Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #18641 next resume »»
CONTACT INFORMATION:
View contact information...

EMPLOYMENT:
Oct 2004 – Present: Senior Document Controller/ Information Co-Ordinator. (SAKHALIN 2)
Parsons E&C – Great West Road – Brentford – Middlesex – TW8 9AZ
- Responsible to collate all technical details from various department and logging in to spreadsheet.
- Updating report and issuing to client on weekly bases.
- Attending weekly meeting with client.
- Issuing drawings and documents to pre-determined recipients and reports to client.
- Prepare reports from the drawing register as required.
- Highlighting areas of concern.
- Filing all drawings and maintaining documents.
- File all superseded drawings and documents.
- Assist project Managers when required.
- Issuing documents by EDMS systems.
- Time to time visiting site (Italy)

Jan 2003 – Oct 2004: Senior Document Controller - (WESTERN LIBYA GAS PROJECT)
- Saipem UK Limited - Responsible to AGIP Gas BV (Client)
- Action taken promptly for various queries when raised by Clients.
- Managing the document control department under my own supervision.
- Chasing engineers to return the vendor documents and in-house drawings on time.
- Coordinating with the head of delivery and development, to ensure that required documents are obtained and distributed correctly.
- Responsible for the archiving of project documentation and ensuring that client can easily retrieve them.
- Providing various reports for project management, client, site personnel and subcontractors.
- Maintenance of electronic and paper filing systems and associated logs.
- Issuing documents by EDMS systems.
- Review and maintain document control register and reporting to project manager.

Nov 2002 – Jan 2003: Senior Document Controller - National Physical Laboratory, Teddington
- Responsible to Project Manager for the construction
- Design & implementation of document/procedural/Computer system.
- Action taken promptly for various queries when raised by Site or Clients.
- Issuing and tracking of drawing and documents.
- Expediting outstanding returns from package engineers and suppliers.

Mar 2001- Oct 2002: Senior Document Controller (CORRIB FIELD DEVELOPMENT
PROJECT-IRELAND)
- AMEC Capital Projects, Responsible to Project Manager.
- Construction, Design & Implementation of document/procedural/Computer system
- Chasing engineers to return the vendor documents and in-house drawings on time.
- Action taken promptly for various queries when raised by Site or Clients.
- Ensure communication flow to Client and Partners (Hard and Electronic)
- Issuing and tracking of drawing and documents.
- Vendor Control system and communication
- Expediting outstanding returns from package engineers and suppliers
- Highlighting areas of concern.

Nov 1999 – Mar 2001: Document Controller (Hotel Property Investors)
DOCUMENT CONTROLLER holding the following key responsibilities:-
- Overseeing and managing day to day operations.
- Delivering weekly reports and ECN status to the Consultants and Sub-Contractors.
- Organizing Weekly Reports on drawings and Materials status.
- Providing weekly follow up documents and drawings to Consultants.
- Implementing and drawings to be identified from the Sub-Contractor and issuing to in-house engineers for review.
- Implementing weekly reports to the Project Manager.
- Overseeing and checking quantities and item descriptions against delivery note.
- Ensuring all material is log onto Excel Spreadsheets.
- Producing material reconciliation reports.
- Supervising site personnel.

Feb 1999 – Oct 1999: Senior Document Controller (London Jubilee Line - Underground)
- London Underground Limited - Responsible to Project Manager.
- Design, implementation and setup of Document Control systems.
- Liaison with Main and Sub-contractor to ensure communication flow of a high standard.
- Ensuring all material are log onto Excel Spreadsheets.
- Producing material reconciliation reports.
- Overseeing and checking quantities and items descriptions against delivery note.
- Overseeing and co-ordination the receipt and review of Sub-Contractor as built drawing and project closeout documentation.
- Managing the processing of all documents to ensure details are added to the database and transmittals created for the distribution of document to various department and engineers.
- Managing various reports according to each discipline/category by internal and external Engineers and Sub-Contractors.
- Supplying the site team with details information.

Jan 1998 – Feb 1999: Document Controller (British Airways Hotel - Heathrow Airport)
John Laing Construction Limited:
- Sole control of all aspects in document control on the projects.
- Visiting Sub-Contractors on site.
- Delivering reports to clients and Senior Managers.
- Updating all drawings in the drawing office.
- Overseeing and checking orders for customers.
- Administration and preparation and report writing.

Apr 1995 – Jan 1998: Senior Document Controller (RELIANCE JAMNAGAR REFINERY &
PETROCHEMICALS COMPLEX PROJECT)
Bechtel Limited
- Identifying, organizing and supplying documentation.
- Dealing with the maintenance of suitable records of all documentation.
- Issuing the progress report to Project Management scanning of all-important engineering and supplier documents.
- Managing the processing of all documents to ensure details are added to the database and transmittals created for the distribution of document to various department and engineers.
- Liasing with Design Contractors DCC.
- Provide technical assistance to other project dept. vendor, sub-contractor and other sources.
- Filing, maintaining documents.

Mar 1994 – Mar 1995: Document Controller/Technical Assistant
Noble Denton Limited
- Responsible for logging all incoming and outgoing correspondence, extensive use on various computer packages and managing project related timesheet records up to date.
- Filing and maintaining documents

Jun 1992 – Jan 1994: Document Controller (Thames Water)
Thames Water Utilities.
- Inputting of supplier's documentation onto tracking database.
- Main responsibility-tracking of engineering documentation.
- Filing all documents and maintaining.
- Issuing of weekly reports.

Jan 1992 – May 1992: Legal Assistant – (M.O.D Legal Department)
M.O.D – London
- Responsibilities included maintenance of all MOD legal documentation.

Nov 1985 – Jan 1991: Project Technician (Standard Equipment Group)
Air Products Limited
- Main Responsibility tracking all purchase orders and invoices.
- Issuing purchase orders materials under £3000.00.
- Attending weekly meeting.
- Archiving of all original documentation within standard engineering group.
- Compiling schedules registers and reports on daily/weely/monthly basis.
- Receive and send all official documents between the client and the contractor and other organizations within projects, logs entries for tracking purposes.
- Filling all documents and technical documents in the control section of the project dept.

EDUCATION:
1970 – 1975: Rockby High School – Startford, London E15.
5 GCE O'Levels including Maths and English.
1975 – 1976: East Ham Technical College – London E6.
City & Guilds in Computer Programming.

Reference:
Available upon request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2901 to 2950 of 9785)Go to Search Parameters...
Brief Description
Experienced Contracts Engineer with more than 15 years of experience
German R. Leal Mechanical engineer with 15 years industrial experience in Petrochemical and Oil Plants. HRSG Boiler/Plant. Piping Engineering and Design (PI&D), Flow Sheet, Plot Plan. ASME B31.1;3, 5,8, 11 ASME BPV Sect VIII. Stress Analysis CAEPIPE, Auto Pipe.
PhD candidate with experience in hardrock and softrock
plant operations/project management in power, petrochemical industry
Extensively experienced with the specification, bid evaluation and purchasing of mechanical equipment and pipelines.
I am smart Lithuanian male, strong wide profile IT specialist with more than 15 years related experience and searching for the position in IT sector, where my experience and strong background in computer science can be best utilized. My main personal qualities is: calm, disciplined, communicable.
12 years oil&gas experience geologist& mudlogger,8 years environmental scientist, MS&BS Degrees in Geology, recent education includes 32 semester hours of business and computer courses, 1989&90, 3.7GPA, 20 semester hours of graduate courses in environmental science, 1997, 4.0GPA
Seeking an opportunity to work in a professionally managed organization
Control System Hardware Design for DeltaV/ DCS
Subsea Pipeline Engineer with experience in the field of engineering (FEED & Detailed Design), material, installation and cost estimation.
Construction, Commissioning and Operation & Maintenance procedures including emergency response procedures in line with best industry practices and based on approved applicable standards, Engineering for Procurement, vendor drawing review, site co-ordination and supervision, installation and commiss
Based on my experiences and knowledge in implementing the safety procedures and teaching the safety techniques in working safely, I'm very confident to be a part of your good office. I promise to help your company Incident Injury-Free
M.SC chemistry with painting inspection experience
I am a Qualified and experienced NDT INSPECTOR with ASNT LEVELII, and Diploma in mechanical enginner
Around 7.0 years of experience in design & construction of power plant structures, EHV indoor and outdoor sub-stations, industrial & residential structures.
Aspen 12.1, Pro II, HYSIS, DMC, CONTROL STATION
I have a wide knowledge of on & offshore,gas, petrochemical and marine electrical systems.this knowledge and experience in conjunction with my professional qualifications combine to offer any potential employer the benefits of a well rounded and knowledgeable individual. Valid 4 Year Australian Visa
Reservoir engineer
Remote Sensing, GIS and Photogrammetry (M.Sc Remote Sensing)
I am working with Reliance Industries Ltd. [ Refinary Division ] since 2001. My responsibility is Panel operaton.
Work as HSE supervisor
7 years working experience in Logistic, roven hands-on experience in many different logistic areas, from Project Planning, Development and Implementation, HSE regulations, Financial Administration, HR management, Purchasing and Supply chain, Warehouse processes and Transports, Camps and Offices set
Inspecton & certification of coating work
Coil Tubing/ Petroleum Engineer/Supervisor )
I have 15 years experience inpetrochemical plant.
organize fire department,good knowledge of fire fighting, organise periodic testing and maintenance of fire equipments.
A highly motivated, team spirited and performance driven engineering professional with an extraordinary blend of experience in Petroleum refining industry. Recognized for keen ability for improvement in reliability of a wide range of static equipment like crude oil heaters, high temperature hydrogen
I am at present looking for the Driller position. I have worked in the drilling industry for some 11 years
Electrical, planning and IT
PDS, PDMS, Smart Plant Review, navis work
Certified Internal Auditor, international auditor
Chief elecrician !!!
Material Management, Inventory control, Procurement, follow-up,Procurement Planning etc
A visionary executive with 16 years experience and proven history of outstanding performance in Industrial automation & Instrumentation in Project Design, Application and Development. Dynamic, skilled specialist with excellent record in Power, Refinery, Oil & Gas, Polyester, propylene, Pulp-Paper
Mechanical Engineering Technologist
Well logging, seismic data interpreting, sea mapping
To utilize my broad skills and experience in offshore and onshore oil and gas installation for process control instrumentation and electrical maintenance.
Medic wityh 14 years experience
Bachelors degree in Civil Engineering with more than 15 years experience in project engineering, construction and project controls with international exposure in oil and gas sector and other areas which encompasses the functions of planning, budgeting, scheduling, schedule controlling.
My skills:Experienced Project Document Control Supervisor working on large-scale on-shore/off-shore projects past 8years. Experienced in handling design/vendor packages, expediting of subcontractor’s package, Document Control, scheduling, progress reporting, good communication skills
Operations Manager, Barge Master, Barge Captain, Master Mariner, Rigging and Scaffolding Supervisor, Crane Operator.
Senior Contracts Manager - 25+ yrs experience in Power Plants, Airports, Water Treatment Plants, Major Civils and pipeline projects in Malaysia, Pakistan, Gibraltar, UK. Contract preparation and management ( EPC & Supplier )plus broad knowledge of planning, costs controls and project mamagement.
An adaptable Materials Controller with specialist strengths gained onshore, offshore and overseas. Supervisory and hands-on experience, with the ability to communicate at all levels in a fast moving environment. Experience in Drilling, Construction, Maintenance and Production.
Work History in brief: Hay Engineering Ltd - 1985-89 Sedco Forex - 1989-94 Retsco Intenational - 1994-99 Finnco Ltd - 1999-2000 Transocean Deepwater drilling - - 2000-2003 BP-CNOOC - - 2003 - present.
Application for Offshore Drilling Rig Mechanic
Experienced Cad Manager/Project Coordinator. Proficient with 3d modelling using Autocad, ADT33, Autoplant, CadDuct and MultiSteel. Also experienced in using Microstation, PDMS, Prime Medusa and ProcAdam. Engineering background - Structural/Civil.
Over twenty-seven years of domestic and international experience with a broad range of pipeline, oil and gas, and associated facilities projects.
Bachelors in Technology - Chemical Engineering – 14 years performing works on: Hysys, Pro-ii, Pipe Phase, Sinet, AutoCAD, AutoLISP, Micro-Station, 3Dstudio Max, Primavera, MS-Project and MS-Office products
chronological resume last updated April 12, 2004
Ops., Eng. and Field Service Manager: experienced in technical, project and operations management; strong and extensive record in managing engineering & operation personnel teams; implementing from start to finish of corporate technology programs provided to diverse clients around the world.
First   Prev   51   52   53   54   55   56   57   58   [ 59 ]   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com