CONTACT INFORMATION:
View contact information...
EDUCATION ATTAINMENT:
March 1977: Graduated
High Vocational in Electrical Power
Institute of Technology and Vocational Education (Tak Campus)
March 1975: Graduated
Vocational in Electrical Power
Nakornpathom Technical College
TRAINING:
A. Graduated 1980: Maintenance Air Condition
Telephone Organization Training Center of Thailand
B. Graduated 1988: Management
Kasetsart University, Thailand
CAREER RESUME AND EMPLOYMENT HIGH LIGHTS:
A. Company: TECO-BARCLAY MOWLEM JOINT VENTURE
Inclusive Date: August 19, 2004 – Present
Designation: Building Service Engineer
Project: Taiwan High Speed Rail Project (Taiwan)
Job Description: Supervise to inspection Test & Commissioning E&M equipments as such
Transformer, Generator, UPS/CBS, HV Switch gear, LV Switch gear,
LMCP, MCCB, Air condition system, Fire Pump, FA/PA system, Elevator, lighting, Sewage treatment system, interface system. etc.
B. Company: CB & I (Thailand)
Inclusive Date: February 2, 2004 – July 31, 2004
Designation: E&I Supervisor
Project: Trans Thailand Malaysia (TTM) Gas Pipe Line system
Job Description: Supervise to installation cable tray, conduct, junction box, control panels,
Instrumentation, hook up, air tube, cable pulling, cable wiring and
Termination, gas protection system, loops test and field calibration, etc.
C. Company: Danieli Hellas s.a.
Inclusive Date: November 12, 2002 – November 15, 2003
Designation: Electrical Supervisor
Project: Halyvourgiki (Greece)
Job Description: Conducted to installed cable tray & conduits, switch boards, PLC panels,
Control box, cable pulling, cable termination and pre test electrical Equipment, etc.
D. Self Employee: Sub contractor
Inclusive Date: July 5, 2001 – July 5, 2002
Designation: Manager
Project: Gas seal system (PTT – Off shore), General
Job Description: Conducted to installed lighting, switch, receptacle, cable tray, conduit, cable
Pulling, cable wiring and termination, checking the actual construction,
Wiring test, signal test, field inspection quality control, etc.
Maintenance Electrical & Instrument system
E. Company: S.E.I. Strumentazion Electrotecnica Industriale S.p.A.
Inclusive Date: September 12, 2000 – April 30, 2001
Designation: Electrician Foreman
Project: Shurtan Gas & Chemical Complex (Uzbekistan)
Job Description: In charge of field instrumentation loops test, loops checking and field
Calibration and pre commissioning as such Pressure transmitter, level
Transmitter, flow transmitter, control valve, thermocouple, resistance
Temperature detector (RTD), limits switch, and gas detector, etc.
- Measurement and simulate checking signal out put of instrumentation
- Checking instrument air piping by leak test
- Checking impulse lines by hydraulic test
- Checking interface & interlock system
- Wiring test in the field and Marshalling Cabinet
- Full operation PLC (HIMA ELOP II)
- Prepare As-built drawing and document all loop diagram, P&I diagram and interconnection in Marshalling Cabinet
F. Company: Siam Bio Industry co,. ltd.
Inclusive Date: January 5, 200 – September 5, 2000
Designation: E&I Supervisor
Project: Food Plant (Angthong)
Job Description: Supervise the daily activities of the maintenance personal
- conducted preventive check-up all machines and accessories for running condition
- Conducted physical inventory of equipment and power tools of company
G. Company: Tosplant Engineering (Thailand) co,.ltd. (TOSHIBA GROUP)
Inclusive Date: March 1, 1996 – December 31, 1999
Designation: Electrical Supervisor
Projects: Thai Sankyo, Thai Sanko Tochemi, Thai Sanshin, Toshiba Production Plant
(Thailand), Siam Strip Mill, Toshiba Device Display (Thailand), Toshiba
Semiconductor (Thailand)
Job Description: In charge and supervises as team to all E&I Foreman, charge hand for quality and conformity with specification at the filed installation and materials used
- Supervise in the actual construction and control schedule progress
- High Voltage construction;
- Control installed Substation 115 KV, 230 KV, GIS system, assembly electrical equipments, gas tube, gas insulation switch, main breaker, transformer, switch gear, harmonic filter, SVC system, control panel, protection panel, PLC panel, cable pulling, cable termination, cable wiring
- Testing HV Switch gear, Main CB, relay, transformer, control function, protection function
- Low Voltage construction;
- Control installation works as such cable tray, conduit, cable pulling, and cables wiring, cable termination, control panel, auto transfer switch board,
PLC panel, vender package, lighting, motor, transformer, generator, electrical equipments, etc.
- Testing function control system and protection system
- Instrumentation;
- Control installation works as such local panel, multi core cable, fiber optic cable, tubing, and piping, console cabinet, flow instrument, level instrument, pressure instrument, temperature instrument, control valve and orifice plate
- Loops checking and wiring test
- Measurement and simulation signal
- Preparation as built drawing and finally document
H. Company: Mee Dee Tech co,. ltd.
Inclusive Date: August 1, 1985 - December 1, 1995
Designation: Electrical Supervisor
Project: Fertilizer plant (Kanjanaburi)
Job Description: In charge and supervise industrial maintenance electrical & instrumentation
System
- Weekly preventive maintenance and repair of all Motors and its control, also electronic accessories of the company premise
- Maintenance service of concerning electrical trouble of all departments
- Mechanical repair and electrical control
- Keep completes maintenance records and report the maintenance head any sign of danger the equipment may encounter
- Coordinate with other personal in shift by giving properly information in receiving and turn over of responsibilities, guide trainees in there assignments
I. Company: Telephone Organization of Thailand
Inclusive Date: February 1, 1978 – July 1, 1985
Designation: Engineer
Project: Switching Building
Job Description: In charge in the preparation of layout plans
- In charge of the control of materials quality and workmanship of on going electrical works
- Supervise in the actual construction of the projects including materials estimate and schedule
- Installation high voltage and low voltage equipments
- Installation power cables and telephone cables
- Installation Air condition system
- Installation lighting system
- Installation Fire alarm system
- Installation Public Address system
- Preparation As-built drawing and finally documents
I here by certify that the above information are true and correct to the best of my knowledge and belief.
View contact information... |