Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #3105
next resume »»
CONTACT INFORMATION:
View contact information...
Current Occupation:
Alcatel Egypt, (since 1999).
Responsibilities and tasks:
q Project: Mobinil– Egypt (1999 to March 2000)
- Member of a commissioning team:
* BTS (G2, G3, M4M), BSC, TC and MW Commissioning in Cairo and other parts of Egypt. Dealing with Power rectifiers, Fire and Heat alarm systems.
* Dealing with PCM links over Microwave, HDSL and Fiber Optics.
* Reporting to the Deployment manager.
q Project: Mobinil– Egypt (March 2000 to September 2000)
- Commissioning Team Leader:
* BTS (G2, G3, M4M), BSC, TC, MW Commissioning.
* On job training for my team (two commissioners).
* Reporting to Deployment manager.
q Project: Petrogas. (March 2000 to September 2000)
- Transmission Technical support.
* Providing on site support for a complicated transmission system Including different configuration of Multiplexers, MW PDH Equipment, supervision systems and three monitoring centers.
* Reporting to the deployment manger.
q Project: SUMED (September 2000 to July 2001)
- Performing site visiting before starting the work.
- Responsible of the follow up of the Implementation of the project.
- Make full use of the resources.
- Transmission Equipment Commissioning (MW, MUX, Cross connect,..)
- Implementation of supervision system using 1322 Mediation device.
- Follow up with the customer to make any necessary modification in the time slot mapping to reach his new requirements.
- On site training for one commissioning engineer on the commissioning and uses of the Multiplexer and all the possible configurations and the used application boards.
- Finalizing the work and satisfying the customer needs.
- Follow up with the Subcontractors for the installation of MW antennas, New towers, Maintenance of old towers, MW feeder installation.
- Performing Site acceptance test with the customer.
- Switch over from the old system to the new transmission system.
- Collection of the old system components, packing and delivering it to the customer.
- Performing final acceptance with the customer after the switch over.
q Project: Mobinil- Egypt (September 2000 to July 2001).
- Deployment Manger deputy.
* Providing good communication with logistic responsible to follow up the equipment delivery.
* Stock monitoring With the Deployment manager.
* Following MW PHD commissioning.
* Interface with Mobinil Representative to get data concerning new links.
* Preparing site documents.
* Follow up with the team leaders, commissioners and technicians jobs.
* Follow up customer comments.
* Reporting to Deployment Manager.
* BSC, TC Commissioning.
* Updating database.
* Preparing the Individual acceptance certificates.
* Submitting the acceptance files, and the IAC to the Deployment Manger for Revision.
* Sending the acceptance files, and the IAC to Mobinil.
* Providing on phone support to our commissioning team on site step by step.
* Providing on phone support for Mobinil Maintenance team.
* Preparing the link budget of some kind of MW LX links that does not apply to the tool of the customer.
* Contacting the support center for new releases of programs and Software versions used for MW commissioning.
* Performing Equipment upgrade in capacity, to make it ready for on site upgrade.
* Getting new program to simplify the EEPROM and RAM upgrade of the MW equipment from any software version to LUX40.
q Project: UTL (Uganda, 100 sites). November 2000 (duration 2 weeks)
- Transmission survey and planning for the GSM network.
* Coordinating with the RNE Manager for the location of the GSM sites.
* Design of the transmission system to these sites.
* Preparing site survey reports.
* Validation of the line of site for the required MW links.
* Making the Frequency plane using the available channels supplied by the customer.
* Coordination with the customer for any special requirements.
* Interconnection links with the two other operators (Celtel and MTN).
* Preparing the link budgets.
q Project: UTL (Uganda) (December 2000 to February 2001)
- Implementation Manger During phase 1a (29 sites).
* Preparing the available resources and putting the commissioners and technicians into teems, arranging the tools.
* Preparing site documentation (delivery, Installation and acceptance)
* Follow up with the commissioners and technicians on site.
* Providing good communication with logistic responsible to follow up the equipment delivery
* Follow up with the site supervisor to Ensure the completion of civil work by the Subcontractors on site
* Ensuring the completion of work in the required time 29 BTS sites and 31 MW links in 30 days.
* Solving Problems with the customer regarding wrong channels given and redoing the frequency plane for the transmission.
* Preparing the configuration of the sites and the new distribution of the standby capacity according to the customer needs.
* Preparing the acceptance documents and starting the acceptance with the customer.
q - Project: UTL (Uganda) (from July 2001 till February 2002)
- Implementation Manager acting as a Local Project Manager.
* Organizing and following-up regular meetings (working groups) with customer.
* Preparing and distributing monthly report to the customer on Alcatel activity for the network including network growth (number of subscribers, number of equipment, performance indicators) to be provided regularly to the customer.
* Listen to all customer requests and transmit information internally (GPM, Tendering,..)
* Check that Acceptance Certificates are signed "in due time" by customer.
* Organize the resources in an efficient way (departments, teams, etc ).
* Develop technical skills with good management of "experience sharing" within the team, and through a well prepared training plan.
* Make sure that communication with the team is continuously established.
* Highlight main objectives and make sure that they are well understood within the team.
* Reduce costs to improve operational margin.
* Evaluate the needs for sub-contracting part of the activity to ensure that production capacity required is available and to absorb peaks in the roll-out.
* Develop a reliable network of local subcontractors for all activities required locally ( site acquisition, site preparation, equipment storage, equipment delivery, equipment installation, …)
* Send typical Request For Quotation to sub-contractors in order to get the best offer; price verses performance.
* Continuously evaluate sub-contractors, with clear policy of sub-contractor market share depending on overall Quality of Service provided.
* Good "resource dimensioning" and clear implementation schedule.
* Follow-up acceptance certificates to be signed by customer. Check with financial controller that acceptances are all correctly transformed into Sales.
* Prepare monthly reporting to MND local management.
* Transmit to tendering department all requests from customer that could lead to an offer.
* Involved in the preparation of a new offer including local services for "resource dimensioning" and clear implementation schedule.
* Coordination with PM good phasing of equipment launching and local services.
* Transmit to PM, equipment stock status to make sure we don't run out of equipment.
* Constantly review shipment schedule to adjust implementation schedule accordingly.
* I always make sure that I receive all the logistics documents before the arrival of the equipment to clear the equipment from the customs as soon as possible.
q - Project: Djezzy (OTA "Algeria") (June-July 2002)
- Deployment Manager.
* Weekly meetings with the production department of the customer to plane the activity of the week.
* Start site visit to make check list after receiving the D7.1.
* Make delivery of the site after receiving the D7.2.
* Initiate a certificate of start of work to be signed by the customer before starting the work on site.
* Send request to SDV "subcontractor" to make the Delivery.
* Follow up the delivery and the ware house status.
* Contact the installation subcontractor to send them with the installation supervisor to start installing the New site.
* Follow up the installation and Make audit for some sites to check on the quality of installation.
* Start commissioning the site after receiving the work order.
* Perform PO follow-up.
* Arrange for the acceptance with the Customer.
* Initiate the individual acceptance certificate to be signed by the customer for invoicing.
* Send weekly report to the LPM on the work progress and the warehouse status.
* Update the data base.
q Project: Globacom (Nigeria from January till June 2003)
- Deployment Manager:
* Coordinate with the Ware House manager and the logistic manager In order to have an update on the delivery of equipment in the 4 areas.
* Implementation Schedule Planning for the 4 forecasted areas in step 1 (Lagos, Abuja, Port Harcourt, Ibadan).
* planning the required schedule in which we should perform the implementation (Site acceptance from the civil BD, delivery of Radio Equipment, installation of both Radio and WTD equipment in BTS sites, installation of BSCs and TCs, offline and online commissioning, Site revisit, and site acceptance with the customer).
* Resources and tools planning: requesting the required resources to achieve the planned implementation schedule, and making a backup plane in case of any Delay in the civil works, and Validating it from the LPM.
* Issuing all the check lists for all the works under the deployment responsibility; and validating it form the quality manager.
* Defining all the documents required by the resources and initiating a distribution list, validating them from the quality manager and giving the FIM the responsibility of distributing them on the resources.
* Initiating the Deployment activity flow chart and validating it from the LPM and the Quality manager, and dispatching it on to the FIM.
* Follow up the work progress on site by acquiring daily reports from the Field Implementation Managers on the work progress on site and the Job done by the subcontractors. And paying visits to the sites to check and validate the reports.
* Requesting the Local tools like cars SIM cards and security for the Resources.
* Checking with the security responsible for the conditions on site and how to deal with the community and area boys.
* Reporting to the LPM and the Operation manager on all the deployment activity.
* Performing daily site-by-site meeting with the RNE manager and the Civil LPM to make sure that the implementation plane is still valid. And initiating red flag if there is a delay.
q Part time Trainer:
Trainings given:
1- training on MW theory and Alcatel Melody equipment.
* Preparing course contents.
* Giving the trainees a chance to participate in a simulation network planing and solving simulated problems.
* Training the commissioners on new release of MW software version LUX40.
2- Training on SAFT power supply.
* All types of SAFT power supply racks.
* All types of batteries.
* The power Management.
* The Economy.
Computer skills:
* Very well experienced in hardware as well as the software of PC weather desktop or laptops.
* Most of the Faulty PCs in Alcatel or within the family and friends are sent to me for repair.
* Used to most of the PCs operating systems starting by DOS, windows 3.x, 9x, 2000, NT.
* Expert in Microsoft office products like (word, excel, power point, outlook, outlook express, internet explorer, Visio,..)
* Also other programs like Acrobat reader, MathCAD, AutoCAD, Path loss and survey programs.
* Other relevant stuff.
Training Courses Taken at Alcatel:
- GSM Introduction
- BTS commissioning.
- BSC & TC commissioning.
- OMC B5.
- TC 925
Previous Occupation:
1. Daltex Information Technology. "Unisys-Egypt" ( 6 month ).
Position: R&D Eng.
Responsibilities assigned:
a. Design and implementation of LAN(s).
b. Responsible of a new project; MICR "magnetic intelligent character recognition " automatic check reading M/C.
c. Implementation of major networks for the army and ministry of internal affairs, including main frames or mid range computers.
2. Matareia exchange. (One year) [During Army service]
Position: chief Eng.
Responsibilities assigned:
a. Design of the new telephone network expansion from 18000 line to 57000 line.
b. Watching over the whole team of Eng. Supervisors and technicians; survey cabinet design, on site marking (for boxes and new cabinets), work follow up (digging, cables implementation, boxes installation, cable welding, new main halls emplacement…)
c. For both secondary and primary networks.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 9001 to 9050 of 10916)
Go to Search Parameters...
Brief Description
Power Transmission Line & Lighting of Highways, Electrical Design & Low Voltage, Electromagnetic Field
Experienced involved problem solver with more than nineteen years of progressive experience, offering significant expertise in project management, manufacturing and oil and gas accounting management, and focused on management operations and am able to continue to learn new processes and apply them.
I am an advanced Scaffolder (CISRS), Advanced Scaffold Inspection, Risk Assessment Trained, and am Computer Literate. I have an extensive understanding of scaffolding and design, the importance of health and safety and the best ways to achieve the goal of supplying clients with a cost effective and
As evidenced by resume I am extremely skilled in sales management and business development. I have extensive knowledge and experience in electrical, mechanical, mining ans sales/service management.
Very flexible, Diverse experience. Looking for a place to excel.
I have over 10 years as a driller and derrickhand
17 years safety experience, Grad Dip OHM, MSIA, (RSP Australia), Trainer
Piping designer
Experience in pipeline, Power Plat Installation
Technical Writing with 15 Years of Experience in the UAE
Electrical engineer, Constraction, Control & Instrument, Coal, Oil & Gas projects,
Seeking Managerial or Supervisory position in Logistics & Transportation.
instrument supervisor 5 year experiance
Chief Enineer, Limited, Oceans, Unlimited HP
Jamiu Badmos is a Registered Engineer cum HSE Professional with over 9yrs experience in QHSE & Project Management
Experience in Automation Systems (Triconex Safety Control Systems, Honeywell FSC). Bachelor of Telecom/Control Systems Engineering. Experience in GCC countries. Currently working as an Application Engineer
23 Years of Various field of accounting
Director
I would like to apply for Engineer or any kind position which is suitable with my education background and experience. I graduated from Trisakti University majoring in Mechanical Engineering with GPA: 2.80 (scale of 4.00) in 1998. I offer skills through formal education and experiences.
Analytical skills to improve methods and procedures applying ESP and Gas Lift systems to develop exploratory well completions, workover jobs, water control, and general oil field operations. Knowledge of modern well construction (completions) operations and techniques.
I am mechanical engineer graduated in 1997 in Simon Bolivar University, Venezuela. I have five years experience in drilling operations. I have experience in HPHT, directional, high angle, exploration, onshore and offshore wells.
An Engineer working at Alcatel Egypt, S.A.E. MND division. Looking forward to change my carrier from telecommunication to Petroleum/ Gas/ oil. I am very energetic, willing to learn and have a very good team spirit. I love challenge and can work in any working environment and conditions.
I am a young man who has worked hard all and received little for his efforts, and what I have received is gone. I am looking for a new start in a new line of work that is more profitable than those jobs I have had in the past.
Radio telecommunications operator based in Amman/Jordan , have various work experience in coastal radio stations, on ships board, united nations . total experience over 5-years . Looking for good opportunity in oil/gas offshore, onshore projects : world-wide as RADIO OPERATOR
Shift Supervisor Shift Foreman Plant Operator
working in French company named Air liquide as a manager sales & customer support since 1998. This company is in the industrial gases . I am searching job in the same field. Any Cryogenic Company Interested Please call me.
I have been working in the Safety, Health and Environmental (SHE) field for more than 9 years. Throughout these years I have been exposed to various SHE related requirements and problems. One of my key competency area will be managing workplace day-to-day safety, health and environment issues and
I am seeking Medical Advisor/Occupational Health position to continue my occupational physician’s career with a multinational company.
Welder Fitter, with pressure certification (F3/F4 on 5G uphill progression -mild steel). Worked in fabricating shop on commercial and industrial products. Very proficient with GMAW and SMAW. Little experience with GTAW. Worked mostly mild still and some alloy. Little aluminum experience.
b.e(industrial electronics),skills are worked on siemens/abb plc,ac & dc drives,troubleshooting ,hydraullic know how,pneumatic know howsiemens drive,lenze drive,ac & d motors and their controlling,worked over software like cmms,icam,matlab,autocad,orcad,software used in equipment/machineries.
Ability to perform field inspections, risk assessment, review, prepare procedure and hand.Self-development in administration and management skillsle permit to work system.Ability to improved performance, utilizes effective follow up actions to solve employee or work related problems.
Title of qualification awarded Bachelor of Science in Physics Name and type of organisation providing education and training Universidade do Algarve, Faro, Portugal
I have 25 years experience in the Instrumentation field as Instrumentation supervisor, Instrument QA-QC Inspector and Instrumentation technician. Present I am working for (YANSAB) Yanbu National Petrochemical Company a SABIC affiliate (Kingdom of Saudi Arabia.).
Previously worked for a oil and gas brokerage firm in Houston, Tx at the end of 2008. Experience as leasing agent and experience in running title in Texas.
A Degree in Business Admin and Management, skills and experience in secretariat and Administrative duties, have worked in an Oil and Gas company, 2 Construction Companies, good mastery of Micro Soft applications, excellent in both spoken and written English, with French and an additional Language.
Western IT and data networking expertise. Enterprise and Telecom experience. PMP holder
Journeyman Industrial Electrician , Apprentice Instrumentation Mechanic / PLC , DCS, HMI, SCADA . Underground / Surface, Oil and Gas, Mining
Handle preventive maintenance for the machine , servicing machine ,replace breakdown component /or equipment.
RSLogix 5000, PLC 5, SLC (Allen Bradley) Concept (Modicon, Quantum) Unity (Modicon, Quantum, M340, etc.) Setting up and commissioning of Advantys IO systems Rockwell, RSView Wonderware, Intouch
My areas of expertise are production, short-term planning and project management. I am a troubleshooter and leader that use influence to get things done
Operation Manager, International Pipe Inspector by DS-1, (Level II UT, RT, MT & PT) - ASNT-TC-1A
MSc Engineering / Business Development / Project Management /Energy fielsd
Control Systems Engineer (Programmer & Designer)
i have three month experience in the oil field and one year experience on the mining field as a junior geologist. my duties are core logging,sampling, underground mapping and data acquisition,and Running/Monitoring (data collection) and processing of crude oil to the surface.
Project Manager / Finance Management
22 YEARS POWER, PETROL-CHEMICAL, AND REFINERY INDUSTRY
Environmental pre-construction surveys for wetlands, streams, and wildlife habitat; knowledge of wetland plants, soils, and delineation rules as well as general ecological knowledge. 10 years of experience on pipeline projects.
10 Plus years Developing and maintaining EPC Schedules Utilizing Primavera Softwares
Driver, teacher, maintenance computer, air conditioning and electrician
ISO Implementation, Documents, Records, Archival Management, QA Manager, Writing Technical Documents, Auditor
First
Prev
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
[ 181 ]
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com