Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #2856 next resume »»
CONTACT INFORMATION:
View contact information...

Summary of Qualifications: Certified ( Project Controls, AACE, #1366), published Engineer (BSPE and MBA) with over 15 years of direct field experience in Operations, budget design, Inventory control, Drilling Engineering, Well design and Turnkey Bid estimates Work experience in the North Sea, Middle East (well fires and new wells), North and West Africa and Indonesia and South Texas. Land Rig experience on shallow to 25,000 ft wells from Roustabout to Engineer level. Offshore experience on Jack-Ups and Tender Rigs, working on High Pressure, new exploration and work over projects. Experienced in drill pipe fatigue analysis, bit selection and drilling fluid design for limestone, abrasive sands and shale. Experienced in cementing, casing cutting and extraction applications. Assisted on the design and drilling of eight well plans in Indonesia. Experienced Estimator, Project Scheduler, Budgeting and Risk Analysis ( Monte Carlo and all Forecasting models). Computer skills: all standard word processing, spreadsheet

Career Contributions:
Pride Drilling, Balikpapan, Indonesia Sept. 2000 ¡V July, 2001
Senior Drilling Engineer working on the UNOCAL contract. Asked to work between UNOCAL and Pride Drilling to suggest improvements in performance and production methods. Created production history statistics and provided drilling recommendations on medium depth off shore directional wells. Created Cost / Benefit studies on Equipment Procurement using Monte Carlo Simulation and Probability Analysis. Created an Inventory Database (MS Access) for a $1.4 million offshore inventory. Assisted on 14 wells, both new exploration and work over projects.

Santa Fe Drilling, Aberdeen, Scotland and Kuwait Oct. 1999 ¡V July, 2000
Consultant in Organizational Development and Project Management Methods. Achievements include:
* Instructed Kuwait Rig Managers on better methods of Rig budget development and cost tracking.
* Developed a 260 activity construction schedule for a new land rig in Saudi Arabia (Rig 157)
* Assisted in implementing the Santa Fe computer warehouse system on Kuwait land rigs.
* Instructed office staff in computer, management and business concepts.

Kvaerner Consulting, Houston, Texas Jan. 1999 ¡V July, 1999
Project Controls Planner / Supervisor for the CHEVRON LL-652 projects on two of five offshore installations (Water Injection and the Central Production Platforms) being built for Lake Maracaibo, Venezuela. Hired at 50 % project completion to assist in a better project finish. Project value was $140 million. Duties included verification of the sub contractor's schedules, determining current costs and advising Project Management, both Chevron and the Contractors, of potential delays and projected costs to complete. Achievements:
* Helped recover two months of production time on the CPP by creating earned value cost measures, by effectively monitoring the project critical path and by informing Project Management of problems.
* Forecast cost to complete on both units to within 1 % of the final man hour total ¡V 640,000 hrs. / 760,000 hrs.

Santa Fe Drilling, Aberdeen, Scotland (Contract) Nov.1998 ¡V Jan. 1999
Developed an in-house training program of project management methods to cut cost and increase operating efficiency.

Smith GeoDiamond, Houston, Texas April, 1998 ¡V July, 1998
Technical Engineer who recommended and evaluated PDC Bit performances and failures. Recommended bit running and hole cleaning procedures. Evaluated cost per foot of programs. Well site evaluation of Bi-Center Bits.

Well site Supervisor OGCI, Houston, Texas Oct. 1997 ¡V Nov.1997
Relief Well Site Supervisor on a 16200 ft., $ 3 million dollar High Temperature exploration well in South Texas. In charge of all logistical arrangements and supervision of the Drilling Plan, onsite staff and the contracted 2500 HP Rig, ( over 100 staff). Supervised the well abandonment, which required six balanced plugs, casing cutting, casing extraction and site restoration.

Project Controls Engineer, MODEC (USA), Houston, Texas July, 1997 ¡VSept., 1997
Hired as the third Project Planner/Scheduler on a Marathon Oil Company project, which involved converting a Mat Rig to a Mobile Offshore Production Unit (MOPU). Monitored the existing schedule by frequent rig inspections. Worked with TDI Halter staff on methods to improve performance. Predicted cost overages and production problems for management. All work done on Primavera software.

FORTNEY TECHNICAL CONSULTING 1984 - 85,1987 - 90 then April, 1992- April, 1997
Drilling Engineer, Cost Engineer, Organizational Specialist who develops business plans, teaches management concepts and computer applications. Consultant to the Regional Vice-presidents of Santa Fe Drilling, North Sea and Santa Fe Drilling, Africa as well as to the Executive vice-president of Stockmar Corporation, a $50 million oil refinery maintenance and construction corporation in four states. Other Clients: Western Leisure Travel, Salt Lake City, Utah; Brier Travel, San Francisco, California; Tauck Tours, Westport, Connecticut.
ACHIEVEMENTS
„XMember of an Estimating Team creating a Bid Package for a 12 well Turnkey Project for CORPOVEN of Venezuela and for Santa Fe Drilling, Venezuela. Responsibilities included evaluating submitted bid packages of all firms in the Drilling Fluids, Solids Control and Environmental Equipment, Casing Running and Hanging Equipment and Material Transportation areas. Total cost estimates were over $10 million dollars and required evaluating submitted bids from Subcontractors against well requirements by comparing the bid to a self-designed model and considered the following Engineering areas:
„ÏQuantity and type of Drilling Fluids material needed for effective well control and optimal Hydraulics for the type of Rigs that would be used on the wells.
„ÏSolids Control Equipment by type that the wells would require and a projected number of Shaker Screens.
„ÏCasing Design and estimated Casing Running Times as submitted by Weatherford, the only bidder. Worked with Weatherford staff on improving their submitted bid.
„ÏTranslated documents submitted in Spanish to English for the bid process.

Other Work Achievements:
* Cost Engineered study justifying computer installation in NIGERIA by measuring completion times of manual job tasks against the same tasks done on computer and establishing a least cost scenario.
* Instructor in Budget Management and Cost Forecasting, Leadership, Management Skills and Time Management methods for 12 Rig Superintendents in the UK and Nigeria.
* Statistical Well Analysis (8 wells) developed for Gulf Oil, Nigeria involving Casing Setting, Trip times,
Nipple Up and Nipple Down times. Process involved complete analysis of all IA DC reports.
* Project Management and Cost Estimation training given to offshore Rig Staff including Toolpushers, OIM;s and Drillers in the North Sea. The Teaching Process involved living on the Rigs and coaching the staff while they were at work and suggesting alternatives to non-productive work styles.
* Operating experience with Shell, BP and Texaco drilling procedures by coaching Rig Managers the best way to plan work to forecast materials and well requirements specified by each Companies Well Plan.
* Operating experience with HPHT wells in the North Sea's ERSKINE field. Received HPHT Well Control training from Charles Prentice, Texaco HPHT Specialist.
* Developed current cost tracking methods for firm price work in Industrial areas.
* Assisted in lowering NPT on Shell Southern North Sea gas well from 24 % to 7 %. (14.4% cumulative)
(This result was obtained by living offshore on the Rig and working with Santa Fe Rig Managers and Shell
Engineers in eliminating conflict and establishing Well Plan compliance by assigning Risk Values to each Area of the Well Plan and determining methods to prevent downtime. The combined Shell / Santa Fe group cut the Non
Productive Time average of approximately 32 days on the three previous wells to a total of four days on the forth well at the end of the Drilling Phase. )
* Conflict resolution assistance with British Gas. Worked with Santa Fe staffs to better communicate with British Gas Engineers by identifying and eliminating conflict areas, in both personal and production areas.
* Well Plan designed for NIGUS Corporation, Lagos, Nigeria at Santa Fe request. (well not drilled)
The project involved creating the following: an initial Fracture Gradient, an estimated Drilling Curve based on the nearest offset wells, an estimation of required Drilling Fluids and Shale Inhibitors for use with Sloughing Shale, a Casing Plan based on the target zone's estimated Burst / Collapse profile, the type and number of Drilling Bits based on offset histories, a projection of Wire line requirements and final Perforation considerations.

SANTA FE DRILLING CO., KUWAIT March, 1991 - April, 1992
To enhance field experience, worked as a Assistant Driller / Driller on L.C. Moore and Dreco Rigs producing medium depth wells. Supervised an Egyptian and Filipino crew on six wells and was trained from Roustabout to relief Driller/Driller levels. Assisted in location layouts, tubular inspections, tool inspections and compliance with the well plan. Work experience on L.C. Moore 3000 HP Rigs and Dreco Retractable Derrick Rigs.

ACHIEVEMENTS
* Monitored 600 bbl to 1000 bbl mud systems and ensured that the Drilling Fluids complied to the in-frequent visits of the Drilling Fluids Engineer. Trained in performing all necessary mud tests.
* Worked with the RED ADAIR COMP. fighting Kuwait oil well fires and an OG & E Engineer on wellhead repair.
* Assisted with rig move from the SULTANATE OF OMAN to KUWAIT by disassembling the rig and listing the rig components for Customs use.
* Prepared CAD designs for both location layouts and mudflow systems of four L.C. Moore and Dreco units.
E.F. Brady, Co. San Diego, Ca.,December, 1985 - April, 1987
Production Analyst for the Los Angeles division of a high rise commercial construction company. Reported to the General Manager and implemented and analyzed result of productivity improvement projects on $500,000 to $3 million dollar projects in greater Los Angeles. Monitored production on 22 commercial properties. Helped realize a $ 1 million dollar net profit after a previous fiscal year loss..
ACHIEVEMENTS
* Introduced Regression Analysis cost studies covering both time delays and projected costs to complete.
* Introduced project scheduling (GANTT, PERT) with TIMELINE, a computer Project Management program.
* Assisted in lowering budget hour overage of all projects from a +50% to budget adherence.
* Trained Project Foremen on using Project Schedules to better forecast manpower and material needs

LORBER AND ASSOCIATES,Orange,CA 1981 - 1984
Consultant to Santa Fe Drilling Co., London, England and C. F. Braun Engineering, Alhambra, Ca. Developed production measures for staff use in LIBYA, ANGOLA, NIGERIA and CAMEROON in Drilling, Accounts and the Warehouse Departments and created Job Descriptions for the Personnel Department. Consultant in MATRIX
MANAGEMENT concepts. Mr. Lorber authored PUTTING THE ONE MINUTE MANAGER TO WORK with Ken Blanchard
ACHIEVEMENTS
* Assisted in developing a program to reduce LIBYA turnover by 40%.
* Assisted in designing Accounting work schedules in LIBYA and NIGERIA that achieved a 200% improvement in task completion dates.
* Realigned NIGERIA Warehouse procedures (3 1/2 million dollar inventory) and established a receiving record.
* Assisted with Santa Fe first: a Regional Drilling Performance History encompassing all drilling performance, cost and production time variables.
At C.F. Braun, an Engineering Design Company with a MATRIX MANAGEMENT format, assisted the project manager in implementing PROJECT CONTROLS goals and objectives on the KUWAIT NATIONAL PETROLEUM REFINERY. (17 units.) Project involved working with Quality, Scheduling, Cost Engineering and Estimating Depts. Assisted in Conflict Resolution Weekend involving Braun Project Engineers and the Kuwait Project Group
.Helped attain a 6% under budget result on the CRUDE UNIT design.

PUBLICATIONS "Toolpusher is Key to Rig Efficiency", PETROLEUM ENGINEER INTERNATIONAL, Sept., 1983.

LANGUAGES Very Good in SPANISH, Conversant in GERMAN, Read/Write in French.

EDUCATION

Master Business Administration in International Management), American Graduate School of Intl. Mgmt., Glendale, Ariz. (Thunderbird Campus), 1980, Studies in: Advanced Market Research Methods, Finance and Multi-national Business Organization Planning
Bachelor of Science in Petroleum Engineering, (B.S.P.E.), 1990, University of Oklahoma, Norman, Ok. Studies in: Advanced Drilling Engineering, Production, Waterflooding and Well Logging Methods, Drilling and Production Laboratory.

Other: Master of Arts, (M. A.), 1973, B.A., 1970, Northern Arizona University, Flagstaff, Arizona, English Literature
MBA program, Heriot Watt University, Edinburgh, Scotland: Decision Making Techniques, Organizational Behavior, Strategies for Change, Quantitative Methods, Strategic Planning,

Other training includes: Smith Bit Company Hydraulics, M-I Drilling Fluids, Advanced Well Control,
Offshore Survival (R.G.I.T. 5 day course, Aberdeen), Hydrogen Sulfide Survival, SCR systems, Caterpillar Preventative Maintenance, Santa Fe Warehousing methods, BOP systems, and Mud Pump Maintenance. Drilling Fluids (Baker Hughes ¡V 5 day course), Performance Drilling (Directional, BHA's, Fluids, Bit Selection ¡V 5 days), Smith Bits Hydraulics and Bits, Well Testing / Transient Analysis, Advanced Well Control, Advanced Project Management, Abnormal Pressure Seminar (AADE - 1 day), Stochastic Reservoir Modeling, (GeoMath ¡V Houston, 1 day), HP/HT situations, RGIT (Aberdeen) offshore survival certification, H2S, BOP systems, SCR systems, Stochastic Modeling.

Computer skills:

ALL standard word processing, spreadsheet, graphics, database and scheduling programs.. (Primavera).

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1801 to 1850 of 10182)Go to Search Parameters...
Brief Description
Project Planner/Scheduler (Primavera P3 & MS Project Planning Software, MS Word / Excel). Vast experience in Steel Works Business - Planning, Fabrication / Erection (Storage Tanks & Steel Structures), Gas Plant / Pipelines. Completed Structural Engineering and 4 years in BS Mech'l Engineering.
Water well driling and development specialist.
Maintenance supervisor / Reliability specialist / Project Management
Broad base of experience within the Pulp/Paper, Pharmaceutical/Chemical and Bio-Technology industries involving design, engineering, construction, and commissioning. Management of projects (automation, instrumentation and electrical/instrumentation systems), quality, personnel and resources.
Developing & producing plot plans using PDMS 11.2 (CLS), pipe modelling (PDMS-PMS), Equipment modelling (PDMS-EMS), producing Piping Study & General Arrangement Drawings(PDMS-CAST), Producing Isometrics(Isodraft) & used Review Reality station for reviewing the plant model.
Certified ( Project Controls, AACE, #1366), published Engineer (BSPE and MBA) with over 15 years of direct field experience in Operations, budget design, Inventory control, Drilling Engineering, Oil Well Fire Control, Well design and Turnkey Bid estimates.
Education: Master in Chemistry Various certifications on Drilling Technology and Oil and Gas operations. Worked as Mud Engineer with MI Overseas. BakerHughes INREQ and IDF schlumberger in middle east. Worked as lab chemist with QGPC Qater, Mud Engineer with ADC Saudi Arabia ETC
Pr. Management-Estimating man hours, developing WBS CBS, Progress measurement techniques, monitoring by Primavera, project control, invoicing. Engineering-Prep. basic Instr data sheet, detailed ENGINEERING of DCS, FGS, SDS, control logic, SAFE. Commissioning -Elect system of process platforms
Senior Drilling Supervisor for 12 years. 19 years in oil industry. •Enthusiastic, determined, adaptable and focused with a good sense of humor. •Excellent management and team working skills, experienced in a wide range of cultures and environments.
I am experienced in long & short range mine planning, scheduling, budgeting, design of safety procedures & standards, production & destress blasting, mine backfill, ventilation, ground control, geomechanics modeling & design of stable openings (using the bifurcation theory in mechanics).
Offshore surveyor with geophysics experience
Radio Operator/Offshore Logistic Planner/Heli-admin
I have attained 17 plus years of field technical service in the Oil Refining, Petrochemical, & Refrigerations fields. I wish to utilize this experience, for advancement of my career, with a successful minded firm.
With more than ten years of working in different scope of manufacturing plants in the field of Quality and Safety, i am deeply qualified to your employment requirement. I am also a computer knowledgeable person. I can work also with different nationals in one company. Thank you very much.
I have worked in the Middle East for the past 16 years my last position was working for Canadian Nexen on their Oil Storage Export Terminal in the Republic of Yemen during my employment with Nexen I held various positions I started as Mechanical Technician.
Estimation Engineer - Instrumentation.
QA/QC professional experience in management, inspection, and a highly developed working knowledge in construction environments gained over more than 10 years of Oil/ gas plants, Petrochemical plants, Oil Refineries, Plant producing Facilities, pipe lines, Storage tanks, Reservo
MBA +9 yrs experience in materail managment
I am having Eleven years of experience in field of Electrical Engineering as a Planning & Estimation Engineer. I am looking for a challenging opportunity in field of Project planning.
Chemical Engineer with 11 years of experience in Project Engineering & Management in Chemical, Petrochemical, Refinery & Oil & Gas sectors.
working as senior production trainer refinery at petrosa south africa. was shift supervisor commissioned 3 refinery units from scratch as shift supervisor, see resume
Diploma obtained after 03years of technical school since 1972 to 1975 brevet of technical school.
Performing work as per international standards following operational excellence management system
To obtain a job in the in the Oil and Gas Industry that will challenge my abilities.
Mechanical Engineer Bsc. Hons. Project Engineer. Commissioning Engineer
•Experienced in sizing of process equipments •Experienced in using process simulation HYSYS, Pipeflo and Flarenet softwares• Expert in preparing process documents/drawings i.e.PFD’s and Data sheets•Familiar with ASME/ANSI codes, ASTM and API standards
I,m familiar to operate with various analytical Instruments Laboratory such as Gas Chromatograph, AAS, Spectrophotometer (Visible, UV,IR) , bomb calorimeter, viscosity meter, flash point meter, pH meter, turbidity meter, conductivity meter, glass ware apparatus for titrimetric method.
I am diploma engr in mech. engg. having 18 years expr. in maint. of process plnat equipment
Certified Rigger
Experienced Chemical/Process Engineer (over 9 yrs experience). Petroleum refining, Liquefied natural gas (LNG) production and gas processing, process design, Offshore oil and gas platform deisgn (topsides), process simulations (Hysys), conceptual process design, detailed process design, Training.
Coil Tubing , 18 yrs worldwide, Coordinator, CT Drilling Systems, Project Engineering/Manager
12 + YEARS OF EXPERIENCE IN BOILER, BOILER AUXILIARIES - DESIGN AND DETAIL ENGINEERING
SUMMARY: Health, Safety and Environmental Management Professional seeking a challenging position in an established and dynamic organization. With about 8 years experience with the oil and Gas industry and with good Experiences in Environmental management, project management, Regulatory compliance
Senior Structural Engineer with 12 years experience in offshore structural engineering. Able to lead, forecast and allocate structural engineering resources and possesses conceptual to detailed design experiences in brown and green field projects.
12 years of expereience in medical emergencies,7 years expereience as offshore rig medic, 2 years as trainee HSE
Can setup run &standardise petroleu testing lab. Familiar with all petrleum product testings, full acquainted with ISO-9002 Quality assurance system & with MS Office & email/internet applications. Accredited as Petroleum Inspector from IFIA, UK. Neatness, accuracy, thoroughness in work
I am experienced in Air separation Units (Oxygen plants, Nitrogen plants, Argon plants) and Carbon dioxide plants. I am a plant manager and looking after all the activities involving in mafucturing and selling
I have over ten (10) years of diversified experience in Planning & Scheduling, site supervisory ,quality control and other related engineering job on EPIC projects including Structural, process mechanical, mechanical piping, electrical, instrumentation, telecommunication and fire & gas systems.
I am Diploma Engineer in electrical and post diploma holder in Instrumentataion & control having 28 years experience in petro chemical, Heavy chemical , Oil & gas industries in a diffr\erent position in project, maintenance of instrumentation.
Management of chemical lab with water and oil analysis/testing
My research is mainly about modeling
Considerable expertise in dealing with corrosion control of oil and gas installations, resulting from over twenty years of relevant experience in upstream, midstream and downstream activities in oil and gas industry.
With very strong drilling background, I will be competent for any drilling related job assigned
To secure a Senior Contracts/Management related position within an internationally focused organization servicing the petroleum, mining, construction or telecommunications industry utilizing my negotiation, management and administration skills.
Project Execution of EHVAC and HVDC Electrical Power Transmission as EPC contractor having direct experience of Engineering, Project Management, Procurement, Installation and Commissioning of Indian and Overseas projects.
Welding Technologies, Technical assistance, Workshop, site, AutoCAD, Tekla Structures, XSteel, SolidWorks, MS Project
Experienced Instrumentation & Control system Engineer, interest in Projects, Proposals and Commissioning
Operates processes in the plant and handled control room DCS or PLC, mostly equipment such waste gas treatment plant, waste water treatment plant, chiller, air compressor, kneader, calciner, cooling tower, furnace and knowledge in the tank farm activities, some analysis required in the process
Control Room Operator (DCS)Honeywell Chief Operator/Step-up Chief Operator Honeywell TDC2000/3000/Plantscape Refinery Unit Trainer - Classroom/OJT Technical Writer/Author (Procedures) Refinery Unit Start-up/Shut Down Commission New Equipment/Processes Precommissioning Coordinator Safety
Dear Sir/Madam: My goal is to obtain a entry level position in a drilling crew in offshore, anywhere around the world.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   [ 37 ]   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com