ENGINEERING EXPERIENCES:
- Familiar with Standard and Code (API, ASME, NACE, and NFPA);
- Process Flow Diagram (PFD) Review and Evaluation;
- Piping and Instrument Diagram (P&ID) Review and Evaluation;
- Process Simulation by using Pipesim, Hysys, Flaresim, Pipephase, Chemcad;
- Process Selection;
- Equipment Sizing and Selection;
- Safety and Fire Protection Design;
- Safe Chart;
- Tie-in scheduling and Line scheduling;
- Tie-in procedure and Commissioning procedure.

Engineering Career:
2005, January - April: PT. ISTECH RESOURCES ASIA
ASSESSMENT OF EXISTING HEX-SYSTEM AT CGS-3, 4, 5
Client: PT. CALTEX Pacific Indonesia
Position: Process Engineer
Responsibilities:
- Review P&IDs and Piping Plan as per existing in the plant,
- Prepare simulation for existing system
Scope of work:
PT.Caltex Pacific Indonesia intends to review the Heat Exchangers Performance due to declining on Productivity.

2004, August - December: PT. ISTECH RESOURCES ASIA
AS-BUILT 16 GATHERING STATIONS
Client: PT. CALTEX Pacific Indonesia
Position: Process Engineer
Responsibilities:
- Review P&IDs as per existing in the plant,
- Develop PFD and Simulation,
- Ensure that all drawing follow ISA, CPI Drafting Standard including name tag verification and addition,
- Verify all material and heat balance. If necessary to conduct discussion with operation to verify the current material and heat balance.
Scope of work:
PT.Caltex Pacific Indonesia intends to update the Drawings-document matching as installed in the plant, and update the Drawing format and legends refer to Caltex Drawing Standard, ISA. The Gathering Stations are Bangko, Petani, Pematang, Bekasap, Menggala North, Menggala South, Puncak, Ampuh, Jorang, Pemburu, Pelita, Intan, Batang, Kerang, Kopar, Benar and Ujung Tanjung.

2004, February - August: PT. SINGGAR MULIA ENGINEERING CONSULTANT
KM-53 CUSTODY TRANSFER METER BONTANG
Client: PT. VICO Indonesia
Position: Process Engineer
Responsibilities:
- Process Simulation,
- Review P&ID,
- Vessel Sizing, PSV Sizing, and Line Sizing,
- Safety Review,
- Tie-in scheduling and Line scheduling,
- Tie-in procedure and Commissioning procedure
Scope of work:
VICO Indonesia wants to modify Gas Metering System in KM-53 Bontang. There will be re-used Custody Transfer Meter, and a re-used Horizontal Production Separator to handle incoming gas 200 MMscfd, 500 BLPD at 550 Psig, 75¢XF operating condition.

2004, January - July: PT. SINGGAR MULIA ENGINEERING CONSULTANT
BERAS WATER INJECTION PROJECT
Client: PT. VICO Indonesia
Position: Process Engineer
Responsibilities:
- Pipeline Hydraulic Study,
- Pump Sizing,
- Line Schedule and Tie-in Schedule,
- Tie-in Procedure and Commissioning Procedure
Scope of work:
VICO Indonesia wants to modify Water Production System to enhance Beras #4 Well productivity. Water from Production Line after separation process is by passed Phenol Removal System through Tank T-4700, and it will be injected into Beras #4 Injection Well. The required Water capacity on Beras#4 Wellhead is 8000 BBL, 500 psig, 86„aF. For this purpose, it is needed 257.9 BHP injection pump.

2003, November - 2004, January: PT. SINGGAR MULIA ENGINEERING CONSULTANT
SEPINGGAN VICTOR - PRODUCTION PIPELINE INSTALLATION
Client: PT. UNOCAL Indonesia Company
Position: Process Engineer
Responsibilities:
- Pipeline Hydraulic Study
Scope of work:
UNOCAL Indonesia Company plans to install 8.625¡¨OD x 0.375¡¨WT pipe with 3/16¡¨ Coal tar Enamel Pipe Coating, total pipe length 2280 ft connecting Sepinggan ¡* Victor¡¨ Platform to Sepinggan ¡* Production¡¨ Platform to replace existing corroded 12¡¨ NB pipeline.
Pipesim is applied for simulation. This report involves a Hydraulic Study to determine Pressure Drop and Liquid Hold-up of the pipeline for its justification to use. Fluid inlet pipeline is in 3 phases with flowrate of Water 4000 BPD, Oil 1000 BPD, and Gas 10 MMscfd.

2003, October - November: PT. SINGGAR MULIA ENGINEERING CONSULTANT
BANUWATI ¡* A¡¨ DETAILED ENGINEERING, SOUTH EAST SUMATRA GAS PROJECT
Client: CNOOC South East Sumatra BV
Position: Process Engineer
Responsibilities:
- Line Sizing Banuwati ¡* A¡¨,
- Revised Instrument Data Sheet for PSV, Control Valve, Orifice & Restriction Orifice Plate.
Scope of work:
CNOOC South East Sumatra BV plans to build new Banuwati ¡* A¡¨ platform that includes water removal process using Tetra Ethylene Glycol. The line sizing covers the main lines (2¡¨ and above) between and around Separator, TEG-Contactor V-220, Fuel Gas Scrubber V-230, Flash Drum V-260, TEG Regenerator V-240, Pig Launcher L-340, L-350, L-360.
The source gases come from Banuwati Wells and from Mila Wells. Two-phase gas from Mila goes to Separator V-210 to make it into single-phase gas before dehydrated in the TEG Contactor. Banuwati Well single-phase gas goes to TEG Contactor after cooled in Cooler E-200. The dehydrated gas flow to Widuri-P, Pabelokan Island and Fuel Gas Scrubber V-230. Rich Glycol is dehydrated in TEG Regenerator V-240. Liquid outlet of TEG Contactor and Production Separator will flow to Sub- Sea Tie-In Kartini-A Pipeline.

2003, September - October: PT. SINGGAR MULIA ENGINEERING CONSULTANT
SANTAN STA - PLATFORM, GAS LIFT COMPRESSOR INSTALLATION
Client: PT. UNOCAL Indonesia Company
Position: Process Engineer
Responsibilities:
- Line Sizing
Scope of work:
UNOCAL Indonesia Company plans to install a new gas lift compressor at Santan STA Platform. The inlet gas to gas-lift compressor will be taken out from discharge line of the existing compression system C-1 downstream of Air Cooler (E-2). The discharge of the gas lift compressor will be connected to the gas lift header to feed 21 ea typical gas lift flowlines to wellheads.
This report covers a line sizing for major line, such as gas inlet and outlet new compressor skid, fuel gas line, gas lift header, vent line, etc. Line sizing was performed for process gas, liquid to closed drain, and relief header lines.

Non-Engineering Career:
2001, May - August, 2003, August: PT. CIBA VISION BATAM, NOVARTIS COMPANY
Position: Solution Junior Supervisor
Responsibilities:
- Supervise the solution preparation and ensure proper distribution of the solution to designated areas;
- Supervise Treated Water System performance and ensure it meets specification;
- Supervise the sanitation of the solution system and water system as scheduled;
- Control inventory for chemical, PPE, spare parts, equipment and ensure that material ordered meets requirements;
- Purchase Request jobs of spare parts, PPE, stationary, repairing;
- Supervise Waste Treatment System performance, and ensure waste disposed meets requirements;
- Plan schedule of man / machine / material;
- File daily monitoring of the system, batch formula record, certificate of analysis / conformance / calibration;
- Order & follow up uniform, safety shoes, smock for subordinates;
- Plan Schedule the contractor jobs, meets GMP requirements;
- Ensure that SOPs are followed implemented & respected.

Training:
1. Business English Course - Making Presentation
2. Total Quality Control Training
3. Supervisory Skill Development

View contact information...
«« previous resume next resume »»
Search Results (Resumes 7701 to 7750 of 10917)Go to Search Parameters...
Brief Description
Over Three & half years experience in System Administration, Network Administration & System Management in Multinational Software Company & Industry. Good interpersonal skills, ability to work well and hard with multidisciplinary teams, got maximum exposure in MS Windows Systems Administration
Have 10 years experience in oil and gas / petro chemical process area, Hydrotreaters, Delayed cokers, Vacuum distillations, Frac. towers, Strippers vessels, etc.
Like learning something new. Almost 4 years experience in oil&gas and pharmaceuthical device company. Familiar with standards API, GPSA, ASME, NFPA, and program Hysys, Pipesim, Pipephase, Chemcad, Flaresim.
BS of Petroleum Engineer, with a Waterflooding Postgraduate of 2 years, I work with Ecplise and Grid, I made my own project by my own.
Mechanic, mechanical fitter, maintenance, vehicle mechanic, heavy mechanic, diesel mechanic
Chemist (BSc.) Analyst with a broad technical knowledge combined with outstanding leadership ability and creative problem solving skills in both strategic and tactic areas
My Graduation (B.Sc.) is in Mathematics and post graduation(M.Sc.) is in Oceanography. I have one year expereince in the field of Oceanographic research. Also I have cruise expereince of more than one month. I have basic skills in data processing and anlysis, Fortran Programming and other graphics .
Programmer
Fully qualified Project Manager for International Engineering projects
I am piping engineer having experience of three and half years. I have done piping stress analysisin CAESAR II software. I also have 3-D modelling exposure.
B.SC.Mech.Eng., Welding Eng., Project Manager
Skilled MSc ME, specialization Control Systems and Mechatronics
Proven track record of ten years in Senior Management pertaining to broad base Logistical Support, Marine Control, Supply Chain Management, Procurement, and Warehousing fields I have met exacting deadlines of delivery ensuring continuum of multi-million contracts.
1 year experience in CAD package - Unigraphics NX at General Motors.
Summary of Experience
Experience in piping design/layout for industrial, refinery, petrochemical and power plants using CAD soft wares such as PDS, Microstation and AutoCAD.
My drilling fluid experience and Petroleum Engineering background has encouraged me to study numerous facets of the Oil & Gas industry.
Mechanical Engineer, pipe stress, pressure vessel, compress, caesar
1) Graduate in Mechanical Engineering with 12 years experience in Construction Planning in the power, petrochemical, oil & gas, chemical and industrial sector 2) Proficient in Primavera, MS Project, 3) Strong project management, technical, communication and leadership skills
Ten years experience in Mechanical engineering / Project Engineering of EPCM companies.
International civil engineer with fluency in English, German, and Spanish language, with exprience in construction (supervision and design) of power plants, oil & gas projects, infrastructure projects (sewage plants), and dams seeking for jobs worldwide
Geophysicist Seeking a challenging research position in the field of Geophysics where I can prove my capabilities.
I have eight years experience in major civil works projects such as,bridges and metro rail projects.
Software engineer
Skilled in PVR, Roughneck PM, Smart Alek, great written and communication skills, ability to troubleshoot and take corrective action on projects, Extensive background in the design, installation and service of satellite communications equipment; VPN, VoIP, networking and great computer knowledge.
I am HSE professional having work experience of chemical industry and drilling , my education level is masters also completd courageous leadership course in health and safety,management of change, IOSH managing safely,ISO internal audit course,OSHA 18001 internal audit course.
Document Controller, Coordinator, Hr, Admin, IT
High-energy administrative, dependable professional with good judgment and wisdom. Excellent knowledge of principles and procedures for personnel recruitment, selection, training, compensation and benefits, HR information systems, human resources modeling, leadership technique,
Over 17 years of rich & effective experience in Instrumentation maintenance of DCS based controls & instrumentation. Core competence in installation & commissioning field instrumentation, design & logics/programming of DCS / PLC- Honeywell make & Modicon make
QC, NDT, PIPING & WELDING INSPECTION, RTFI, MT, PT, PMI, FERRITE NO,H ARDNESS TESTING, PWHT, PRE HEAT, HYDO/PNEUMATIC TESTING, LINE CHECK, FABRICATION, ERECTION,C OMMISSIONING
International Project, Construction, and Contract Management
Focused well-defined skills in engineering, program/project management, industrial and commercial construction, financial systems, profit and loss, proposals and negotiations.
I am a dedicated and hardworking Materials Coordinator / Controller with an excess of 10 years experience in oil and gas industry.
CV_Ainur Sharipova
Welder Helper / Rigger
Enviromental Geological Engineer and Regulatory Affairs Manager
Recruitment Specialist/HR Generalist
I am an environmental professional with 20+ years of experience in private industry, county government and non-profit marine research. Areas of expertise include management and development of technical and non-technical staff; development of outreach programs, budget planning and management.
M.Sc. (Geology),Reservoir Simulation, PVT analysis, EOR, WSO, Data Management, Reservoir Field Operations, Well Test Analysis, Material balance, Field monitoring.
Experience in handling and Interpretation of Satellite images (LISS and PAN) Working knowledge of ICP-Atomic Emission Spectrometry, Xraydiffractometer (XRD), Digital Spectrophotometer and Digital Flame photometer. Detailed field works carried out in the preparation of Hydrogeomorphology and St
Senior Planning Engineer - 13 years Oil&Gas experience
Strongly involved in pollution prevention, management and control. Participated in pre-treatment of drilling oily wastewater/mud waste treatment in Agip-Saipem Rig -23. Presently exhibiting level 1 standard in Environmental protection. Good knowledge of design/fabrication of engineering facilities
Telecommunication, Health, Safety, Environment and Security Coordinator
Oilfield trucks mechanical technician
ASE CERTIFICATIONS: Drive Train / Engine Repair / Manual Drive Train / Axles / Suspension / Steering / Brakes / Fuel Line Distribution / Heavy / Medium Truck Technician.
Power Engineering at Grande Prairie Regional College, Pipefitting, Equipment Operating, Welders Helper, Willing to start at any entry level position, take any training required. Hold all tickets.
Field Technician
I have long work experience in both tech and service related positions. Such as liner man on the countryside, - an all-weather work, -digging and raising telephone piles. Connecting telephones and represented company in peoples homes.
Geologist
First   Prev   151   152   153   154   [ 155 ]   156   157   158   159   160   161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com