May 97 - Present SAUDI CONSULTING AND DESIGN OFFICE (SCADO)
AL-KHOBAR, SAUDI ARABIA
Position: civil-structural/Pipeline Engineer
Preparation of detailed engineering design packages, piping material selection, supervision of drafting work, preparing piping plan, Isometric piping details, performing piping calculations (pipe wall thickness, elastic bend and pipe cover for Flow lines, etc.), piping/pipeline stress analysis, project control and planning for various Saudi ARAMCO projects.
SAUDI ARAMCO PROJECTS:
Detail Design for Drilling Site/Wellheads facilities, Qatif (BI-8287, )
Major activities involved:
Design of Trunk line & Lateral Micro Station (INTERGRAPH) as designing tool.
Scraper Launcher and Scraper Receiver Of Trunk line
Piping stress analysis for 16" Oil Flow lines & 10" Oil Test lines headers for drill site on CAESAR-II Piping Stress Analysis Computer Program.
Detail design package for drill site.
Qatif MP Trunk lines and Laterals (BI-8287)
Worked as Engineer-1 for detailed design of twenty (20) Oil Trunk lines, ten (10)
Laterals Approx. length 187 KM. for Qatif GOSP-1, GOSP-2
Detail Design for Drilling Site/Wellheads facilities, Shaybah (BI-8257, JO #50698)
Major activities involved:
Material estimation.
Design of 126 Oil Wells 8" Flow lines using Micro Station (INTERGRAPH) as designing tool.
Design of 16" Oil Flow lines & 10" Oil Test lines headers for 24 Sabkahs using Micro Station (INTERGRAPH) as designing tool.
Piping stress analysis for 16" Oil Flow lines & 10" Oil Test lines headers for 24 Sabkahs on CAESAR-II Piping Stress Analysis Computer Program.
Detail design package of Sabkah's piping.
Shaybah MP Trunk lines and GOSP Inlet Spools (BI-8276, JO #82761)
Worked as Engineer-1 for detailed design of Four (4) Oil Trunk lines, Eighteen (18)
Inlet piping spools for Shaybah GOSP-1, GOSP-2 & GOSP-3 (6 spools for each GOSP).
Shaybah MP New Sabkhah's 17 & 92, Start-up Sabkhah's No. 10, 11, 38, 41, 50, 62, 70, 91, 98 (BI-8276, JO #82761/51005)
Worked as Engineer-1 for detailed design of two new Sabkhas's piping (Sab. # 17 & Sab. 92) & nine existing Sabkhah's piping (Sab. # 10, 11, 38, 41, 50, 62, 70, 84, 91, 98).
Structural Detail Design (BI-8257, JO #50698)
Worked as Structural Engineer for the design of the Removable anchor, Full thrust Anchor, Tee-Supports plat-forms, valve - operating platforms, tank foundations, pole foundations, skid- foundations, switch rack foundations.
Transmission Line Foundations Design at Shaybah (BI-8257, JO #50698)
Involved in detail design for pole foundations for 33 kv transmission line.
Worked as Project-Engineer for the following Flowlines/Trunklines:
Tie-in DWI ABQQ-403 to ABQQ-GOSP-4
Tie-in ANDR-437, 438, 439, 453, 454 to ANDR-GOSP-1
Tie-in 20" UTMN-454 Trunk line to UTMN-GOSP-2
Tie-in Water Supply SHYB-845 to SHYB-GOSP-2
Tie-in MNIFA-703 & 12" New DWI Trunk line
Tie-in of UTMN-1276 to UTMN-GOSP-13
Tie-in of UTMN-1283 to UTMN-GOSP-4
Tie-in of UTMN-1290 to UTMN-GOSP-13
Tie-in of UTMN-1447, 1448, 562 to UTMN-GOSP-12
Tie-in of HWYH-332, 333, 334, 335 to HWYH-GOSP-3
Tie-in of HWYH-336 to HWYH-GOSP-3
Tie-in of ANDR-475 to ANDR-GOSP-3
Tie-in of UTMN-1441 to UTMN-GOSP-2
Tie-in of UTMN-1456 to UTMN-GOSP-10
Tie-in of UTMN-1284, 1286, 1287, 1289 to UTMN-GOSP-4
Tie-in of SDGM-99 to SDGM-GOSP-3, Re-routing
Tie-in of UTMN-1436 to UTMN-GOSP-2
Tie-in of SDGM-418 to SDGM-GOSP-3
Updated the Model package for Oil Flow lines
Tie-in of HWYH-156/446/447/448/449 & PWI NE Flank Header to HWYH Central WIP
Mar. 95 - Apr. 97 POULING MIDDLE EAST EST. Abu-Dhabi.
Position: Estimator/Planning Engineer
Involved in progress and payment scheduling, preparation of cash flow chart, sub-contractors monthly payments preparation, project control, coordination and documentation, preparation of bar-bending schedule, material coordination and monitoring, estimating and costing for tender.
Arl. 91 - Mar, 95 OIL & NATURAL GAS CORPORATION LTD.
Bombay, India
Position: Structural Engineer\ Stress Engineer
Involved in detailed design and analysis of civil structures which includes:
Foundations for pipe support/equipment.
RCC retaining structures, substation building, control rooms, compressor houses, road crossing/paving pits, storage tanks-foundations, cable trenches, etc.
Modification and checking of existing foundations for platforms, pipe racks, piping supports, etc.
Preparation of design reports, documents, drawings, detailing, job norms and progress reporting.
Coordination of engineering and project group/client meeting, inquiries, site surveys, etc.
Preliminary bid engineering and drawings.
May 88 - Apr. 91 SEMI-CONDUTOR COMPLEX LTD.
Hyderabad, India
Position: Civil/Structural Engineer
Involved in design and analysis of civil and steel structures foundation, substation tanks, foundations, retaining wall, etc.
Projects Involved:
1. RCI (Defense) Project
Research Center Imarat, India.
Main technical building, sub-station underground water tank, cement storage, nitrogen plant, DI plant and cable bridges.
2. DRDO (Defense Research Dev't. Organization)
Mortar transport garages (Shell Roof), Sports Complex, Offices mess, JEO's mess. DSE complex, effluent water treatment plant, cable trenches, etc.
COMPUTER SKILLS:
ADOSS - Flat Slab Design
PCA (Mat) - Mat foundations
PCA (Columns) - Columns analysis
PCA (BEAMS) - Beams Analysis
STAAD-III - Structural Analysis And Design
MICRO STATION (INTERGRAPH) - Drafting Software
CAESAR-II - Piping Stress Analysis Software
Primavera & Microsoft Project - Project planner
Microsoft EXCEL - Spreadsheet Software
Microsoft WORD - Word Processing Software
View contact information... |