QUALIFICATION:
B.Sc. in Electrical Engineering,
Communication & Electro-physics major,
Alexandria University, Faculty of Engineering.
(Graduated June1996)
CAREER SUMMARY:
Control Systems Engineer (6 years) experienced in the following:
- Control System design, implementation, testing and commissioning o Troubleshooting control system problems, including field instrumentation o Tuning of automatic control system loops including Boiler Control Systems o Implementation and troubleshooting of Advanced Control systems and strategy o Implementation and functional testing of Boiler Control System, Burner Management System, Motor Control System, Turbine Control System, Balance of Plant.
- Implementation and troubleshooting of Plant History systems (Honeywell PHD)
- Working on large projects and with large project teams, including E&I content o Working in a multi-cultural, cross-functional teaming environment, Currently working as the Project Control Systems Engineer of 2 large E&I projects installing and commissioning Honeywell and 3rd party systems on 8 units at 2 fossil power plants.
- Chemical, Refining, Oil and Gas Industry.
Current position:
Lead Projects Engineer, Honeywell Egypt
TECHNICAL COURSES:
25th May 05:
Experion PKS System Installation and Administration, Process Automation College, Abu Dhabi, UAE.
19th Apr.00:
3310-Application Module Implementation Course, Process Automation College, Abu Dhabi, UAE.
13th Oct. 99:
5736-TPS System Implementation & Administration Course, Process Automation College, Abu Dhabi, UAE
06th Oct. 99:
5711-GUS Implementation Differences Course,
Process Automation College, Abu Dhabi, UAE.
July 99:
Microsoft Windows NT4 Administration, at Microsoft Training Center, Cairo, Egypt.
July 99:
Honeywell TDC2000, Basic controller, at Honeywell Egypt training center in Cairo, Egypt
March to May 99:
Honeywell TDC3000, DCS system training at Honeywell Egypt training center in Cairo, Egypt, o TDC3000 functional overview o LCN Universal Station implementation o LCN / UCN Implementation and maintenance o HPM implementation o HPM maintenance o Application module implementation
On job training at Egyptian Petrochemical (EPC), VCM Extension unit
EMPLOYMENT HISTORY:
Feb. 99 to date:
Honeywell Egypt
Engineering office which support the Egyptian business, its main role is to support other well established Middle East offices in Oman, Saudi Arabia, Kuwait and the U.A.E; with systems engineering support and engineering manpower for service and commissioning.
March 98 to Jan 99:
E&I Filed Engineer at the following projects:
o Trans Gulf LPG Expansion, Ras-Bakr, Red Sea, Egypt (Petrojet Eastern, Ennpi, Gupco)
o Obaiyed Gas Field Development, Western Desert, Egypt (Elequip, Brown & Root, Bapetco)
Current Job Experience:
Jan. 04 to March 05:
Abu Qir Power Plant, Alexandria, and Abu Sultan Power Plant, Ismailia, Egypt
Technical Services, Maintenance, and Punch list completion for Honeywell System, 3rd Party Systems and Field Instruments.
Handling multinational vendors work at both plants for 3rd party systems.
Honeywell representative in all technical meetings at Egypt and USA
Sep. 01 to Dec. 03:
Abu Qir Power Plant, Alexandria, Egypt,
Project for modernization of 4 fossil units (gas/heavy oil firing), each unit is 150MW capacity.
System installation, power up, commissioning, startup and operator training, in addition to Tuning of Boiler Control and other loops.
System is consisting of 20 GUS stations, 6 redundant NIM, 23 redundant HPM, 2 Application Module for Turbine Control, LCN Extenders (LCNE) using fiber optics, GPS for network time synchronization, 4 Plant History Detail (Honeywell PHD), 1 PHD server, 2 Performance Calculation PC (Honeywell TPPM & TPRL), 8 OPC servers for MK VI – DCS interface, NT4 PDC and BDC for LAN, 4 Cyberex 20KVA UPS and Sola Power supplies for 24 VDC generation.
In addition to 3rd party systems, 4 GE Mark VI for Turbine Control and 4 Bently Nevada BN 3500 for Turbine Monitoring
Field Installation, Trouble Shooting and Functional Test of about 200 different Transmitters (Honeywell and Fisher), 8 Brooks flow meters for heavy oil, about 160 I/P, 12 Copes Vulcan Control Valves, about 300 TC and RTD, 2 SynFab Air Dryers, Fire Alarm System, Trane HVAC, New Turbine High Pressure System include 8 HP Hydraulic pumps, 16 Turbine CV, 8 Turbine IV.
Aug. to Sep. 01:
Factory Acceptance Test (FAT), at Honeywell Houston (TX40), Houston.
Customer: PSSG and Egyptian Electricity Authority
TPS system engineering done by AZ15 and TX40,
End User: Abu Qir Power Plant.
Feb. to July 01:
Honeywell US, Phoenix (AZ15) and Houston (TX40)
Detail Engineering of Abu Sultan and Abu Qir Power Plants modernization Projects, each plant contains 4 units each generates 150MW Gas/Heavy Oil fired.
I have been part of the team to implement the following:
- Transfer the old relay logic system to DCS logic in Motor Control System (MCS).
- Transfer the old relay logic system to DCS logic in Burner Management System (BMS).
- Transfer the old control schematics to DCS algorithms in Boiler Control System (BCS).
- Update the electrical drawings and Sama drawings.
- Simulation for testing MCS, BMS and BCS.
- System Database.
- System Graphics.
Dec. 00 to Jan. 01:
Oman, Petroleum Development of Oman (PDO),Alnoor Plant.
Commissioning and Start Up of Alnoor Plant.
Dec. 00:
Oman, Petroleum Development of Oman (PDO),Birba Plant.
Eng. &Commissioning of Birba New Wells Hook Up.
Nov. 00:
Oman, Petroleum Development of Oman (PDO),Yibal B, Yibal C, Yibal D, GGP, Fahud, Lekhwair Plants and Oman Cement Company
DCS Technical Services and Maintenance.
Oct. 00:
Oman, Petroleum Development of Oman (PDO),Yibal B, Yibal C, Yibal D and Lekhwair Plants.
Engineering and Commissioning Design Integrity of Smokeless Flare, which includes implementation of Database, Logic, Graphics
July to Sep.00:
Western Desert Gas Development projects (WDGD)Khalda Petroleum Co. (KPC)
Tarek, Salam, Sumpetco Gas Plants.
Site Assistance and DCS technical support for the 3 remote Gas Plants TPS system.
May to June 00:
Oman, Petroleum Development of Oman (PDO),Yibal B Plant.
FSC and CCC Integration with DCS for Yibal B Compressors Control.
April 00:
Oman, Petroleum Development of Oman (PDO), SADAD Plant.
Engineering & Commissioning of Crude Oil Export Pumps, which includes implementation of Database, Logic, Graphics
Feb. 00:
Factory Acceptance Test (FAT), at Honeywell France (FR01), Paris.
Customer: Foster Wheeler France,
TPS system engineering done by Honeywell France,
End User: Alexandria Mineral Oils Co. (AMOC)
Dec. 99 to Jan.00:
Western Desert Gas Development projects (WDGD), March 00
Khalda Petroleum Co. (KPC)Tarek, Salam, Sumpetco Gas Plants.
TPS system installation, power-up, commissioning, startup and operator training for 3 remote Gas Plants TPS systems each include three GUS stations, one redundant NIM, three redundant HPMs and Honeywell Safeguarding System (FSC).
Oct. to Dec. 99:
Amerya Petroleum refining Co. (APRC)
Main Contractor: Petrofac LLC, Texas
Naphtha Isomerisation unit
TPS system installation, power-up, commissioning, startup and operator training for new TPS system, including three GUS stations, one redundant NIM, one PHD, and on redundant HPM.
Aug. to Sept. 99:
Egyptian Petrochemical Company (EPC),
Transfer TDC2000 to TDC3000 system.
Highway Gateway (HG) database building, all old graphics rebuilding, hardware Installation, commissioning, start up, verification and test of all points transferred.
June to July 99:
DCS Technical Services and Maintenance for local customers located in Alexandria, o Alexandria Carbon Black (ACBC), o Egyptian Petrochemical Company (EPC), o Alexandria Petroleum Company (APC) spent oil and lube oil complex.
March to June 99:
Egyptian Petrochemical Co. (EPC)
Main Contractor: Krupp Uhde, Germany
Venyl Chloride Monumer (VCM) extension unit
Site Assistance of TPS system installation, power-up, commissioning, startup and operator training.
System is consisting of two GUS stations, one redundant NIM, one redundant HG connected to the running TDC2000 system, and one redundant HPM.
March 99:
Alex Petroleum Company (APC),
Spent Oil and Lube Oil Complex.
Heat and Material Balance Programs verification
Available Personnel References at Honeywell:
Dieter Roy, Program Manager, dieter.roy@honeywell.com
Paul Wiley, TX57, Senior Project Manager, paul.wiley@honeywell.com
Terry Clarkson, TX57, Senior Lead Engineer, terry.Clarkson@honeywell.com
View contact information... |