Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #27315 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE:
To be part of growth oriented dynamic organization, which may provide
Substantial opportunity for using my professional expertise and give opportunity to continuously enhance my skills.

PROFESSIONAL QUALIFICATIONS:
BE Electrical from Jamia Millia Islamia
MBA from IGNOU

SOFTWARE KNOWN: MS Office

TECHNICAL SOFTWARE: Expertise in Autocad2000, Primavera, MS Project
ETAP400, DIGSI4.3, STEP7

EXPERIENCE: 17.5 Years

Experience Abroad: Three and half Year abroad

Special Equipment Used: Freja RTS21 for electrical testing

WORKING EXPERIENCE
Presently working as HOD Electrical in DS Construction since 02/10/2004 in LIBYA.
Presently controlling the following projects
1) SNCC Building
2) 2 No. 400KV/220 KV Substation (Completed)
3) Surman Waste Water Treatment Plant
4) 35 No. 11/.4 KV substations
5) Rasnaluf Oil Refinery Gas Store and Gate House

ACHIEVEMENTS
1) Saved the company 11.424 million Euros and 2.366 million LD
February 2004 to August 2004
Organization: Reliance Energy
Designation: Project Co-ordinator

Major Responsibilities and Assignments
1. Complete Project Co-ordination of Tau Devi Lal Thermal power Station of 2x250MW
2. Design Co-ordination of various Packages like CHP, AHP, Fuel Oil Handling system, Air Conditioning, Fire Fighting etc

October 2002 to January 2004
Organization: Plant Electrical Instrumentation Pte Ltd

Designation: Astt. Manager (Electrical)
Major Responsibilities and Assignments

1. Complete site management of UMCI site.
2. Design and Engineering for Electrical portion of various projects at ExxonMobil
3. Installation and Commissioning of HV Panel, LV Panel,6.6KV/415V. Transformer at WRP Selator.
4. Proposal work for electrical portion of all Projects

July 2001 to September 2002
Organization: FENNER INDIA LIMITED
Designation: Dy. Manager (Electrical)
Major Responsibilities and Assignments
1. P&ID for Nalco Angul Project
2. Earthing Layout for Nalco Angul project
3. Eqpt. Layout for Nalco Angul project
4. Lighting Layout for Nalco Angul project
5. Cable routing Layout for Nalco Angul project
6. Tendering and estimation of TPS Paricha project CHP
7. Co-ordination of all running projects from electrical side.
8. Complete Electrical design and commissioning of Malco Salem project.

May 2000 to June 2001
Organization: HYUNDAI ENGG & CONST. LTD.
Designation: Astt. Manager (Electrical)

Major Responsibilities and Assignments
1.Commissioned 12 new GIS substations,1 EXT.GIS substation.
2.Tested Alstom, Siemens and Reyrole Numerical relays through Freja Kit
3. Errected tested and commissioned 25 No.s 33/11 KV transformer of 25 MVA.

May 1999 to May 2000
Organization: FENNER INDIA LIMITED
Designation: Dy. Manager (Electrical)

Major Responsibilities and Assignments
1. All the designing required for Neyvelli Lignite Corporation 400 Million job has been done by me for TPS-1 expansion Conveyors including 6.6KV/415V substation and PLC

2. Project of Coal Handling Plant (CHP) at TCPL at GHUMDIPOONDI through PLC successfully completed.
3. Project of CHP at NALCO Damanjowdi through control desk has been designed by me and execution in process..
4. Project of 17X conveyor at Neyvelli Lignite Corporation. TPS-2 modification has been designed and successfully completed by me.
5. Project of conveyors at Gem Sugar has been designed by me.

September 1995 TO April 1999
Organization: IRCON INTERNATIONAL LIMITED
Designation: Assistant Project Manager

Major Responsibilities and Assignments
1. Assuring QA / QC of complete electrification of UP Petrochemical Complex at PATA
2. Relay testing and scheme checking of all the panels in. GCU / GPU and OFFSITES & UTILITIES.
3. Commissioning of all the HT and LT motors & MOV 's in GCU / GPU and OFFSITES & UTILITIES.
4. Planning and execution of our UP Petrochemical contracts using various. software.
5. Erection and commissioning of 1 MVA DG set.
6. Circuit Wiring of all Hazardous & Non Hazardous areas.
7. Cable laying of HT & LT Cables of 91 Kms.
8. Platform Pole mounting & Street Light Pole erection
9. Flood Light mast erection and commissioning.
10. Battery charging up to 600Ah & Battery charger erection & commissioning.
11. Tender evaluation & laying specifications for floating contracts.
12. Computerized billing & budgeting of our contract.
13. Coordinating & corresponding with the Client & the Consultant.
14. Erection and testing of 220 KV SF6 CB, isolator and earth arrestors in the switchyard.

September 1993 to September 1995
Organization: NEW DELHI TRADERS
Designation: Project Engineer
Major Responsibilities and Assignments

1. Repair of transformers of 33 KV to 415 V of all makes.
3. Installation, testing and commissioning of 33 / 11 KV substation.

September 1990 to September 1993
Organization: RANKA CABLES INDIA LTD.
Designation: Maintenance Engineer
Major Responsibilities and Assignments

1. Maintenance of 33 / 11 KV substations.
2. Maintenance of wire drawing machine.
3. General maintenance of the complete plant.
4.Preparing schedule of maintenance & arranging shut down

April 1983 to June 1986
Organization: NATIONAL ELECTRICAL EQUIPMENT
Designation: Supervisor
Major Responsibilities and Assignments
1. Execution of sales of LT panels.
2.Procurement of LT equipments for LT Panels.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 5901 to 5950 of 9785)Go to Search Parameters...
Brief Description
Petroleum Engineering degree from USL, registered P.Eng in Alberta. Expert in hydraulic isolation, remedial well interventions, technical program preparation. Excellent project management skills. Have work experience in Texas, Louisiana, India and Middle East, on-shore and off-shore.
Over 13 years experience as an Advanced Care paramedic. Extensive remote area paramedic coverage-Pipeline construction and oilfield exploration rig. Helicopter rescue/retrieval.
I have been working as a research scientist at PDVSA-Intevep, the R&D and Support Centre of Petroleos de Venezuela. I specialize in chemical formulation of emulsions and drilling and workover fluids oriented to new developments that impact the productivity of oil and gas wells.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to product and process development, increase in productivity and better market position.
I am a Metallurgical Engineer with 7 Years of experience in the field of corrosion control and integrity management for oil and gas pipelines and facilities.
AIR SEPARATION PLANT Operator
Skills: Critical thinking, active listening, negotiation, persuasion. Qualifications: Product /Proyect /Marketing Manager
Tax Specialist
15 years Domestic and International Management experience. B.Sc. Mining Engineering.
Fasteners Design & Development Engineer
Piping Designer;Intergraph PDS Piping, Equipment, Frameworks Plus and Microstation Modeler. Smart Plant Review (SPR) Operator.; PDMS (Customized Version, General Module) Modeler and Review Reality Operator;AutoCAD Release14 to 2005 Operator/Draftsperson
I am currently just finished my final semester, pursuing Bachelor of Engineering (Hons.) Chemical major in Petroleum in Universiti Teknologi PETRONAS with CGPA 3.17.
I am a fresh out of college with a Bachelors Degree in Geophysics
Diploma in Mechanical Engineering. (First Class with Honours)-April 2002. (With 88%)
Qualified Electrician. Hazardous Area Installation, maintanence, inspection and testing Specialist. IRATA level 1 rope access technician.
Fresh graduate petroleum engineer
I am well in Petroleum refinery processes and i am undergegoing training in a reputed design concern. I am good with computers in using softwares for design.
A resourceful person with good interpersonal and communication skills, analytical skills and creativity, a team player with the aim of assisting organizations meet their goals and objectives through hard work, dedicated commitment, studying, loyalty, sense of integrity and high quality delivery bea
I have completed my B-tech in Mechanical Automobile engineering from University of Kerala
Education qualifications: July 2005 - B.Sc of chemistry & geology
I am a chemical diploma holder and having 02 years apprinticeship as plant operator from fertilizer (Ammonia Plant) FFBL and having round about 06 years oil and gas processing plants experience.
I am a fresh graduate GAS Engg. I know Reservoir Engg., Onshore/Offshore Drilling, Production Engg., Coal Bed Methane Exploration & Production, Natural gas handling, Oil & Gas pipeline transportation. I am very intersted in Onshore/Offshore Drilling & Reservoir
I have the experience of complete Electrification of UP Petrochemical Plant and commissioned various Coal Handling Plant in various projects in Fenner India Ltd. I was working in Hyundai engineering and construction company ltd, Korea as Astt. Manager(Electrical) in Abu Dhabi for 19no. 33/11 KV
Functioning in a project/program management consulting role for MAXAM and CYANCO Companies on highly sensitive processes. In these assignments, I assembled high-performing teams that delivered a complex project plan ahead of schedule, despite a demanding timeline and aggressive business objectives
To work in oil and gas refineries, high rise buildings, jet fuel storage, cross country pipelines to international airports, road works and other related industry that may acquire my skills and knowledge.
Experienced HR professional; MBA in HRM; International compensation, recruiting, employee relations, performance management, training and development, health and safety
A senior-level environmental, safety, security and health professional who has worked in the manufacturing as well as EHS functions for private firms as well as large corporations and consistently contributes to corporate goals. A proven trouble-shooter, problem solver and innovator with a strong t
Proficient in Instrumentation Job.
I am working as a Executive Engineer in SIEMENS PAKISTAN LTD IN Engineering, Construction & Maintenance Department (Oil and Gas Projects). Currently working on a Project of Lasmo ENI Pakistan Limited working as a field engineer & had gained a experience of Construction of Structure & Piping.
B-Tech Electronics& Instrumentation, 1 yr Exp,APGD in VLSI Design,Advance Diploma In industrial Automation &system Design. Lab view 8.2 ,QMAXV200,ATMEL89S51 microcontroller,VB6,Plc,I/C verification.working as Elect ronics Engr With Russian Tech Centre Pvt Ltd GOA
B.E.Electrical with 1.5 year Experience
Seeking an International and challenging position in the field of Quality Assurance / Quality Control in the large Oil & Gas Sector in an established company where I will be able to contribute my full efforts for the prosperity of the company and at the same time enrich my knowledge and experience.
International Project Manager
I want to work in an organization where I can best utilize functional and interpersonal skills to drive the organization towards achieving its objectives
I am a 4 year landman with a very strong work ethic, a team player with very good verbal communication skills with landowners. I would be a great addition to any company needing an inhouse landman.
I have graduated from Bellingham Technical College and finished my AAS in Instrumentation and Controls Technology, I have experience in working with Emerson Process Management's DeltaV DCS System
Presently working on board a Jack-up rig in Qatar (Noble Rig) since October, 2007 as SAFETY TRAINING SUPERVISOR (STS). 11 months worked on board same Jack-up rig in Qatar Offshore (Noble Rig) as Radio Operator / Trainee Safety Officer.
See resume for details
Seeking a mining /Geotechnical Engineering position
Project Management in Chemical turnkey consultatnts, Master degree in Chemical Plant Design from REC Karnataka, India with Distinction.
Senior OPERATOR Diploma in PETROLEUM ENGINEERING Around 7 Years in Refinery only.
Areas of Expertise: * Engineering & construction of onshore pipeline/piping projects.* Front end engineering (FEED).* Project Management.* Conversant with international codes & standards and Shell standards (DEP).
Responsibilities include the preparation of specification for stress/vibration analysis, identification and preparation of critical line list requiring stress analysis, calculation of loading data, evaluation of nozzle loads resulting from stress analysis result, and selection of pipe supports.
Field Operator / Panel Operator Pre-Commissioning & Commissioning Startup, Shutdown And Plant Emergencies Handling
Librarian / Information Management / Information Scientist / Document Controlle
Service Engineer with ( 07 ) years seniority in a broad range of Coiled tubing operations offshore on land West and North Africa , Scotland and Middle East. Proficiency in Hardware / Operating System PC's Software : Coiled tubing & well completion engineering design /application software.
7 years of experience in SalesMarketing-Oil industry. Highly self-motivated and results driven. Excellent communication and inter-personal skills. Ability to present advanced technical material. Experience in WellTesting interpretation soft (Kappa, Sch) and in Economic Evaluation applic. (GeoQuest).
Engineer Reservoir I received a very vast formation taking the liberty to work like borer, exploiter and developer. I am fascinated of my profession, speak French, Russian, English, Spanish and am more that determines to integrate your society.
Transferable knowledge, skills, and abilities from several years of field experience in the oil and gas industry accompanied with a related post-secondary education. 7 years drilling rig experience, independent work habits, problem solving abilities, and effective communication skills.
I have thirteen years of experience in the petrochemical, food and cement manufacturing industry. I was responsible for the reliability, maintenance, engineering and management process improvements of fourteen manufacturing plants through out the United States of America and Egypt.
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   [ 119 ]   120   121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com