Feb 2005- Till Date C
airn Energy PLC, Edinburgh, UK

Group Projects Engineer
Group Technical Engineering & Operations Department
Cairn Energy PLC (Head office)
Edinburgh, Scotland, UNITED KINGDOM

Responsibilities:
* Prepare, Review Field Development Plan for Company developing assets.
* Deal with respective JV's of various operating assets and organize Technical Committee meetings.
* Prepare development cost estimates and budget.
* Responsible for project conceptualization & Front end Engineering & of Developing Assets.
* Responsible for Detailed Engineering of Development Project.
* Responsible for Development Project Implementation, Management, Construction & Commissioning.
* Review assets annual budget for board approval.
* Responsible for Technical Integrity of operating assets of company in India and Bangladesh.

Projects:
* Rajasthan Field Development in India. Involved in Field development Plan preparation and Front End Engineering being carried out by MEG Worley in Calgary Canada. ( Total Estimated Development cost of Phase-I is approximately $ 1.2 Billion)
* Rajasthan Southern Field Development (Rageshwari & Saraswati) on Fast track basis- First Oil by Q3 2006.
* Heading the Technical Integrity Audit of Sangu Gas Filed in Bangladesh.
* De-bottlenecking of Ravva Oil & Gas Field to sustain the production plateau of 50,000 BOPD.

March 2004-Jan 2005
Cairn Energy India Pty Limited

Sr. Manager-Projects
Water Injection Pilot Project ($ 10 million)
Rajasthan Block- RJ-ON-90/1. INDIA

Job Description: Responsible for Project conceptualization, Front End Engineering, Detailed Engineering, Managing Installation Contract, Tender specification & document preparation, Installation Contracts review, evaluation and award, Review of design documents generated by consultants, Tender evaluation, Project management, preparation of monthly report for management, Conduct progress review meetings and manage project management team.

Main Projects Component:
- Water well drilling, completion& Testing
- Completion of Deep Wells as Injectors and Observation Wells
- Development of Surface Water Injection Facility
- Injectivity & Interference Study

Objectives of Project:
- To establish the Injectivity and conductivity of Fatehgarh reservoir with an objective of pressure maintenance across the Mangala/NA fields
- Establish surface facilities design parameters, and injection water quality and compatibility with formation water.
- Deepwater Thumbli aquifer deliverability studies with respect to sustained water production requirements, once the production starts
- Study the Interference/effect on shallow fresh water aquifer with respect to water production from deepwater aquifer.
- To collect uncontaminated water sample from Thumbli and Fatehgarh aquifers through deep wells.

October 2002- March 2004
Cairn Energy India Pty Limited

Manager-Projects
Gauri Gas Field Development ($ 31 million),
Suvali, Surat, India.

Job Description: Responsible for Project conceptualization, Front End Engineering, Managing Detailed Engineering, Managing EPIC Contract, Tender specification & document preparation, Review of design documents generated by consultants, Engineering, Tender evaluation, Project management, preparation of monthly report for management, Conduct progress review meetings and manage project management team.

Main Projects Component:
- 4 legged Jacket
- Top Side with Gas processing facility, Pedestal Crane, Helideck, Scrapper receiver/ Launcher
- 5.2 Km 12" Sub-sea Pipeline
- Onshore Gas Processing and Compression Facility.

JACKET Fabrication & Installation: The Jacket fabrication and installation was done in fast track to facilitate the drilling as the rig was already in the field.

Gauri-A 4 legged Jacket was constructed at Nippon Steel between Jan to March 2003. The steel was free issued to Nippon Steel by Cairn Energy. The detail design was carried out by JBTI Bangalore under Cairn contract. Steel for Jacket were located in UK, Dubai and Singapore and shipped to Nippon Steel Batam Indonesia in Time. Jacket transportation engineering carried by Asian Energy Singapore. The Jacket Transported by Britoil Singapore. The Jacket was installed in 7 days by Sea Way Heavy Lifting, Netherlands under my direct supervision.

Pipeline Engineering, Procurement & Installation: Pipeline Engineering is carried out by Aker Kvaerner E&C, Singapore. The line pipe material is procured from M/s Tenaris, Tamsa, Veracruz Mexico directly by CEIL to cut down the cost. The line pipe material transported to Ras-Al-Khaimah for corrosion and weight coating. The coating processes for 5500 m of line pipe were completed in week's time and it was delivered in Gauri Field in first week of Jan 2004. The pipe lay was completed in 7 days by HHI using HD-2500 Derrick cum lay barge.

TOPSIDE Fabrication, Installation & Commissioning: Topside engineering, procurement and fabrication were completed in record time of 8 months and 1 week at Lamprell Dubai. It sailed out of Dubai 20 Feb 2004. The Installation and commissioning of topside completed in 2 weeks. The first Gas achieved on 19 March 2004. The Hook-up & commissioning was completed in record of 10 days.

October 2001-September 2002
Cairn Energy India Pty Limited

Construction Manager
Lakshmi Gas Field Development ($ 78 million),
Suvali, Surat, India.

Job Description: Posted at Work Site to Supervise the Job carried out by M/s Clough Offshore Division, Australia.
Overall responsibility to supervise the job carried out by a Contractor to complete the project safely and timely. Responsibilities included to organise daily review meetings, monthly meetings, implementation of HSE aspects, follow up & interact with Contractor on day today basis, provide technical clarifications to contractors TQ's, deal with local regulatory authorities etc.

Responsible for construction & installation of:
* Installation & Commissioning of 4 Km of 24" pipeline for Gas and 4 " for Treated Water disposal.
* Installation of Onshore gas processing and compression facility which included;
a) Terminal area b) Slug catcher c) Gas-Gas exchanger d) TEG regeneration package e) Dew Point Compression Unit f) LT separator g) Metering Skid, Gas Chromatograph and flow computers h) Gas Compressors i) Loading Gantry j) Tank Farm for condensate storage.
k) All associated Civil& Structural Works including piling, Heavy Foundations, Pipe racks, Compressor house, Control Room, Fire water reservoir and pump house etc.
l) All associated piping, electrical and instrumentation works.

Dec 2000 – September 2001
Cairn Energy India Pty Limited

Construction Superintendent
Ravva Satellite Gas Field Development ($ 40 million),
Ravva Terminal, Surasaniyanam, Andhra Pradesh, India.

Job Description: Posted at Work Site to Supervise the Job carried out by M/s Clough Offshore Division, Australia.
Overall responsibility to supervise the job carried out by a Contractor to complete the project safely and timely. Responsibilities included to organise daily review meetings, monthly meetings, implementation of HSE aspects, follow up & interact with Contractor on day today basis, provide technical clarifications to contractors TQ's, deal with local regulatory authorities etc.

Responsible for construction & installation of:
* Jacket & Piling for RH Platform
* Tripod, 4-slot gas platform with minimum facilities like Helideck, Pedestal Crane, Production manifold, separators.
* Installation of 20 Km of sub sea infield pipelines & risers for Gas and Water Injection Pipeline.
* Installation of Onshore gas processing and compression facility which included;
m) Terminal area n) Slug catcher o) Gas-Gas exchanger p) MEG regeneration package q) Dew Point Compression Unit r) LT separator s) Metering Skid, Gas Chromatograph and flow computers t) Gas Compressors u) All associated Civil& Structural Works including piling, Heavy Foundations, Pipe racks, Compressor house, Control Room etc.
v) All associated piping, electrical and instrumentation works.
w) Onshore pipeline and its hydro testing.

June 1997 – Nov 2000
Cairn Energy India Pty Limited, Chennai

Principal Projects Engineer

Job Description:

Responsible for Project conceptualization, Tender specification & document preparation, Review of design documents generated by consultants, Engineering, Tender evaluation, Project management, preparation of monthly report for management.

Following projects handled during above duration:

- Effluent Treatment Plant- EPIC Contract ($ 1.5 million)
- Produced Water Handling Project ($ 250K)
- Gas Turbine Generator – 2 X 2.5 MW- Construction and Installation of Civil, Mechanical, piping and E&I components ($ 200K)
- Helipad Construction for Offshore Operations ($ 175K)

- Construction of Crude Oil Storage Tank- Floating Roof, 79 m diameter.-EPIC Contract o Cathodic Protection for Crude Oil Storage Tanks.
- Engineering of Civil components for Water Injection Upgrade project, Third Stage Gas recovery, Associated Gas Compressor.
- Construction of doghouses on offshore platforms.
- Blasting & Painting of offshore Platforms, o Mechanical Instrument Workshop.
- Sewerage System for Ravva Oil & Gas Terminal & Living Quarters.
- Minor & Major Buildings.
- Public Water Supply Scheme and Canal re-alignment work for local community.
- Construction of Roads - 100 Km-Local Community Development

Apr' 1996 - May 1997
Cairn Energy India Pty Limited
Senior Projects Engineer

Supervised construction of onshore crude oil process facility executed by Hyundai Heavy Industries Ltd., South Korea worth of US $ 100 million.

The project consisted of:
* Construction of 3 Nos. of crude oil storage tanks(65 mts. dia)
* Heavy machine foundations
* 9000 nos. of pre-cast concrete & stone column piles
* Control room
* API Separator
* Cross country pipelines.
Offshore construction:
* Hydro testing of sub-sea pipelines

Aug 1995 - Mar 1996
Punj Lloyd Limited, New Delhi

Sr. Engineer
Job Description:
Ravva Oil & Gas Field Development Project
Punj Lloyd Ltd. was awarded onshore civil construction job.

Overall supervision of following works:
* Cross Country Pipeline
* Stone Column Piling
* Pre-cast Concrete Pile
* Pile Caps/ Heavy Machine Foundations
* Construction of Tank Farm

Dec 1992 – Jul 1995
WAPCOS(Govt. of India), New Delhi

Assistant Project Engineer

Responsible for following:
* Designed Sewerage Network for Nashik & Jalgaon city.
* Feasibility Report for Godavari Action Plan for Ministry of Environment and Forest.

Jan 1992 – Dec 1992
Vij Constructions, New Delhi

Project Engineer
Job Description:

In-charge for Re-construction of Imperial Hotel. A time bound project worth of $1 million.

Sep 1988 - Jan 1992
Chawla Techno Construct Ltd, New Delhi
Engineer
Job Description:
* Turnkey Construction of Chancery Building for Royal Nepalese Embassy at New Delhi, India.
* Construction of 5 Star Super deluxe Hotel Rajputana Palace Sheraton Hotel for Sheraton Group at Jaipur, India.

EDUCATION - Technical 1984 –1988
Civil Engineering

Graduate in Civil Engineering (First Class with Honours) in 1988
From Thapar Institute of Engineering & Technology (Deemed University), Patiala, Punjab, India.

TRAINING/ COURSES
1. "Basic Petroleum Engineering Technology" from OGCI-PETROSKILLS at HOUSTON, USA (2004).
2. "Project Management" from Singapore Institute of Management at Singapore (2000).
3. "Human Relations Skills & Technique" from Singapore Institute of Management at Singapore (2000)
4. "Managing Projects Well" from Singapore Institute of Management at Singapore (1998)
5. "Oil Spill Containment" Workshop from AMOSC, Australia(1996)
6. "Survival at Sea" course from AMET, Madras
7. 'Oil Spill Containment' Workshop from EARL & OSRL Global Alliance (Singapore) at Pattaya Thailand (2001)
8. "Offshore Pipeline Design & Construction" workshop from IBC at Kuala Lumpur (Malaysia) (2001)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 8151 to 8200 of 9785)Go to Search Parameters...
Brief Description
20+ years in administrative field, ie. human resources, managerial, recruiting, exec. assist, proficient in Microsoft Office 2007
He has more than 25 years of experience; from his current work in hydrogeological and hydrochemical assessment, environmental monitoring, and capacity building. He has managed many projects as well as acted as team leader on various project components.
ESP, PCP, SRP Application Engineer
Construction HSE Manager with 18 years of experience encompassing the areas of Safety Adviser through to Corporate HSE Manager. Formerly a Senior ranking Fire Officer (nine years experience). Five year apprenticeship served as a mech. engineer. Degreed engineer with both off-shore and on-shore exp.
A time served Instrument Technician with over 5 years experience as a Production Technician/Control Room Operator on an operational production installation, and as part of the operations team on a major project.
A Mechanical Engineer and an MBA with years of progressive experience in in commissioning, procurement and project engineering of power plant renovation & modernization contracts
Mechanical Engineer with over 7 years experience in QA/QC of mechanical construction activities, Welding, Painting, NDT, Insulation, Implementing QA/QC procedures, Auditing
Maintenance Manager Engineer Middle East Experience, Looking for work in UAE
6 Years in Power Generation, Steam Generation(HRSG) & Desalination (MSFE).
M. TECH. in chemical engineering with specilization in industrial safety and hazards mgt.
Tim Sweeting has been working in environmental and HSE management since 1994, mostly in oil & gas developments. His broad expertise design, construction and operations, auditing, waste management, pollution prevention and managing client/contractor relationships. MSc and professional memberships.
Utilize management and organization skills acquired through previous positions in
Safety Officer QualifiedUK HSE & HSE Trainer
Experience driving loading shovels, Excavators, Dumpers. Managing quarrys and concrete plants
Human Resource Profession
An Experienced HSE Supervisor having worked with many Multi national companies and being recognised by those companies for the excellent job done. The Clients include Exxon Mobil, Single bouy Moorings (SBM), Qatar Gas II, British Petroleum (BP), Anadarko, Saudi Aramco, ARCO Dubai, DPC, RAKGAS, etc.
Enthusiastic & Keen, Good Health, able to Read, Write and interpret intelligently, Skilled to Express ideas Persuasively Confident and Quick, Strong Interpersonal Skills, Ambitious to achieve Demanding Goals
I am a machinist by trade, got into service tech., then field machining and enjoyed it.
B.Sc in Mining and Metallurgical Engineering, Welding Inspector Level II in PT, MT, UT, RT according to ASNT.
I am a highly motivated Operations Manager and am always ready for a challenge. I have extensive experience in management and I am actively seeking a position that fits my skills and experience. Please review my resume to see further details of my experience. I am self moti
I have an overall experience of 17 years out of which 11 years in Oil & Gas Development Projects. Presently I am working as Group Project Engineer in a Major British Exploration & Production Company in Edinburgh UK. Following are my current responsibilities:
Technical Mechanical Maintenance I am a person, very serius, inteligent, honest,i think in the people like shaf of the life
18 months of practical Extensive use of OpenWorks, Z-MapPlus, DSS and Geological & Geophysical Dataloading, Exposure to DIMS, hands on experience on ECLIPSE & SURE simulators, SUN-OS 4.1.X, Solaris 2.X., Silicon Graphics-OS, IRIX 6.5.X
Looking for a suitable post.
I am a Mechanical Engineer in addition to PGDM (Marketing) with 2 years of experience to offer you. I am also a Diploma in Hardware Technology from C-DAC. Have worked for Direct Sales Team of Standard Chartered Bank, Bangalore and Godrej Automation and Robotics Ltd., Mumbai as Sr. Officer (Design).
oil and gas industry
instrumentation engg
Dear Sir/Maddam, From information, that your company has recruitment. Because of that, I’m so interested in joining for empty position. This is my resume, CV and other document.
Commissioning
Handling key customers like Saudi Aramco, Sabic Affiliates, Saudi Electricity Company, Saline Water Conversion Corporation, etc in the western region of Saudi Arabia related to Sealing Solutions.
MECHANIC/WELDER/GENERAL MAINTENANCE & REPAIRS
BSc, 10 years field/management experience in pipeline integrity, pipeline inspection, direct assessment, risk models, project management, surveys, non destructive testing etc.
Quality, Safety, Health, Environment and Security Professional w/ 17+ years in International upstream and downstream O&G sectors
I have 25 years of multi disciplined, design, engineering, and project management experience with very strong automation skills. I am highly experienced with specialize, automated process equipment systems for Oil & Gas, Petrol Chemical, Power Generation, Semiconductor,Pharmaceutical,Water & Waste
BS in Mechanical Engineering from India, 36 years of Petrochemical industrial Experience in NDT & Vibration analyses field.
Looking for career enrichment opportunities in Sales & Marketing, Business Development, Technical Services, Operational Manager, or Telecom commercial consultant with a frontline organization
RESUME
• Extensive experience managing Document Control deparments within Engineering, Construction and Petrochemical Industries.
PLM Degreed Registered Landman with more than 9 years of land related experience & 12 years in the oil industry. MBA degree. AsTeam Leader, supervise landmen of varying levels of experience. Duties include full title abstracting, curative, lease acquisition, due deligence, etc.
Having served in the british police force and military together with over 20 years in the public sector in close protection and management i feel i have the necessary skills required to fulfil any job in my field.
Technical
Site Construction Manager Oil and gas Industry. Over 20 years experience. Process plants, facilities and pipelines.
The last ten years I worked as full time machinist, production supervisor/fitter, and maintenance supervisor hands on, technician/ supervisor in heavy mining and industrial environment.
I have experience with SCADA system using Citect and RSView (Allen Bradley) as Man Machine Interface (MMI) and control system such as Allen Bradley PLC5, SLC500, ControlLogix, SimaticS5 and SimaticS7.
A results-oriented Analyst combining hands on management consulting, project finance, market analysis and mining operations experience, I provide actionable advice for the key business decisions that enhance competitive positioning.
Expertise in Project Engineering, Cadd Management & related fields.
Fully experienced HSE Coordinator,Supervisor,Advisor comfortable in Oil&Gas,Construction and Military environments
Process Operations Manager with extensive overseas experience in oil, gas, petrochemical and pigment industry. Have managed and trained work forces. Have excellent IT skills, is a PTW issuer, possess extensive planning and administrative capabilities and has issued technical manuals and reports.
I have been working in a Piping related discipline for more then 15 plus years and have experience in Engineering design for Offshore Platforms, Refinery Projects, Process Plant, Wafer Plant and also in the Architectural Building & Mechanical Engineering Industrial.
Marine Engineering, Risk Assessment, Lloyds Surveyor, Project Management FPSO Projects worldwide
First   Prev   151   152   153   154   155   156   157   158   159   160   161   162   163   [ 164 ]   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com