Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #35101 next resume »»
CONTACT INFORMATION:
View contact information...

QUALIFICATION: B E (Hons) Mechanical

INSTITUTE: Birla Institute of Technology & Science, Pilani

EMPLOYMENT SUMMARY:
S.n Name of the organization From To Designation Experience details
1 Reliance Industries LimitedHazira - Surat. Mar 1995 Till date Sr Manager (Mech )Manager (Mech) DyManager (Mech) Maintenance & Annual Turn around Planning in Maintenance Planning department
2 M/s Asian Peroxides Limited Aug 1994 Mar 1995 Asstt. Mgr (Maint) Maintenance
3 Indian Navy Aug 1987 Aug 1994 Asst Manager (Commissioned Officer of the rank of Lieutenant) Operation & Maintenance on board Indian Naval Ships & Dockyards

PRINCIPAL ACCOUNTABILITY
* Experienced in major Plant Turn-around planning of Mono Ethylene Glycol, Naphtha Cracker & Captive Power Plant
* Implementation of Plant Maintenance Module of SAP 4.6.
* Establish and insure implementation of Policies & Quality procedures of Centralised Maintenance Planning.
* Preparation of Management Information reports indicating trends for Plant Availability, Equipment availability, Maintenance Expenditures, Preventive Maintenance Coverage, Equipment history updation,
* Preparation & updation of Bill of Materials of Rotary & Static Equipment.
* Material resource planner for identification & upkeep of Insurance spares, regular monitoring of Essential & desirable spares & monitoring of spares consumption trends.
* Preparation of long term & short term maintenance planning & overhauling programs for equipment.
* Preparation & review of Preventive Maintenance schedules of equipment in SAP.
* Failure Analysis for failures of equipment & recommended corrective actions & follow-ups.
* Preparation & review of Annual Budgets for CAPEX Jobs, Plant Projects & Maintenance Expenditures.
* Planning of daily & weekly Plant Maintenance Activities.

SPECIALITY SKILLS
1. Hands on Experience for Plant Annual Turn-around planning consisting of following activities:
* Pre-shutdown preparations includes - Preparation of detailed contractor work scope, finalisation of contracts in consultation with Contract Cell, Identification of Spares requirement & procurement, finalizing resource requirement & preparation of detailed shutdown schedule.
2. Hands on experience in using Computerised Maintenance Management Systems - Plant Maintenance & Materials Module of SAP 4.6.
3. Conversant with packages of Windows 2000 like MS Words, Excel, Power Point, Microsoft Project Planner etc.
4. Preparation & Implementation of ISO 9000 Quality Procedure of Planning Cell.
5. Overall experience blends Maintenance & Planning background on equipment like Pumps, Blowers, Compressors, Turbines, Reactors, Exchangers, Columns, Centrifuge, Exchangers, Multi Stage Pumps etc.
6. Hands on experience on Project Planning & Execution for smaller scale projects & Plant debottlenecking schemes. Was involved in Planning function of Butadiene Project in RIL, Hazira
7. Active participation of TQM & Quality Circle groups.
8. Trained Auditor for ISO9000.

JOB PROFILE
I. Experience with M/s Reliance Industries Ltd Hazira

Presently working with M/s Reliance Industries Ltd Hazira as Senior Manager (Mech). M/s Reliance Industries Ltd Hazira is India's largest private sector engaged in manufacture of Synthetic Fibres, PP, PVC, HDPE, PE, MEG, PTA, CPP, Aromatics etc. It has India's largest Naphtha Cracker Plant of 650 KTA capacity. In this complex, hydrocarbons are processed.
I am presently working with Central Engineering Services as Maintenance Planning Engineer in Planning Cell.
Maintenance Planning
1. Receiving Maintenance Notification/Job work request from process & validation.
2. Preparation of execution plan for Notification & converting it into Work Order.
3. Preparing the detailed Contractor work scope & finalisation of order in consultation with Contracts & Purchase department.
4. Finalisation of requirement of spares & heavy equipment requirement, raising requisition & mobilization as per execution plan.
5. Preparation of Weekly Maintenance Plans for preventive maintenance & Reliability Improvement jobs.
6. Review, finalization & scheduling of Annual Preventive Maintenance Plans for Rotary & Static Equipment in SAP.
7. Preparation, review & up-dating Equipment Service Sheets & Overhauling check list for Rotary Equipment. All the records to be updated & maintained for future requirement.
8. Ownership of CMMS package(SAP 4.6) to ensure correct entry of data after completion of jobs so that correct history records are available.
9. Preparation of Failure Analysis report & recommending corrective actions for prevention.
10. Preparation of Maintenance budget for spares, consumables & contracts for Maintenance & Plant shutdown requirement.
11. Equipment spares Planning & procurement as Material resource Planner.
Plant Annual Turn-round Planning
1. Finalisation of Job list in consultation with Process, Statutory requirement, FAR recommendations & vendor's overhauling schedule.
2. Preparation of detailed work scope including requirement of spares, tools, skilled manpower & heavy equipment.
3. Preparing contract work request, technical bid analysis for contractor & assisting Contract cell for Order finalisation.
4. Preparation of detailed Turn-round schedule using Microsoft Project Planner.
5. Raising purchase requisition, follow up actions for procurement as per committed delivery schedule.
6. Finalisation of Resource requirement in term of Contractors, Heavy equipment, Hydrojetting services etc.
7. Preparing shift-wise Turn-round monitoring reports, highlighting constraints, & releasing reports to management.
8. Preparation of final closing report.
9. I have planned and monitored Major Inspections, Hot Gas Path Inspections & Combustion Inspections in Power Plant.
Management Information System
1. Preparation of Maintenance benchmarking indices based on guidelines of consultants like A T Kerney, Soloman Associates, Jokobs International for:
a. Equipment availability b. PM Coverage c. Planned vs Unplanned work orders.
2. Equipment Reliability Reports consisting of:
a. Mean time between Failure (MTBF)
b. Mean time to repair (MTTR)
c. Preventive Maintenance Coverage d. Plant Availability reports.

II. PREVIOUS EMPLOYMENTS
A) Duration Aug 1994 to Mar 1995

Designation Deputy Manger (Mechanical)

Organisation M/S Asian Peroxides Limited
Sullurupeta
Andhra Pradesh

Responsibility In-charge of Mechanical Maintenance
Equipment handled Pumps, compressors, DM Plant, Boiler

B) Duration Aug 1987 to Aug 1994

Designation Assistant Manager
Lieutenant (Indian Navy)
Organisation Indian Navy

Experience Worked on board Indian Naval Ships Betwa, Ranjit Ranvir.

Equipment Handled Gas Turbine propulsion units, Gas Turbine Generators, Pumps, Compressors, agitators, centrifuges, Diesel engines & Stationary equipment

SOFTWARE PROFICIENCY
Microsoft Word 97
Microsoft excel 97
Microsoft power point 97
Microsoft Project Planner version 4.0 & 2000
Lotus Notes version 6.5
VAX
Well versed in using SAP version 4.6 D
Undergone training in Primavera P3/EC

SPECIAL KNOWLEDGE ACQUIRED / SPECIAL TRAINING UNDERGONE
Knowledge of Quality systems ISO 9001:2000
Knowledge of Plant Safety & BSC safety audit system

Successfully completed Integrated Management Systems Internal Auditor Training Course (ISO 9001:2000, ISO 14001: 1996 & OHSAS 18001:1999) conducted by M/s Lloyd's Register Quality Assurance

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1651 to 1700 of 10017)Go to Search Parameters...
Brief Description
I work for the JV SH-AGIP. During my work experience I used VIP and Eclipse softwares. I built reservoir simulation models mainly black oil models and I published some SPE papers in different meetings worldwide.
Lead engineer/Manager for DCS /PLC/ESD systems
Assist General Manager
Plant operator
IRCA Certified ISO QMS 2000 Lead Auditor (No:01181089) IRCA Certified ISO 14000 EMS Auditor IRCA Certified OHSAS 18001 OHSMS Auditor Certified Quality Auditor (ASQ CQA) Certified Welding Inspector AWS CWI Certified Quality Manager (CQM)
I am having 17 years of experience in Pre commissioning/Commissioning /Start up and Operation of different Oil/Gas/Refinery/petrochemical/ plants/units/off sites/Utilities
I have 33 years experience in design/construction project management on Petro-chemical Projects which include upstream oil and gas, refinery projects and chemical projects. I have managed both green-field and brown-field projects on schedule and within agreed budgets.
I have been working at Mudlogging Operation more than 15 years. And have responsibility as:
Qualified like Mettalurgical Engineer, specialty Metallurgical Processing, Internal Auditor for Quality Systems in accordance with ISO 9000 series, Computers abillities..
Experienced HDD Engineer
Looking for work as a Drilling Supervisor
I have over 25 years of experience in the petroleum industry, primarily focused in drilling operations and engineering. My diversity includes US domestic and international experience offshore and onshore. I am seeking any challenging opportunities to further my career.
I have worked in the Quality Assurance Division and Health, Safety, Environment & Quality (HSECQ) departments where my knowledge and expertise in field of HSECQ was enhanced.
Petroleum Engineer with 9 years of experience in gas and petroleum reservoirs
Petrophysicist,, Open hole and Cased hole experience, LWD experince with Baker Hughes Inteq
9 yrs Exp. Document Controller
Over 12 years of rich and extensive experience in Oil and Gas, Refinery and Petrochemical and currently serving at PETROFAC INT LTD. Kuwait in KUWAIT OIL COMPANY.
Ability to manage multi projects and organize all procedures on and off sites to ensure the projects are completed on time and within the budget.
I have over 15 years experience working as Maintenance Planner in the Petroleum industry using Maximo and other computerized maintenance system
I have 17 years valuable experience: 6 years I was working in the gulf of suiz petroleum co. in Egypt. 11 years I was and still working in Abu Dhabi water and electricity authority in UAE.
·ICCP Design and Installation Principles · Quality Control – Pipeline Integrity Management, Data Management; Protective Coating Manufacturing Technology
I am an Engineering graduate with 13 years of operational as well as commissioning experience.currently working with Qatar LNG plant
Purchasing, sales, marketing and international trade management
Knowledgeable in SAP R/3 MM Module and have over 13 years of experience in a petrochemical company in Saudi Arabia and Kuwait.
+13 yrs exp in Well site geologist , Data Engineer
cnc machinist, edm die sinker, wirecut operator
i have nineteen years more in Cad Drafting Mechanical and Electrical Drawing
Senior Project Manager with 7 years experience in the Media Broadcast Industry. Masters Cert in Project Management in 2007. IT Engineering & Software project background.
•Over 7 years experience as a well logging Geologist in NORTH SEA, AFRICA, and the MIDDLE EAST with a major Oil and Gas Exploration Company in the Oil Industry. And also 3 years experience as a Field Geologist.
Over 14 years of experience in wide range of core refinery operations like pre-commissioning, commissioning, operating ,optimisation, handling start up and shut downs etc of various process plants like FCCU ,SRU, Naptha HDS, CRU ,CO Boilers/ Meroxes/ N2 /benzene/toluene/Hexane extraction plants
Planning Engineer with a degree in Mechanical Engineering. Skilled in carrying out Daily Maintenance Planning & Plant Turnaround Planning. Expertise in using SAP PM & MM Modules. Conversant with Computerised Maintenance Management Systems. Hands-on experience in preparing MS Project Schedules.
Electrical Engineer with more than fourteen years’ experience in the filed of design, testing & commissioning and maintenance of substations up to 220kV; study, analysis, modifications, testing and trouble shooting of protection systems; power system analysis including IPP interconnections/impact
I have around 20 years oil and gas field experience,out of which about 5 years are in offshore.Presently I am working in an FPSO,in Mauritania,W.Africa.
HND MEASUREMENT &CONTROL ENGINEERING
Project Services/ Project Controls
CONSTRUCTION PROJECT MANAGEMENT: Managing all construction projects. Estimating time and material costs. Maintaining quality and cost control. Conducting weekly safety meetings.
Good knowledge of international QHSE regulations and standards as well as oil and gas operations and business.
Over 15 years oil industry experience with an unusually broad-ranging geological/petrophysical background. Proven ability to work efficiently as part of a small team due to well-developed technical and organisational skills. At ease with tasks requiring personal responsibility for attaining high sta
Field Instrument Engineer with a total of 19 years related experience with specialist knowledge of Control Valves. Qualified to Higher National Diploma level ( Mechanical Engineering , 1985 ).
More than 13 years of multi-international reservoir engineering experiences in gas and oil developments from sandstone and carbonate in land fields and offshore,including different stages of appraisal and development planning & management, well test, reservoir characterization & simulation, economic
Over 16 years experience (covering all aspects of onshore and offshore E&P business)
A Petroleum Engineering professional with sixteen years of diversified E&P experience in onshore environments with an Indian national oil company, Oil India Limited and Cairn-Energy India Pty. Ltd (incorporated in Autralia)
Degree on Industrial Engineering. More than 15 years intensive involvement in Oil and Gas Industry (the last 9 years in supervisory level). Received various assignments such as Gas Plant Operator, Board Operator, Metering Technician, Field Engineer, Mechanic Supervisor and Offshore Supervisor.
16+ years working experience with major E&P companies in North Africa & SE Asia. Have extensive experience in supervising and implementation of reservoir management strategies, predict performance and optimize future depletion and field development planning.
I am a successful, experienced and qualified Start up Specialist, Commissioning Production Supervisor, Shutdown Coordinator with over 16 years extensive experience (both onshore and offshore) within the oil, gas & petrochemical industry.
I have commitment to safety, exceptional service and continuous improvement.
I Have over 20 yrs clerical-administrative-accounting experience
Mud engineer - 5 years. drilling engineer - 2years, drilling supervisor - 3years
11 plus years combined work experience mainly 8 plus years in the field of Project Controls related to Design Engineering and Construction of Petrochemical Plant. In project controls, work in various positions as planner/scheduler, cost engineer and document controller.
Radio Operator/Offshore Logistic Planner/Heli-admin
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   [ 34 ]   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com