Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #27884
next resume »»
CONTACT INFORMATION:
View contact information...
WORK EXPERIENCE
* Aker Kvaerner: Senior / Lead Process Engineer - June 2006 to March 2008 (Brisbane, QLD, Australia)
a) BP Bulwer Refinery – Hydrogen Compression Project (Aug 2007 – Present)
Worked as a Senior Process Engineer supervising a team of 3 other engineers in charge of the Relief System / Relief Valves and major Control valves related to the installation of a new Hydrogen Compressor package at the BP Bulwer Refinery. Reviewed relief scenarios, compiled and checked calculations, sized relief valves and control valves and prepared datasheets.
b) BP Kwinana Refinery – G10 Diesel Capability Project (June 2007 – Aug 2007)
As a Senior Process Engineer conducted study work for the BP Kwinana Refinery to evaluate options for upgrading the existing Hydrofiner Units to meet the new G10 Diesel Sulphur specification. Used HYSYS along with TASC, ACOL, and HTRI for equipment rating to assist in evaluating design options.
c) BP Bulwer Refinery – Relief Study – Capacity Verification of Overpressure Protection Devices (July 2006 – May 2007)
Senior Process Engineer for the relief study work related to the Residue Cracking Unit / Vapor Recovery Unit / Merox Sulfur Removal Unit and Lead Process Engineer for the relief study work related to the Amine Treating Units and Sulphur Recovery Units for the
* WorleyParsons: Senior / Lead Process Engineer – January 2006 to June 2006 (Melbourne, VIC, Australia)
a) Midwest BD - Biodiesel Production Facility / Select Phase (February 2006 to April 2006)
Positioned as the Lead Process Engineer I assisted the engineering team in developing the site layout, sizing equipment (tanks, pumps, utility packages), and completing the Basis of Design Document related to a proposed Biodiesel production facility.
b) Origin Energy – Bas Gas LPG Recovery Facility / Low Temperature Review (January 2006 – February 2006)
Positioned as a Senior Process Engineer I performed steady state and dynamic evaluations using HYSYS to evaluate low temperature concerns within an LPG Recovery Facility. Compiled calculations & reviewed calculations compiled by others.
* WorleyParsons MEG: Lead Process Engineer – August 2005 to December 2005 (Calgary, AB, Canada)
MEG Energy – Worked as an Area Lead in charge of the BFW and Steam Generation systems for the FEED and partial Detailed Engineering phases of a 30,000 bpd SAGD (Steam Assisted Gravity Drainage) Oil Sands facility. Prepared Process Flow Diagrams (PFDs) and Piping and Instrumentation Diagrams (P&IDs), performed equipment sizing calculations (pumps, tanks, heat exchangers, control valves, PSVs), compiled calculation documentation, and assembled equipment data sheets.
* Acres Parsons E&C: Intermediate Process Engineer - February 2004 to July 2005
a) Petro Canada Mackay River – Extended Study Work (April 2005 - Present)
Involved in study efforts to evaluate the impact of design options on the overall Capital and Operating cost estimates for the proposed Commercial Facility. Assumed a lead role for the work involving steam co-injection with various solvents (diluent / butane) and assisted in the work related to the following: evaluating varying plant capacities; the impact of modifying the SOR (steam to oil ratio); utilizing a fractionator for enhanced diluent recovery; using eductors for steam re-injection at the wellpads.
b) Petro Canada Mackay River / Meadow Creek - SAGD Conceptual Engineering Study (Oct 2004 – March 2005)
Utilized HYSYS to simulate the complete 40,000 bpd SAGD (Steam Assisted Gravity Drainage) Oil Sands facility. Compiled the related Heat and Material Balances and assisted in the development of the PFDs and the Design Basis Memorandum (DBM) document. Sized vessels, pumps, and tanks and used ACX and STX to size Air Coolers and Shell and Tube Heat Exchangers. Completed equipment data sheets and wrote technical memorandum documents.
c) ConocoPhilips Surmont SAGD Phase 1 - SAGD Detailed Engineering Work (Feb 2004 - Sept 2004)
Carried out equipment sizing, package specification, line sizing, PSV sizing, and design calculations related to the production treating train for a commercial Oil Sands facility focusing on the Vapor Recovery Unit (VRU) and Slop Oil Treating systems. Created PFDs and P&IDs. Participated in HAZOP review meetings with the client, operations personnel and vendors.
* Bantrel: Intermediate Process Engineer - Sept 2003 to Feb 2004
EnCana Foster Creek SAGD Phase 2 - Performed Value Engineering Studies related to the Conceptual Engineering work in an attempt to optimize the design and lower the capital costs prior to proceeding with the Detailed Engineering work.
* Japan Canada Oil Sands (JACOS): Intermediate Process Engineer - June 2002 to Sept 2003
SAGD Commercial Facility - Oil Sands Thermal Recovery
Involved in the conceptual design of a SAGD Commercial Facility for Japan Canada Oil Sand. Simulated the complete process using HYSYS, conducted process studies, optimized heat recovery / heat integration within the plant, prepared PFDs and P&IDs, compiled heat and material balances, sized related equipment (exchangers, tanks, pumps, vessels, compressors, etc), evaluated capital and operating costs, assisted with the compilation of the commercial cost estimate, and participated in HAZOP reviews. I also carried out tasks related to upgrading the existing Pilot Facility.
* Alberta Energy Company (AEC): Intermediate Process Engineer - February 2001 to May 2002
a) SAGD Commercial Facility - Oil Sands Thermal Recovery (August 2001 - May 2002)
Process Engineer in charge of the preliminary Design and Optimization of the second phase of a large scale commercial SAGD project (FEED). Extensively utilized HYSYS to perform process optimization and feasibility studies and evaluate heat recovery and heat integration options. Conducted Front End Engineering Design (FEED) work; prepared PFDs, P&IDs, and heat and material balances; completed equipment cost estimates and economic evaluations; assisted in the compilation of the Design Basis Memorandum (DBM), Basic Engineering Data and the Equipment Specifications. Evaluated surplus equipment (pumps, vessels, tanks) and performed hydraulics calculations.
b) VAPEX Pilot Facility Design - Enhanced Heavy Oil Recovery (Feb 2001 - August 2001)
For this project I worked along side the Reservoir Specialist in the development of a Pilot Facility that would pioneer the VAPEX (VAPor EXtraction) heavy oil recovery process. This process employed the injection of a chemical solvent into the reservoir to interact with / dilute the Bitumen and result in a free flowing product which could be extracted. I modeled the complete process on HYSYS and was involved in interviewing potential engineering companies to oversee the detailed engineering and construction work. Performed site visits and coordinated the pilot work with field operations.
* Alberta Energy Company: Intermediate Process Engineer - May 2000 to February 2001
Heavy Oil Battery Upgrades / Zero Emissions
Involved in the expansion of a heavy oil battery which included the implementation of the new Zero Emissions environmental policy (collection of all produced vapors) and involved the addition of sour gas treating and gas compression equipment. Simulated the process using HYSYS, evaluated capital and operated costs, sized equipment (exchangers, tanks, pumps, vessels, compressors, etc), performed hydraulics evaluations, prepared PFDs and P&IDs, and participated in HAZOP reviews.
* Macdonald Engineering Group: Process / Mechanical / Project Engineer - Nov 1995 to March 2000
a) Suncor Energy Incorporated - SAGD Commercial Facility - Oil Sands Thermal Recovery (June 1998 – Mar 2000)
Functioned as an Intermediate Process Engineer for the Front End Design of the Firebag Phase I Commercial SAGD facility. Simulated the complete process and performed design and feasibility studies using HYSYS, STX, and ACX. Optimized heat recovery and heat integration. Prepared PFDs, P&IDs, and heat and material balances. Studied the option of steam generation with power co-generation. Specified equipment and assisted in the compilation of the project cost estimate. Compiled all related design notes, process calculations and study reports.
b) Gulf Canada Heavy Oil - Satellite & Battery Design (Oct 1997 - June 1998)
Employed as a Mechanical / Process Engineer to configure the piping gathering system for a multi-well / multi-satellite system and aid in the design of the Battery (storage) facility. Configured the layout for the well flowlines and group satellite lines. Analyzed the flowline and gathering system hydraulics (single / multiphase) using Pipeflo. Performed process analysis and optimization relating to condensate recovery using Hysim. Specified and evaluated pumps, tanks, heat exchangers, utility systems, and flare systems. Prepared and issued RFQ's (requests for quotation) and PO's (purchase orders).
c) Unocal Canada - Water Injection Facility / Gas Well Gathering System (Aug 1996 - Oct 1997)
Husky Oil - LACT Metering Skid Addition / Gas Well Tie-ins (Nov 1995 - Aug 1996)
For these two projects I was the designated Project Engineer. I outlined the project schedule, specified and purchased all equipment, monitored all related project costs, prepared the required permit applications, developed PFDs and P&IDs, performed hydraulics analysis, system optimization and production forecasting.
EDUCATION
1993 M. Sc., Mechanical Engineering - Heat Transfer and Fluid Dynamics - Numerical / Experimental - University of Saskatchewan, Saskatoon, Saskatchewan, Canada
1990 B. Eng., Mechanical Engineering - Graduated with Great Distinction (Highest Honors Possible) - University of Saskatchewan, Saskatoon, Saskatchewan, Canada
Additional Courses
1999 ISO 9000 - Internal Quality System Auditor Training Course
1998 Natural Gas Processing Technology (Graduate Level - Dept. of Chemical Engineering - University of Calgary)
TECHNICAL SKILLS
Computer Skills: MS Project; Word; Excel; Outlook; Access; PowerPoint, AutoCAD, Programming in VisualBasic
Process Analysis / Hydraulics: Extensive Knowledge of HYSYS Steady State, HYSYS Dynamics, STX, ACX, Pipeflo, Wellflo, Heat Integration & Optimization
ADDITIONAL EXPERIENCE (details available upon request)
1. Graduate Student – Heat Transfer and Fluid Dynamics in Porous Media (Numerical / Experimental) - University of Saskatchewan, Saskatoon, SK, Canada (Sept 1990 - Nov 1993)
2. Heat Transfer Engineer - Heat Transfer and Fluid Dynamics associated with Multiphase Flow - Canadian Space Agency, Saskatoon, SK, Canada (Sept 1990 - Nov 1991 part-time)
3. Microgravity Research Engineer – Microgravity Platform / Experimental Design & Testing - Canadian Space Agency, Saskatoon, SK, Canada (Sept 1989 - May 1991 part-time)
4. Aerodynamics Research Assistant - Wind Tunnel Vehicle Aerodynamic Research - Vehicle Research Division, University of Saskatchewan, Saskatoon, SK, Canada (May 1989 - Sept 1989)
SCHOLARSHIPS AND AWARDS
1990-92 NSERC Graduate Student Research Award ($30,000 Can)
1989 NSERC Undergraduate Student Research Award ($1500 Can)
1989,88,87 University of Saskatchewan Undergraduate Scholarships ($1200 Can Each)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 651 to 700 of 9905)
Go to Search Parameters...
Brief Description
Outstanding background of knowledge’s into oil and gas processing and utilities, more then 14 years experience into commissioning and process activities from which more than three years offshore, working into an multicultural team and with all disciplines engineers, proactive and disciplined
An engineer with experience in all areas of pump manufacturing
Installation, commissioning, testing & operation of transformers, Power Control Centre, Machine Control Centre Panels
M.Sc with 15 years Laboratory experience in Analytical Lab.
About 25 years of Process Engineering experience including fifteen years with EPC companies in the Arabian Gulf states in the Oil & Gas industry.
An innovative and seasoned Marketing professional with expertise in consultative sales and marketing, strategic planning, brand management, market research, sourcing, procurement, supply chain and logistics, and with 20 years of successful progressive experience in all phases of market consulting.
Project management. Construction management.
Diploma Electrical Engineer with 13 years of experience in the field detailed engineering, project designing, etc.
Dear Sir, I have 21 yrs Exp in a petroleum laboratory as a Sr lab Chemist having knowledge of testing all petroleum products, petrochemicals based on ASTM/IP/BIS methods, handling auto instruments aware about fire and safety rules and regulations.
Sr. Rotating Equipment Engineer with 20years experience in Turbo-compressors up to 42 MW rating of Refinery, Petrochemicals & Ammonia Plants. In depth experience in troubleshooting, maintenance/major overhauling/modifications, failure analysis, condition monitoring and vibration analysis
Backround in Electrical Engineering/Design with emphasis of Project Management, Production/Manufacturing with more than 15 years experience in Electrical Design/Construction work and familiar with Standards Procedures as well as with the Industry standards such as ANSI, API, NEC, etc
I know that I live not very close to your center and hence I would like to balance this negative point so I will be more than happy to pay my air fares in case I meet the criteria for an interview. Currently, I work as a lecturer at the dept. of Natural resources in Krete University.
Application for the Post of " Oil Rig Doctor " (Medical Officer/ Doctor/ Occupational Health Consultant / QHSE Rep./ Medical Advisor). (With On & Off Rotation Duty Cycle). (Offshore &/or Onshore).
To find a progressive and challenging position in the integrated environment of Instrument & Control and Industrial IT. That would use my skills & capabilities and help develop my career.
Sixteen (16) year experience in Venezuelan and international Oil Industry at Pre-commissioning, Commissioning & Operations of units, involving following areas: Oil, Gas and Multi-product Pipelines. Production: Free water knock out, Thermomecanicals treaters, Gas Heaters, Gas Lifting, Natural flow w
Petrochemical Engineer seeks challenging assignment in Gulf
Am an Diploma Engineer with 17 years of field experience and presently working as 'Senior Electrical Technician' in the Maintenance Team (off shore) with M/s. BUNDUQ Company Ltd.,(Adnoc group) a Japanese Mitsui and British Petroleum joint venture OIL & GAS producing company
Over 20 years experience in LNG and Oil Refinery /Panel/Plant-Operator/Supervisor
I am 15 years experienced NDT Inspector, worked in India, Middle East, European countries. Have worked in NDT/Quality Control Inspection of fabrication & erection of Oil Field Installations/Off Shore jackets, Platforms, Piping, Sub marine Pipelines, Risers, Crude Oil Storage Tanks, Pressure Vessels,
Has over 17 Year experience in Refinery, Petrochemical, Onshore, offshore oil & gas facilities. Responsibilities have included Piping Design, Leading group of people in day to day job in Project management, Technical assistance. I was solely responsible for all the piping activities.
16+ years of exp in project (EPC) execution (planning/detail engg / procurement/construction) for onshore plants (refinery & petro chem), Now working for ExxonMobil at Singapore refinery projects.
Thorough knowledge in Primavera, MS Project, MS Office & EVMS
Senior Piping Engineer for LNG Plant, Petrochemical Plant, Gas Plant, Refinery Plant, Cryogenic Plant and Geothermal Plant.
25 years experience in LNG/Refinery plant/panel operations/commissioning
I have done PG in Chemistry with post Graduate in industrial safety from India and also completed NEBOSH - General Certificate from UK
I have 15 years Lab experience such as 6 years of LNG plants, 7 years of Refineries and 3 years of Aromatic and PTA plant Labs experience with 5 new labs commissioned experience. I have a good knowledge regarding the dosing of corrosion inhibitor at wells side. I can conduct Oil & Gas analysis.
TQM facilitator & instructor /Lead teams to resolve to improve process/ 4 yrs offshore Maintenance Supervisor /2yrs manager offshores field/ 4yrs CMSM coordinator/6 yrs contol management stocks
Field Acquisition QC. Over 20 Years experience in Land Seismic. 3D Design by OMNI and MESA. Field processing of 2D/3D land seismic data (MicroMax,ProMax, VISTA, APEX) . Creating and verification of SPS files. Static correction.
Working as In charge OIL/GAS LABORATORY TESTING OF LPG/C2C3/NAPHTHA/OIL ETC. PROCUREMENT/CALIBRATION/MAINTENANCE OF EQUIPMENTS
OBJECTIVE: Add value by leading people and projects, solving problems, bringing order from chaos, turning dysfunction into productivity, in a petroleum exploration or development geology management position.
20 years experience in major integrated national oil company of India. Experience in production operations, process development, enhnaced oil recovery projects and research work related various operations of the company.
Contracts Int. Experience in Construction, Management and Administration (EPC), Materials Manager (PMC), Materials Control, Procurement & Expeditor; Fluent in English, conversational in French, Russian. Seeking to continue professional career effectively utilizing my skills and gained experience.
More than(18) years in piping design & construction. Specialize in stress analysis of piping system using Caesar 11. Worked in oil refineries, onshore & offshore, gas plant & petrochemicals e.g. Saudi Aramco & Saudi Basic Petrochemicals ,Petromin Shell & Jeddah Oil Refinery.
Process engineering.
Mechanical Engineer
Working as Lead maintenance Technician in Oman polypropylene LLC, is a subsidiary of Oman Oil Company, Sohar, Oman. Involved in SAT (site acceptance test) in DCS, ESD system, FSC system, F&G system, Radio system, Metering station, Field instruments and DG set.
I have over 10 years experience in chemical and process engineering, with an additional 5 years experience supervising construction in the petrochemical industry. I am well versed in the areas of chemical plant design and construction as well as document issues in conjunction with detail design
Ensure all plant/equipment/tools/materials are fit for use, and comply with the HS&E Management Plan, with regard to certification, permits and colour codes.
13 years exp in epc projects
A comprehensive background in Oil & Gas, Structural Fabrication & Welding Techniques coupled with the duties of an Inspector / Quality controller / Supervisor since 1993. Able to motivate & co-ordinate other personnel into achieving quality accepted targets& liaise with clients & their representati
A four your degree holder with one year Shift Supervisor Process (SSP) and six years as a Control Room Operator on Shell Bonga offshore FPSO.Have various oil and gas experience offshore, swamp and land facilities.
More than 10 years’ experience of coordinating structural projects and technology development acquired during the Master and Doctor Courses in Civil Engineering and working as engineer in construction, aerospace, offshore and onshore industries.
Working as a Rotating Machinery Specialist with specialist skills in machinery Componenant condition monitoring by Vibration analysis (CSI RBMware), Bentley Nevada DM2000 online monitoring system, Adre data collection, Flexware performance analysis, Ultrasonic check by CSI sonic scan and etc.
Strengths: detail oriented, flexible, analytical, self-motivated, adaptable, effective communicator and articulate. Experience in field drilling operation management with extensive hands-on technical, administrative and managerial functions; drilling technology assessment & implementation, contract
Master degree in Welding.Inspection engineer experienced in Oil abnd Gas industry
Lead Process Engineer for Oil& gas Offshore/Onshore projects for Conceptual, Basic /FEED and Detail Engineering, Optimization and De-bottlenecking
I have a total of 13 years of experience working as an Engineer in the Petroleum Industry. For the last 10 years I have been working as a Process Engineer handling all aspects from Conceptual Engineering through to the Detailed Engineering Phase. I am seeking work as a Senior Process Engineer.
Involved in commissioning and pre-commissioning activities.
I am having 14 years of experience in Instrumentation design, construction and commissioning activities in the field of refineries, fertilizer units and Oil & Gas. From last three and half years I am working in Nigeria for major oil & gas giants like SHELL, TOTAL, AGIP and EXXON MOBIL for their upst
Having 15 years Experience in Instrumentation and Control in Oil & Gas, Refineries (FCCU, CDU units), NGL Plant, Gas plant,LNG plant and Petrochemical Plants, Pox Unit, Process gas compressors, Gas Turbine generator (GTG) Units. Work Exposure of Performing safety critical, Operatability critical pr
First
1
2
3
4
5
6
7
8
9
10
11
12
13
[ 14 ]
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com