CONTACT INFORMATION:
View contact information...
Educational Qualification:
Passed Bachelor of Engg (Mechanical)
With First Class Distinction in the year 1996.
Professional Achievements: -
Working Experience with INTERGRAPHS' PDS-3D and
CAD-CENTERS PDMS in various aspects of Basic and Detail Engineering including
Project Planning and Implementation right from Devlopment of Plot Plan,Equipment Layout,
Piping Layout,Nozzle orientations,to Isometrics,Design Review and Material Take off.
Creating Respective Discipline Models in PDS-3D, Customizing Isogen Set-up.
I Had Worked as a PDS Co-ordinator at
"Reliance Petroleum Limited " Refinery Site at Jamnagar along with Bechtel Ltd
Utilizing Intergraph's PDS-3D software & its alias products including Design Review,
Material Management Programs Such as Pipe-works (which uses Piping Data in
PDS-3D models) & Spoolgen which then lead to (PTS) Procurement Tracking System.
I have been working in PDS Piping on Refinery, Petro-Chemicals, Process Industries,
Mining & Polyester projects.
Also Worked on CAD-CENTER'S PDMS for Xytels Polypropylene Project as Lead Engineer.
Working Experience & Technical Skills: - Six & Half Years.
Currently working as "Senior Piping Engineer" in "Kvaerner Power Gas Ltd"
An Branch of "Kvaerner Inc" With Experience in: -
Preparing Piping Specifications Designing and checking of Plot Plan,
Equipment Layout & Sections,Piping Layout Considering Safety,Functionality and
Cost-Effectiveness including Rack-Piping,Isometric Checking W.r.t P&ID's and
Layout,Inventory Material Control and Planning.
Piping Designing including Jacketed Piping,Rack-
Piping, Slurry and Dowtherm Piping,Stress Critical Piping.Preparing & Checking of
Equipment Layout,Nozzle Orientations.Support Layout including Support Designing.
Conversant with Flexibility & Stress analysis of Dowtherm Piping, Steam Piping,
Process Piping,Pump Suction & Discharge Piping using CAE-PIPE, CAESAR.
Undergone "QUALITY TRAINING " related to Quality checking of Piping Documents as per ISO 9001 requirements and Familiar with International Codes and Standards including
ASME, ANSI and other Piping Standards.
Software Experience: --
Operating System: - Windows NT, Windows 95,98
Drafting Packages including AutocaD Rl 14,Bentleys Microstations,
MSOffice (Excel,Word,Access,PowerPoint),Autoview, Lotus Smart Suit etc.
Model Tracker a Customised Software of Bechtel Ltd to produce Progress-Reports
(Crystal Reports)For Clients and to identify Potential Bottlenecks of Turnkey Projects.
Assisted in Development of In-house Piping M.T.O Software, Support M.T.O and Support Selection.Program.
Specialized Training: -
INTERGRAPH'S PDS -3D (Plants Design System) And its alias Packages including: -
Piping Designer, Equipment Modelling, Drawing Manager,
Isometric Manager using Isogen-Interface,Reference Data Manager, Project Administration,
Interference Checker Manager,Report Manager PDS-Stress Analysis Interface.Design Review
Checking Including "Walk-Through".
CADCENTRES PDMS –3D Software for Basic & Detail
Engineering including Review Reality.
Projects Worked:-
Kvaerner Power Gas Ltd: -
Reliance Industries NG3-PET Plant
Currently Working For Reliance Industries NG3 PET plant Which is Based on Dupont Technolgies Process for making Bottle Grade Chips including Support Design and Detailing for both SSP and MELT Area, Supporting for IBR System, PET Pneumatic conveying Line usuing Review Reality.Preparing Special Pipe Supports.
Reliance Bio-Tech Ltd: -
Completed Bio-Tech Project For Reliance Life Science at TIFIL as Lead Engineer
Including Preparing Piping and Valve Specification Preparing Equipment, Piping Layout for Utlity Rooms,Clean Steam Generator,RO System, Soft Water and Purified Water Plants, Autoclave using
ASME BPE-1997 & FDA Standards.
POM Plant For Kaneka Engg Japan.:-
Had been Deputed to Japan To work for Kaneka Engg including Preparing
Bid Package including Study of P&ID, Equipment layout, Preparing MTO For Exotic Material including
Hastalloy,Monel Metal, for 6000T/Y Plant for Polyplastic Asia Pacific Ltd. Discussion with Vendors and Clients Review Meetings.
Reliance Industries Ltd: -
Worked as Area Lead Engineer on Polyster (POY,PSF & Chipper)
Plant for Reliance Based on Dupont Technology for POY and Zimmer Technology for PSF including Equipment Layouts,Piping Designing,Piping Spec and Technical Bid Analysis.Utility Flow Distribution
Isometrics and Material.Take-off.Total Capacity of Plant 280 TPD POY & 120 TPD PSF.
Xytel Corporations Ltd: -
Worked for Exxon and Xytel Corporations Oil-Injection System For Polypropylene
Production Unit on CAD-CENTRE'S PDMS including Equipment Layout,Piping-Design, Support Modelling Review Using Review Reality,Isometrics and M.T.O.
Kvaerner Metals Inc (USA): -
Worked for 'Kvaerner Metals" an Branch Of "Kvaerner Inc" at
California (USA) On an Apex Silver Mines San Cristobal Silver & Lead Mining Project in
Southern Bolivia With total capacity of Processing 40,000 tones of ore per day.Processing included primary crushing,SAG Ball Milling, differential floatation to produce separate Concentration of
Silver & Lead using Intergraph's PDS-3D. Involved in Designing Of Equipment Layout,Piping Layout,Nozzle orientations,Isometrics and Material Take off..Worked as PDS-Coordinator.
Chemtex Engg of India Ltd
IOCL Guwahati Refinery: -
Worked on IOCLs Refinery units along with EIL,,Sertechniggi including M.T.O (Oracle Based Program) Preparing & Loading Piping Specifications.Checking and Reviewing Equipment Layout, Piping Layout,Isometrics.Support Designing and Checking including
Support Modelling & Support M.T.O.Design Review Auditing,Interference & Clash Checking.
BVPI's Sulphur Recovery Plant: -
Worked on "BECHTEL-TECHNIP"
Joint Venture Project(Sulphur Recovery unit )including Piping Design and Checking,
Pipe Support Designing and checking including Special supports.Spring Installation
Drawings. Managing Piping Specifications and Loading those on to PDS Database.
Extracting Piping M.T.O.
Montifibre Polyester: -
Worked with Snamprogetti (ITALY) for 450 TPD
Polyester Plant including Basic and Detail Engg Study,Preparing Piping Specification,
Equipment,Piping Study and Designing,Preliminary and Final M.T.O.Support Designing and
Checking, Interference Checking and Resolving Clashes.Design Review.
Reliance Petroleum Ltd.: -
Worked as a PDS Coordinator on Worlds Biggest
Grassroot Refinery of "Reliance Petroleum Ltd."at Jamnagar Site along with the Bechtel
Sharing Responsibilities of Site Co-ordination including Site Queries,Site change requests,
Construction Progress and Planning using Design Review.
Project Administration,Updation and management of Reference Database received from affiliate Design offices including Texas, London,
New Delhi.Troubleshooting Database and Isometrics Extraction Problems.
Piping [Designing & Checking] of Refinery Units including "Captive Power Plant"(330MW),
"Fluidised Catalytic Cracker",Aromatics Complex,Crude Distillation Unit and extracting customised Isometrics and Bulk M.T.O.
Coordinating with "Pipeworks Software" (ORACLE as Backend )
Dept, Spoolgen dept,to extract M.T.O. & place Material order through P.T.S. (Procurement tracking system).Extracting clash reports of Piping against other Disciplines Using
"Interference Checker Manager" & further Resolving clashes,
TATA Chemicals Ltd Ammonia & Urea Plant: -
On Site Detail Engineering including
Piping & Equipment Modelling of "Naptha Pre-Desulphurisation Unit" of Urea Plant.
Spec writing and Loading them in PDS Database of above
Urea Plant original Specs were of "Haldore-Topsoe" (USA) for Ammonia and "SNAMPROGETTI"(Italy) for Urea.
Far Eastern Textile Ltd Taiwan: -
Pipe Support Designing and Checking Including Support
Selection according to Load and Piping Configurations, Designing of Special Supports & Spring
Installation Drawings, Preparation of Hanger Load Orthographic Drawings used as input for Civil
Structure. Customizing Clash Reports. Preparing Design Review Sessions and Walk-Through.
References will be provided on request.
View contact information... |