CONTACT INFORMATION:
View contact information...
CAREER SUMMARY
Twenty-Nine (29) years of experience, working under various international companies in Middle East, Europe and in South East Asia countries.
* Highly professional with strong communication and leadership skills. Well organized with flexibility and common sense. Work independently under pressure and adaptable with multi national personnel at all level under different environmental conditions. Assigned on both onshore and offshore as Client, Main Contractor under Project Management and Engineering Team.
* Conversant on the application of the Quality system administration based to ISO 9000 series.
* Well versed in interpretation and implementation of AWS, ASME, ANSI, ASTM, API, BS, ABS RULES, DNV and others classifying body's codes and standards.
* Computer literate in WIN 95/98,Office 2000,MS XP and Internet task.
POSITIONS HELD
- Construction Engineer (Topsides + Marine)-Structural/Piping/Mechanical
- Piping Engineer / Supervisor
- Mechanical Commissioning Engineer / Superintendent
- Mechanical Engineer (Rotating / Static)
- Project Site Coordinator / Company Site Representative
- QA Manager
- Inspection Engineer (Section Head)
- QA/QC Engineer
- QA/QC Supervisor / Inspector
- Validation Engineer
PROJECTS ATTENDED
- 4 to 10 legged Jackets, Decks and Modules.(More than 150 units)
- FPSO, FPU, FSO Conversions.
- Topside Platforms, Pipelines & Pile Driving.
- Coating & Pipe Laying.
- Pressure and Non-Pressure Vessels.
- Storage Tanks with up to 1 million barrel capacity each.
- Cargo and Lay Barge Conversions.
- Nuclear and Thermal Plants.
- Refinery & Chemical Plants.
- Pharmaceutical Plants.
INVOLVEMENT ON ONSHORE / OFFSHORE PROJECT PHASES
Procedure Generation, Test Package Generation, Material Procurement, Design Verification, Fabrication & Welding, Construction & Erection,Inspection, Testing & Painting,Pressure(Hydro/Air/Leak) Testing,Equipment Preservation,Maintenance & Operation,Audit,Load-out, tow-out and Sea Trials,Hook-up & Installation,Equipment Installation,Platform Modification,Tie-in & Riser Installation,Pipe Laying and Pigging,Pile Driving & Shore Pulling,Dewatering / Nitrogen Lay-up,Installation Qualification(IQ),Operational Qualification(OQ),Start-up & Commissioning,Documentation Control
WORKING EXPERIENCED
July 2004 to Present
TOTAL ELF FINA - Pasir Gudang, West Malaysia - Mechanical / Commissioning Engineer
Kpono Oil And Gas Export Amenam Phase 2 (AMP2) and AMP1 Upgrading Projects For Elf Petroleum Of Nigeria Ltd.Work with Client as part of Project Management Team (PMT).Project involved are 8 legged Jacket,9000 metric tons AMP2 Topside Platform and 1400 metric tons AMP1 Compression Module.
Follow-up all Mechanical related activities covering planning, preparation, installation and pre-commissioning. Ensure contractor's compliance with design and Project specifications. Review and comment on Contractor documents, on planning updates and critical path for all activities related to mechanical works. Detect all possible delays and constraints and propose remedial action. Liaise with other disciplines to ensure consistency of the work. Review and comment on Contractor documents. Prepare mechanical related daily and weekly reports.
Review for approval Equipment Offloading and Installation Procedures. Planning of equipment installation sequence. Ensure that all pre-installation requirements were met prior to lifting and final installation of equipment. Updates all mechanical records into database. Supervise the daily site activities of Contractor and Vendor Representatives. Vendors include Rolls-Royce for Turbo Generator, THERMODYNE for Gas Compressors, SULZER for Water Injection Pumps. Witnessed pressure test, flushing and blowing. Generates on site punch list. Signing off of final leveling, alignment reports, vessel closures certificates and punch list clearing. Monitor check sheets and test sheets performance during pre-commissioning. Establish an efficient working relationship with Contractor personnel Attend weekly/monthly HSE meeting on site. Attend toolbox meetings and participate in Safety tours of yard. Ensure that all incidents and anomalies related to Mechanical are properly reported and analyzed. Ensure that HSE and QA procedures are properly implemented. Reporting directly to Construction Manager.
Sept.2003 - July 2004
SCHERING-PLOUGH LTD - Singapore - Commissioning Engineer
Pharmaceutical- Multi Product Plant Phase-2 (MPP-2) Project.
Work with Client. Project involves the 6-storey building including the offsite structures which compose of several pharmaceutical machinery and equipment.
Participate in system/safety walk down and generate / clear punch list as required. Pressure /Leak test of systems. Commissioning and start-up in charge of several designated systems such as but not limited to Plant/Breathing/Instrument air,Process,Potable Water, Hot Water, Chilled Water, Steam and Condensate, Process and Hydrogen Vent, Tetrachloride and Borane.
Coordinate with Validation Group for IQ and OQ related issue. Implement the GMP and maintenance of Commissioning Dossiers. Raised Field Design Change Notice (FDCN) as required. Review and sign-off Mechanical Completion Dossiers, Precommissioning and Commissioning Dossiers. Reporting to Commissioning/Validation Manager.
Nov.2000 to August 2001
JACOBS LEND LEASE PTE.LTD. - Singapore - QA Manager
Schering Plough Biotech And Tablet Facilities Projects. Managed the Main Contractor QA Department involving 27 Sub Contractors with 7 QA/QC personnel directly under my supervision. Review / generates / approved the Company Project Quality Plan. Review / scrutinize / approved the Field Design Change Notice (FDCN), Contractors quality and Inspection Test plans. Monitor and maintain Good Manufacturing Practice (GMP). Coordinate with Validation and Commissioning groups on IQ and OQ activities. Reporting directly to Project Manager.
Nov. 1998 - Nov.2000:
MARITIMA OVERSEAS INCORPORATED - Singapore
November.1998 to September1999 -Project (Site) Coordinator /Company Rep.- (P-37, P-38, P-40)
September 1999 to January 2000 - Construction Supervisor - Onboard P-37
January 2000 to November 2000 - Commissioning Supervisor - Onboard P-40
FPSO P-37, FSO-P-38 and FPU P-40 - Conversion For PETROBRAS at JURONG SHIPYARD. Work for Main Contractor. Assigned in several sub- contractor yards during the fabrication, construction, testing, painting and installation of topside facilities involving 8 modules, 35 pressure vessels. Responsible in reviewing for approval all construction, inspection and testing procedures, personnel evaluation, raising queries, daily management of site activities, audit and evaluation of project performance and documentation control. Identify and monitor all extra works. Witnessed and approved painting, pressure testing, chemical cleaning, flushing and borescope inspection. Interpret RT films. Liaise with contractors and to our management all contractual issues as required. Reporting to Construction Manager.
ONBOARD P-37, Supervised and monitored the shipyard contractor activities during the hook-up and installation of topside facilities involving modules, various equipment, tower cranes, erection of structural and piping components. Oversee the preservation of equipment and instruments. Lead the team of 12 personnel overseeing maintenance of equipment and instrument, generation and clearing of punch list, mechanical alignment, flushing, and pressure testing works. In charge of material procurement from warehouse and onboard personnel allocation. Work extended up to vessel sea trial. Coordinate with Shipyard Manager on all onboard work related matters. Reporting to Construction Manager.
ONBOARD P-40, Lead the team of 6 Mechanical personnel. Supervise and monitor thousand of valve tightness check (VET), calibration and function test of valves and instruments. pump electrical parameters and alignment, Verify completeness of all pipeworks prior to commissioning. Start-up and commissioning of utilities and process systems, emergency generators, and HVAC units, Reporting to Commissioning Manager.
Aug. 1996 - Oct. 1997:
MC CONNELL DOWELL (SEA) PTE.LTD. - Singapore - Piping Engineer
Upgrading Of Du Pont Adi-Pure Chemical Plant At Pulau Sakra-Singapore
Lead the team of 23 construction crew including 2 supervisors for construction, coordination, supervision and monitoring of piping related works. Generate the weekly work schedule and manpower allocation. Material procurement as per Isometric MTO, raising engineering queries, updates the as built drawings. Monitor, implement and coordinate with construction group to enhance the progress with in the schedule. Reporting directly to Construction Manager.
May 1996-July 1996:
PLANT ENGINEERING PTE.LTD. - Singapore - Mechanical Superintendent
Extension Of Make-Up Gas Compressor For Mobil Refinery And Upgrading Of Hydro Cracker And Crude Distillation For Shell Refinery. In charge of 30-construction and inspection team during shutdown and maintenance works. Plan and schedule sequence of line hydro testing. Responsible for work scheduling and progress evaluation, manpower allocation, material procurement and safety related aspects. Reporting directly to Project Manager.
Aug. 1995-April 1996:
ALLSEAS ENGINEERING B.V -Singapore - Piping Supervisor
Conversion Of Bulk Carrier "Solitaire"To Pipelay Barge At Sembawang Shipyard -Singapore. Working with the owner. In charge and supervise the pipework activities covering 4 engine rooms and cargo hull areas. Responsible for material procurement, manpower allocation, coordination with the inspection and construction group. Witnessed system pressure testing and chemical cleaning. Reporting to Piping Superintendent.
all inspections related report
Nov 1994 - Dec 1994:
EUROPEAN MARINE CONTRACTOR (EMC)-Spain - QC Engineer
EMPL-EUROPE 90 kms.22“ diameter Submarine Line From Gibraltar Spain to Morocco Onboard Castoro 6 and 2.Working with the Main Contractor. Monitoring of shift welding activities including parameter check and generates daily report.
Nov. 1993 - June 1994:
EUROPEAN MARINE CONTRACTOR (EMC) - China - - QA/QC Engineer
ARCO China 707 kms.28"Dia.Hong Kong Trunkline and 100 kms.14"dia.Hainan Island Pipeline Onboard Semac-1.Working with the Main Contractor. Monitoring of shift welding activities including parameter checks and generates daily report.
March 1992-June 1992:
EMC - SAIPEM JV - North Sea - QA/QC Inspector
On Board Semac-1, worked for the Main Contractor- EMC/SAIPEM during pipelaying of 25 kms.40"diameter ZEEPIPE line for STATOIL of Norway and 30 kms. North Beryl Gas Pipeline for MOBIL SAGE OF U.K. Welding inspection including parameter check. Generates daily report.
January 1980-October 1991 Twelve (12) Years Service
National Petroleum Construction Company, Abudhabi, U.A.E.
- Construction (Field) Engineer / Company Representative
- Inspection (Qa/Qc)-Engineer / Section Head
Construction Engineer (Structural/Piping) /Company Site Representative
Represent the company on off based projects during the fabrication and construction of 4 wellhead platforms for TOTAL ABK at Gulp Piping Company yard. Production Platforms offshore modification in ZADCO field onboard SEP 250 in U.A.E, pile driving, installation and hook-up of jackets, wellheads and heli decks in Zakum field and Separator platform in BUNDOQ field onboard CB3 in QATAR. pipelines and shore pulling of ARAMCO projects in Abu Ali, Jubail, K.S.A.
Responsible on Site Project Management and Engineering of contractor scope of works, provide supports and technical assistance on contractual matters, material procurement, review and approval of extra works, control of manpower supply, monitoring and generation of progress and performance reports. Reporting directly to Project Manager.
Inspection (QA/QC)-Engineer / Section Head
Covering both onshore and offshore. Directly supervise several Inspectors, technicians and clerical personnel during the fabrication, construction, load out, hook-up and installation works at Sadiyat Fabrication Yard and several onshore and offshore oil fields with in U.A.E, Qatar and K.S.A.
Responsible on the preparation and generation of PQR, WPS, QC plans, Implementation of QA Manual, QA/QC Procedures and pressure testing procedures, auditing, works scheduling, personnel allocations, personnel recruitment, training, performance evaluation and documentation control. Monitor the ongoing inspection and pressure testing activities. Coordinate with project department and Client representatives. Reporting to QA Manager.
COUNTRIES ASSIGNED and CLIENTS:
* UAE Clients: ADNOC, ADCO, ADMA OPCO, ZADCO, BUNDUQ COMPANY LTD, TPG, ADOC, YEPCO/CCICL/GULF INTERSTATE, TOTAL, APSL SERETE, UDECO, WORLEY ENGINEERING, AMERADA HESS AND F.R. HARRIS.
* Qatar Clients: CCICL, QGPC, TPG and BETCHEL.
* KSA Clients: ARAMCO and AOC (Arabian Oil Company).
PROJECTS ASSIGNED:
ONSHORE:
* Fabrication, Construction, Modification, Mechanical Installation, Inspection, Testing and Pre-Commissioning of 140 to 150 units of offshore structures such as Piling, Jackets, Decks, Modules and other topsides facilities at Sadiyat Fabrication and Contractor yards in Abu Dhabi, U.A.E.
* Fabrication and Construction of Single Point Mooring (SPM) buoys for. Das Island
* Fabrication of Gas Recycling and Injection System structures for Habshan Gas field.
* Fabrication of sub-sea "PLEM"(60'x30') for Yemen offshore facilities.
* Fabrication and Construction of 4-nos.1 million bbl capacity each Crude oil floating roof storage tanks at Jebel Dhana.and Tank No. 5 at Zirku Island U.A.E.
* Material inspection of pipes at Al Qhatani Yard Dammam and Rastanura Port K.S.A.
* Pipe laying and hydro testing of 4", 8" and 10" Diameter of 150 kms. spur lines at Dukan oil field, Qatar.
* Pipe laying, shore pulling, hydro testing and nitrogen lay-up of 20" diameter main line at Abu Ali Island, Jubail, K.S.A.
* Trenching, concrete testing and pouring of pipelines in Dukan, Qatar and Jubail, K.S.A.
OFFSHORE:
* Pipe laying, pigging, nitrogen lay-up of thousand kilometers in accumulative lengths.
* Inspection, Pressure Testing and Commissioning
* Offshore Topside construction, modification, tie-ins, piling, installation and hook-up of well heads and its facilities in Zakum fields in U.A.E. and BUNDOQ field in QATAR.
* Activities carried-out on board SEP 250, DLB 1000, CB3, PLB 648, P-280 and ORELIA. Field covered are in U.A.E. (Zakum, Bundoq, Mubaras, Zirku and Das Island), in K.S.A. (Marjan, Berri, Zuluf, Abu Safah and Khafji) and in Qatar (Bulhanine oil field)
COUNTRIES ASSIGNED and CLIENTS:
* U.A.E Clients: ADNOC, ADCO, ADMA OPCO, ZADCO, BUNDUQ COMPANY LTD, TPG, ADOC, YEPCO/CCICL/GULF INTERSTATE, TOTAL, APSL SERETE, UDECO, WORLEY ENGINEERING, AMERADA HESS and F.R. HARRIS.
* Qatar Clients: CCICL, QGPC, TPG and BETCHEL.
*K.S.A. Clients: ARAMCO AND AOC (Arabian Oil Company).
PROJECTS ASSIGNED:
ONSHORE:
* Fabrication, Construction, Modification, Mechanical Installation, Inspection, Testing and Pre-Commissioning of 140 to 150 units of offshore structures such as Piling, Jackets, Decks, Modules and other topsides facilities at Sadiyat Fabrication and Contractor yards in Abu Dhabi, U.A.E.
* Fabrication and Construction of Single Point Mooring (SPM) buoys for. Das Island
* Fabrication of Gas Recycling and Injection System structures for Habshan Gas field.
* Fabrication of sub-sea "PLEM"(60'x30') for Yemen offshore facilities.
* Fabrication and Construction of 4-nos.1 million bbl capacity each Crude oil floating roof storage tanks at Jebel Dhana.and Tank No. 5 at Zirku Island U.A.E.
* Material inspection of pipes at Al Qhatani Yard Dammam and Rastanura Port K.S.A.
*Pipe laying and hydro testing of 4", 8" and 10" Diameter of 150 kms. spur lines at Dukan oil field, Qatar.
* Pipe laying, shore pulling, hydro testing and nitrogen lay-up of 20" diameter main line at Abu Ali Island, Jubail, K.S.A.
* Trenching, concrete testing and pouring of pipelines in Dukan, Qatar and Jubail, K.S.A.
OFFSHORE:
* Pipe laying, pigging, nitrogen lay-up of thousand kilometers in accumulative lengths, tie-in, Topside construction, Modification, Pile driving, Hook-up and installation, Inspection, Pressure Testing and Commissioning on board SEP 250, DLB 1000, CB3, PLB 648, P-280 and ORELIA. Field covered are in U.A.E. (Zakum, Bundoq, Mubaras, Zirku and Das Island), in K.S.A. (Marjan, Berri, Zuluf, Abu Safah and Khafji) and in Qatar (Bulhanine oil field)
Aug. 1976-Dec. 1979:
ENG'G. AND CONST'N CORP. ASIA (ECCO-ASIA)- Philippines - Quality Control Engineer
Undergone an on the job training / course on all types of NDT such as RT, UT, MPI, DP as per ASNT-TC-IA, Stress Relieving and Destructive testing intended for Nuclear Plant Project sponsored by Westinghouse International (U.S.A.). Had been qualified as level - II on all types of NDT last 1979.
* Projects are; Construction of 650 MW NUCLEAR Power Plant-Philippines.
* Fabrication and pre-erection of 160 feet steel truss Bridge-Philippines.
* 18" Diameter Pipe laying owned by MISC-Philippines.
* Pipe coating of 18" to 72" Diameter at IPI, Philippines.
* Maintenance of power plant and Mill Digester-PICOP - Philippines.
PROFESSIONAL and TECHNICAL QUALIFICATIONS
* Mechanical Engineer-5 Years Course-Graduated 1975,W.I.T.,Iloilo,Philippines
* CSWIP Welding Inspector (Grade 3.1), Abington, U.K. since 1984 expired 1999
* Level 11 as per ASNT-TC-1A on RT, MPI, DP and UT
* Member-American Welding (AWS) U.S.A.
* Registered European Welding Federation (EWF)-Inspector Level 4 -Cert. No. EW/GB/00663
SEMINARS AND TRAININGS
* First Aid Training Level 2
TOTAL ELF FINA-Malaysia - (June 2004)
* Good Manufacturing Practice (GMP) Seminar.
* Good Documentation Practice (GDP) Seminar
* Certificate of Permit to Work Training.
Schering Plough Singapore - (September 2003)
Foster Wheeler Eastern Pte.Ltd. - Singapore (June 2002)
* SIC (Manhole) for Supervisor Training
MOM-Occupation Safety and health Center - Singapore (June 2002)
* Exploration of Project Web
Jacobs Lend Lease - Singapore (December 2000)
* Sea Survival Course
Oriental Maritime Center, Philippines (April 1995)
* Safety and Survival Course
Maritiem Training Centrum, Rotterdam, The Netherlands (April 1992)
* Industrial Uses and Application of Radio Isotopes Course (I.U.R.C.)
Philippine Atomic Energy Commission (PAEC), Quezon City, Philippines (May 1979)
* Effective Supervision and Human Relations
MSIC, Batangas, Philippines (March 1978)
* NDT Course (RT, UT, MPI and DP) as per ASNT-TC-1A.
ECCO ASIA, Manila, Philippines (August 1977 - December 1977)
* Welding Metallurgy and Weldability of Metal
Welding Institute of the Philippines, Baesa, Quezon City Philippines (December 1976)
* Supervisory Training Program on Leadership Technique
Dacongcogon Sugar Central, Bacolod City, Philippines (February 1976)
REFERENCES:
Available upon request
View contact information... |