Oil and Gas plants with SHELL- PDO OMAN LLC,Reliance Petroleum Ltd , Enron in Off Shore Power division for LNG regassification unit, Cairns Energy India pty ltd for Laxmi
worked in oilfield since 1975 on the rig as Roustabout to Senior Toolpusher and OIM, in the office as Drilling Superintendent and Operations manager
I am a Diploma holder in Electrical Engineering. I worked 8 years in Indian Engineering Companies as Engineer. Later i started my career in Oil and Gas Industry. I am capable of serving the position as Electrical Maintenance Supervisor / Foreman. Now i am working in Sudan.
Purchase and logistic Management with +14 Years Experience
Dy. Manager- Operation, Panel Operation,Pre-commissioning & commissioning Exp.
Self-motivated and experienced Supply Chain professional. Possesses over 28 years of knowledge in materials, logistics and shipping Has well proven team leading and organisational skills which have been proven in a dynamic and challenging supply chain environment
Having Over 10 years of experience in Documentation in Oil & Gas Industry using EDMS
A keen analyst with 11 years of experience in QMS Implementation, Testing & Inspection, Inspection Co-ordination, Welding Operations, Audits etc.
NDE Project Manager, III Ultrasonics ASNT/ACCP/EN473, Phased Array, TOFD, API 510 (lapsed), CWI (lapsed)
Results-oriented Petroleum Engineer with 17 years experience in the International Oil Industry with an in-depth technical appreciation of production practices.
Canadian Citizenship, twenty-year work experience in the oil/gas and mining industry with very strong skills in geology and geophysics, reservoir management, Development and Production and production engineering. Very proficient in computer software applications for resources estimation, project eva
Piping &pressure vessel design
Core business is scaffolding; Consulting, controlling, supports, execution business. in Oil & Gas industry and construction industry
I am M.Tech and got 13 years of experience in the field of process automation & controls
Mechanical Field Service Technician
Graduate with 6 months Fire Fighting Training from Japan, four years experience as Fire Chief of Lahore Metropolitan Fire Brigade, Eight years experience as Fire Prevention Officer [District Civil Defence Officer]
Coil Tubing Supervisor. An extensive Knowledge of onshore, Desert, swamp and offshore Well service techniques have been gained on a variety of completions, including Oil & Gas producers, water & gas injectors and Deep-Sea wells which are outlined as follows.
Extensive experience processing marine and land seismic data. Familiar with data worldwide including Geometry QC, Refraction Statics Solution, Tidal Statics, Velocity Analysis, Multiple Attenuation, DMO, Coherence Filters and Migration.
Master Mariner
Petroleum engineer speciality drilling, 44 years old, 14 years middle east experience at SHELL standards, tollpusher, rig manger, drilling superintendent experience, drilling, completion, workover, fishing experience
I am interested to fulfill one of the geologist position in your company, here in I apply for that slot. I have been working on the several oil companies for more than 15 year experiences to look at some hydrocarbon basin studies throughout Indonesia
I am currently seeking a new assignment as my present project with Shell Houston on the construction /Integration/commissioning of topsides for the FPSO BONGA has recently come to an end in Nigeria. I was the QA Lead supporting and auditing on/offshore construction activities and based in Lagos.
Diverse experience as a petroleum, mechanical and environmental engineer. Areas of specialized knowledge extend from personal management, completion, operations and production engineering to project engineering and project management.
Instrument Electrical. Real polyvalent-Electronics: Fire detection/gas detection/communication system and hydraulic systems(crane, wellhead control)
14 year-experience(6 years in Arabic World) in Oil&Gas and Petrochemical Industries as C&I Engineer(Technician).Involved in design, construction, commissioning, startup, shutdown and maintenance of some plants.I worked with great companies – ANSALDO, BROWN & ROOT, SHELL, LUKOIL.
Leading team of process engineers for oil and gas process engineering work (Conceptual, FEED, Basic and Detail, etc)
5 Years of Digital DCS Control systems erection ,testing and commissioning experience.
NACE certified corrosion technologist with over 25 years experience in all aspects of the Corrosion Protection field. Extensive field experience. Willing to travel. Interested in contract work.
M.Sc Petroleum Engineering, 28 years experience as Drilling Fluids/Mud Engineer and Reservoir Engineer
Bachlor degree(b-tech) in chemical technology, having the experience of oil refinery,oil movenent(tank farm),multi product pipe line operation and fertilizer urea plant.
Presently I am working Bunduq oil company at offshore Abudhabi as a techanicianmechaical
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   [ 44 ]   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com