Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #16715 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE Senior Mechanical / Piping Engineering Level

EDUCATION & TECHNICAL QAULIFICATIONS
1 B.Sc. in Mechanical Power Engineering at June 1991, Alexandria University,
Egypt.Final Graduation Grade: (Very Good) Graduation Project: (Excellent) 95%

2 Member of Egyptian Society of Mechanical Engineers.
3 Member of Egyptian Engineering Syndicate.
4 Saudi ARAMCO Approved Engineer as (Eng. I)

Languages
Arabic Excellent (As a native Language).
English: V. Good (Spooking, Read & Write).

Training Courses
1. Using (CAD-CAM) for design of process piping systems. Implementing packages of (Piping, Steel Structure & Cable Trays) for modeling of Petroleum and Industrial Plants). (3-D & walk through Modeling using Sun-spark Stations).
Computer- Vision Automated Design & Drafting Systems (CADDS Version 5.0.3).
2. Using HAP (Hourly Analysis Program to estimate HVAC load calculation & equipment selection)
3. Using CAESAR Stress analysis program, for modeling pipelines and Critical piping (high pressure / high temperature). For estimation of the maximum permissible stresses in the system.

PC Skills MS DOS MS Windows XP MS Project Planning AutoCAD 2000

PRACTICAL EXPERIENCE
SAUDI CONSOLIDATED ENGINEERING COMPANY (SCEC- K&A)
March 2004 –Present
Mechanical & Petroleum
Piping Division.
AS
Senior mechanical Engineer.
Design & supervision of different mechanical systems for petroleum& industrial plants Saudi Arabia – Al-Khobar branch.
- Designing of Piping systems such as Trunk lines, Flow lines, Tie-in Manifold, Isometric Drawing, P &IDs, Plant Layouts.
- Preparing piping calculation, piping specification and final material take-off.
- Designing of HVAC systems, Plumbing internal piping systems.
- Designing special systems such as (fire fighting system, Compressed air, waste oil Disposal) for industrial /petroleum facilities
- Maintaining the designed systems in compliance with the controlling and governing codes.
Related Professional Skills
Implementing Different Industry Standards such as American Society of Mechanical Engineers (ASME), American National Standards Institute (ANSI), National Association of Corrosion Engineers (NACE), and American Society for Testing and Materials (ASTM), American Petroleum Institute (API), and Saudi Aramco Engineering Standards (SAES) for different piping design phases related to Saudi Oil Company, SABIC, SAMIR (Morocco) & others.

AL-SWAILEM Ltd FOR COMMERCE AND CONTRACTING (MASCO)
Jan., 2003 - March, 2004
Mechanical Division.
AS
Senior electro-mechanical Engineer.
Construction supervision of different mechanical systems for Al-swailem compound (30 Villas) Saudi Arabia –
Al-Khobar branch.
Managing, Directing, Executing Electro-mechanical works for residential compound (30 Villas) including:
1 Preparing the electrical & mechanical workshop drawings.
2 Re-Design Main Project Equipment (Reverse Osmoses Plant)-(Domestic - Irrigation & Fire) pump stations.
3 Planning & Scheduling for different project Electrical & mechanical activities with co-ordination with civil activities.
4 Preparing Detailed Bill Of Quantity (B.O.Q) For Project activities.
5 Studying technical & commercial offers for subcontracting electrical & mechanical systems and selecting the most appropriated subcontractor.
Professional Work activities
Electrical Activities
- Internal Electrical circuits (Power & Lighting).
- External Lighting circuits.
- External Power & Lighting main Cables network.
- Installation of (MDP - DP- PP - MCC).
- Meter Room activities.
- Internal & External Low Current Systems (Fire Alarm - Telephone Sys. - CCTV - Centralize satellite receivers).
Mechanical Activities:
- Installation of different pump stations for different utilities: (Domestic - Fire -Irrigation).
- Installation of pump room piping systems.
- Installation of Reverse Osmoses Plant (R.O.P).
- Installation of external (Domestic - Irrigation - Fire - Drainage) networks.
- Installation of swimming pool system.
- Installation of Sauna and steam rooms systems.
- Installation of HVAC System: (PACU "58 off " – Int. Duct works – Ext. duct works & m/c connection)
- Internal Plumping Works (Water Supply & Drainage).
- Centralize Water Heaters & circulating pumps

Saudi Bin-laden Group – Rush Projects Division (RPD)
Nov., 1997 - June, 2002
Mechanical Department
As
Mechanical project manager Construction of different mechanical systems for royal places & high class residential buildings Saudi Arabia
Riyadh branch
Managing, Directing and Executing Electro-mechanical works for high class residential buildings & palaces:
1 Executing the electrical & mechanical workshop drawings.
2 Installation of main Project Equipment (Reverse Osmoses Plant - Domestic, Irrigation & Fire pump stations).
3 Planning & Scheduling for different project Electrical & mechanical activities with co-ordination with civil activities.
4 Reviewing Detailed Bill Of Quantity (B.O.Q) For Project activities.
5 Supervising related subcontracting activities including monitoring & evaluation of mechanical subcontractors.
Professional Work activities
- Installation of different pump stations (Domestic - Fire -Irrigation).
- Installation of pump room piping systems.
- Installation of Reverse Osmosis Plant (R.O.P).
- Installation of external network for Domestic - Irrigation - Fire - Drainage).
- Installation of swimming pool system.
- Installation of Sauna and steam rooms systems.
- Installation of HVAC System: (Central Package Units - Internal Duct works - External duct works and m/c connection)
- Internal Plumping Works (Water Supply & Drainage).
- Centralize Water Heaters along with circulating pumps.
- Installation of Elevators & dump waiters.
- Diesel generators Fuel Supply & Exhaust Systems.
- Gas Supply piping systems.

ENGINEERING CONSULTANTS GROUP (ECG)
Jan. 1993– Nov., 1997 Mechanical & Petroleum
Piping Division
AS
Senior Piping Engineer Design & supervision of different mechanical systems for petroleum& industrial plants Egypt – Cairo branch.
- Design of process Piping systems including Preparing Process Piping design drawings using (CAD - CAM)
For different piping systems of industrial & petroleum plants.
- Prepare Piping Isometric fabrication Drawings.
- Prepare piping calculation, piping specification and final material take-off.
- Design of piping supports for different piping systems.
- Design special systems such as (fire fighting system, Compressed air, waste oil Disposal) for industrial / petroleum facilities
- Maintain the designed systems in compliance with the controlling and governing codes.
Related Professional Skills
Implementing Different Industry Standards such as American Society of Mechanical Engineers (ASME), American National Standards Institute (ANSI), National Association of Corrosion Engineers (NACE), American Society for Testing and Materials (ASTM) and American Petroleum Institute (API) for different piping design phases related to projects belongs to international & national firms such as:
1. Sugar & Integrated Industries – Egypt
Project: (Extension & Rehabilitation of Qumobo Factory- Upper Egypt).

2. Proctor & Gamble – Egypt
Project: (New boiler house - Steam Piping System).

3. Alexandria National Iron & Steel Factory
Project: (Second Direct Reduction Plant - SDRP)

4. Suez Oil Company (SUCO)
Project: Preparing As-Built Piping Drawings for (G.O.S.P) for (LPG. Plant) & Platforms.
(Sites of "Zeit pay - Ras Budran - Ras Fanar)
5. Sugar & Integrated Industries - Egypt
Project: (New De-aerator Plant of Nageh Hammadi Factory).

6. Asia Brown Bovery (ABB) - Egypt
Project: (Design & Installation supervision for Non - critical small bore piping (1"-3")

7. Caltex -Egypt
Project: (Lub. Oil Blinding &Mixing Plant).
Professional Work activities:

1 Studying & Selecting Suitable equipment As P.F.D. (Process Flow Diagram).
2 Preparing Preliminary Plant layout.
3 Piping System Classification & streams analysis.
4 Preparing an elementary piping Line Designation List.
5 Preparing piping specification for each stream based on the operation conditions & the nature of each working medium.
6 Preparing a Conceptual Design for Piping & equipment.
7 Preparing Final plant Layout wit co-ordination with the following disciplines: (Tanks & Pressure Vessels - Instrumentation - Electrical - Structural & Civil - Environmental).
8 Preparing piping arrangement drawing based on final (P & ID) -Line designation list - piping specs- final equipment & pressure vessels - Instrumentation system design -Electrical cable trays layout - main racks layout - Environmental recommendations.
9 Preparing a CADDS model for the plant.
10 Creating piping isometric drawings using CADDS.
11 Preparing piping support details.
12 Preparing stress analyses Reports for critical pipes (High pressure /High temperature).
13 Preparing final B.O.Q. for the project.

Saudi National Pumps (SNP)
Dec., 1991 – Nov., 1992
Mechanical Department
As
Mechanical Engineer
Selection & installation supervision for deep well vertical turbine pumps. Saudi Arabia
Riyadh branch
Selection & installation Supervision of deep-well vertical turbine pumps
Professional Work activities
- Design & Selection of pumps based on well data analysis.
- Selection of suitable engine drive (Diesel engine).
- Selection for suitable transmission gear.
- Installation supervision for the sold pumps.
- Troubleshooting, Inspection & reporting of installed pumps.

(References are available upon request)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3051 to 3100 of 9785)Go to Search Parameters...
Brief Description
B.E. Mechanical Engineer, Middle Management Maintenance Executive. Demonstrated willingness and ability to quickly acquire new expertise, solving problems related with Rotating Equipment reliability and performance. Looking for challenging opportunity and career advancement.
QA/QC Architectural Supervisor/Inspector
Senior Piping Designer CADD
Mechanical / Piping Engineer
Working in all fields of civil qc civl & qs civil is maincan work as project manager for oil &gas field &bulding construction
Im graduated of bachelor of science in civil engineering, I have 14 years experience in Drafting/Design for structural steel, FPSO pressure vessel and piping layout thru P&ID. I have background in qaulity inspection for dimensional and visual, also Im NDT-LEVEL II Inspector (DPT).
I am Civil/Structure Engineer with almost 10 years experience in oil&gas, petrochemical, cement, powerplant and mining industries.
Instrumentation Engineer With 10 Years Experience In Managing Engineering,Re-vamping,Installation, Commissioning And Maintenance Of HONEYWELL DCS/SCADA Systems
Project Control Manager/ Lead Planning Engineer - Oil & Gas.
I have worked extensively with various simulation packages viz. MoReS, Eclipse, VIP, MORE etc, I have over 8 years experience as a Petroleum Engineer, specializing in reservoir engineering.
QHSE-Advisor on crews worldwide, Extensive knowledge of Uphole Drilling programs
I worked in automation and process consulting companies for six years.
* Chemical Engineer with 14 years experience in Process, Production, Commissioning, Technical Support & Service, Product Development, Quality Control, Project Management, SHE (Safety, Health & Environment), Logistics, Sales & Marketing and Production Planning area.
Industrial Engineer with experience as maintenance instrument technician and plant engineer in process plants. Higher Knowledge in Instrumentation and Control, such as transmitters, field sensors, analyzers, solid handling instrumentation, control valves, special application devices
API-510, API-570, API-653, AWS-CWI 25years international experience QA/QC Supervisor ,Superintendent, Coordinator
Crane operator/ outside machinist
My areas of expertise includes commissioning, start up, shutdown and operation of gas plant, refinery and oil production units.
I am Mechanical Engineer having 14 years of working experience in Maintenance of Petrochemical and Fertilizers Plants. Good knowledge of SAP, MS OFFICE.
I am an Electrical Engineer from Colorado School of Mines. I have worked for two major oil companies. I have worked on several areas of energy industry as an Electrical Engineer.
Free PC user. Competative, acurate, punctual
Material Controller, 2yrs Petrolum/Oil Oman Exp and 6ys India Exp,
I am working as a QA/QC Engineer in Oman.I am expecting a challenging job to prove my potential.
I am working as Directional driller in Mitchell Drilling India Pty Ltd, India. Currently working on Multibranch holes. Till now planned 20 Multibranch holes and hit the target as planned. Have worked in horizontal wells in CBM and got the idea of horizontal well drilling and ER wells.
Bachelors and Master's in Geophysics with almost 3 years in Oil & Gas Industry
Wellsite Geologist – Operation Geologist, geology department representative at rig site for drilling activity of: development, delineation, and exploration wells with over pressure risk. Familiar with deltaic system, mainly in gas field.
I am a petrochemical engineer with over 25 years of operation and technical service experience in ethylene plants.
Six years experience in Project Controls and Project/Programme Management (including three years experience in EPC/PMC projects). Focused mainly on planning & scheduling & project risk management.
IT leader with solid accomplishments working for global industries for the last 20 years. Value delivered in Brazil, Argentina, United States, Canada, Uruguay, Puerto Rico, Colombia and Germany. Focus on IT ROI, management, planning and operational excellence.
MBA Project Manager experienced in managing both infrastructure and application development projects.
Supply Chain Management & Well Optimization Coordinator
Cathodic protection engineer with 7 years exp. with every aspect of C.P,Well versed with NACE and other Interntional and Industry specific stds
Computer knowledge, documentation, teaching, research works and quick learner.
Pipeline engineer and Stress analyst (CAESAR II)
I am a mechanical Engineering graduate having seven years of experience in Petroleum storage terminal.
Worked as Rotating Equipment Engineer for various types of rotating equipments for refineries, petrochemical and nickel-mining plants in compliance with the project specifications, clients’ requirements and international codes and standards. Field engineering works during construction stage related
I am Junior Piping Designer with PDMS skill
Hse speciality
I am 32 years old, male, married, a university graduated on Offshore Engineering Dept. of ITS (Sepuluh Nopember institute of Technology) Surabaya. I have been working at some Batam shipyards since 2001. Presently, I am working as Project/Piping Engineer. Additionally, I’ve some computer skills.
MS Degree drilling engineer with 4 years of experience in oil and gas industry. A motivated person with good team work skills and experience in multi-national projects and environment. Looking for position of Night Drilling Supervisor or Wellsite Drilling Engineer on/off
Certified Drilling Fluids Engineer with extensive knowledge of oil field operations and experience working with oil wells, and well maintenance
Ngondi Bessala is a Senior geologist with more than 20 years experience as Exploration Geologist, Operations geologist and wellsite geologist with major companies Elf then Total, Conoco Phillips as consultant, with independants Perenco, Maurel & Prom, Addax Petroleum and CMS energy
Diploma in Chemical Engineering
BE in Mechanical Engr
Mechanical engineer, autocad, offpipe, microsoft
Specialized in Corrosion & Materials Technology, Failure analysis, Quality control and Project Management
Electronics Engineer with 7.75 years of exp. in installation, testing, commissioning and troubleshooting of Satellite communication equipments and Vessel Traffic Management Systems which includes Radar Systems, AIS, VHF Systems, Hyd/ Met. Stations, etc
As A Production Optr Carried Out: DCS [Yokogawa 1000 & CS300, Emerson] Oil Production & Processing, Gas Processing (De-Hydration, Sweetning etc), H.P & Waste Gas Compressors, Wellhead Operations [Well Testing, HY Panel Operations, SCSSSV Function Test, Well Activation] Completion, Workover, W/L
Civil engineer with 17 years experience
Skilled Production Technician
Technical Sales manager - Electrical Engineering
First   Prev   51   52   53   54   55   56   57   58   59   60   61   [ 62 ]   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com