CONTACT INFORMATION:
View contact information...
EDUCATIONAL QUALIFICATION
First Class Bachelor Degree in Electrical Engineering
From University of Calcutta
* Specialization in
Advanced Electronics & Relay for Automatic Protection
COMPUTER PROFICIENCY
MS Office etc.
PROFESSIONAL EXPERIENCE
Company M/S. SWEDPOWER INTERNATIONAL AB, Abu Dhabi, United Arab Emirates. (Consultant of Abu Dhabi water & Electricity Authority, ADWEA)
Duration February 2005 Onward
Designation Assistant Resident Engineer
Details Of Job Working as Consultant's representative for review, direct site supervision, testing & commissioning of various ADWEA projects for 220/33/11 KV GIS Substations.
Company: M/s. TOSHIBA CORPORATION, Japan. Manpower supply from M/s. National Technical Services Est., Abu Dhabi, United Arab Emirates
Duration: October 2004 to January 2005
Designation: Commissioning Engineer- Umm Al Nar Independent Water & Power Project
Details Of Job: Commissioning of MCC Panels, 11/0.433KV Transformers, 11KV SF6 Switchgears, DC Distribution Boards, UPS & Battery Chargers.
Company: LARSEN & TOUBRO LIMITED
B.P.C.L. Refinery, Mahul, Mumbai, India.
Duration: October 2003 to March 2004
Designation: Consultant Electrical Engineer
Details Of Job: Overall Responsibility for Construction & Pre-commissioning Of Sulfur Recovery Units of B.P.C.L. Refinery. This included Installation of 6.6 /. 415 KV transformers, 6.6 KV Switchgears, 415 V MCC & PCCs, UPS, MMI Units, HT & LT Cable Installation, Installation of HT & LT Motors, Area Lighting, Grounding Systems & Cathodic Protection. (Engineers: Engineers India Limited).
Company: NPCC, UAE / NSQ
Qeshm Island, Iran.
Duration: June 2003 To August 2003 (Left Due To Mother's Death).
Designation: E & I Engineer
Details of Job: Installation & Pre-commissioning of Electrical Equipments like 11 KV /6 KV / 3.3 KV
Switchgears, Transformers, UPS, Emergency Diesel Generators, Platform Lighting & Grounding System etc., E&I Activities for Fresh & Potable Water Packages, Fire Water Packages, Helipads, O/H Cranes etc., Instrument Activities for Well Head Panel, Installation of Field Instruments, DCS, PLC & ESD etc. for Construction & Pre-commissioning of Offshore Platforms (Process, Well Head & Living Quarters) for SOROOSH & NOWROOS Integrated Oil Field Project, Iran.
Company: Consolidated Contractors International Company S.A.L.,
Doha-Qatar.
Duration: January 2003 To April 2003 (Left Due To Mother's Illness).
Designation: Electrical Engineer
Details of Job: Installation, Testing & Pre-Commissioning of 145 MVA, 220/33 KV Transformers (Siemens), 10 MVA, 33/6.6 KV Transformers (Pauwels), 33KV GIS Switchgears (Siemens) and Post Laying testing of 220KV XLPE Cables and site survey and estimations for new sub-stations for Common Cooling Water Project for Ras Gas and IPP, Ras Laffan Power Company (RLPC).
Company: M/S. JAL International Corporation,
Jubail Industrial City 31961, Kingdom of Saudi Arabia.
Duration: April 2001 To March 2002 (Left Due To Completion Of Project).
Designation: Electrical Engineer
With Manpower Supply to:
M/S. ALJUBAIL FERTILIZER CO. (SAMAD) - a Sabic Group of Companies
Details of Job: Worked as PROJECT ENGINEER for various ongoing projects LIKE Fluid Bed Cooler Project for Urea Quality Improvement, Ammonia Debottlenecking Project, Electrical Revamping Projects, M.C.C. & Switchgear Replacement Projects etc. The job included preliminary study, preparation of specifications / checking & reviewing consultant's specifications & drawings, reviewing of technical bidding, conducting Factory Acceptance Tests of M.C.C, Transformers, Switchgears etc., execution of the jobs (Installation, Testing & Commissioning) on behalf of the Client (SAMAD) and attending any emergency major Electrical Breakdown.
Equipment Installed:
13.8 KV & 4.16 KV Switchgears (Siemens), 10 MVA 13.8/4.16 KV (ABB) and 1.5 MVA 13.8/0.480 KV (WESCOSA) Transformers, 4.16 KV Medium voltage controllers (SIEMENS), 480 V MCCs (SCHNEIDER & WESTINGHOUSE make), Conveyors, Diverters, etc.
Company: M/S. Petrofac International Ltd. (USA),
Mathura Refinery Site, Indian Oil Corporation Ltd., Mathura-281005, U.P., India.
Duration: March 1999 To March 2001
Designation: Senior Electrical Engineer
Details of Job: Overall In-charge of all Electrical & Part of Instruments activities for Turnkey (EPIC) Project for Sulfur Recovery Unit at Mathura Refinery, Indian Oil Corporation Limited. (Engineers: Engineers India limited).
Company: M/S. Specialized Oil Services - Asahi Techneion Co. Ltd.,
P. O. Box 4697, Doha, Qatar, Arabian Gulf.
Duration: July 1996 To August 1998
Designation: Electrical Engineer
With Manpower Supply to:
1. M/S. BELLEI Spa., Italy, Mesaieed, Qatar.
Worked as Commissioning Engineer for commissioning of QAFCO III (Qatar Fertilizer Co.) Expansion Project. (Engineers: Uhde-Belleli-Interbeton)
Details of Job: A. Commissioning of:
* VDU Controlled System for Electrical Operation (Honeywell Micro TDC3000).
66/11KV, 11/3.3KV, 11/0.4KV & 3.3/0.4KV categories Transformers (ABB).
* 66/11/3.3 KV SF6 Breakers (ABB), 66KV Gas Insulated Indoor Sub-station, 415V Switchgears and MCC. Etc.
* UPS and Battery Charger (EMERSON SICE).
* Diesel Generator (3 MVA) - Fincantieri-Ansaldo and Gas Turbine (45MVA) - Thomassen BV (Frame-VI) with GE Speedtronic Mark-V Control.
* Cathodic Protection (Sacrificial and Impressed Current), Trace-Heating of Pipelines etc.
The activities also included the Site System Review and design for modification as per systems/plants necessities.
B. Post Commissioning Trouble-shooting of:
Above-mentioned equipment and also of pumps, analyzers, level gauges and other instruments including PLC and DCS.
2. M/S. Qatar General Petroleum Corporation, Qatar.
(From October 1997 to August 1998)
Details of Job: Design, Execution and Commissioning of plant modification and Up-gradation of systems and equipment in the NGL (Natural Gas Liquefaction) Plants for HV/LV Switchgear, MCCs, Motors, MOVs, Cathodic protection System for Pipelines, Vessels and Tanks, Lighting and Illumination Systems etc., preparation of Scope of Works for Service, Tendering & Evaluations etc.
Company: M/S. Abdulla H. Al-Shuwayer
Kingdom of Saudi Arabia
Duration: June 1995 to July 1996
Designation: Electrical Engineer
Worked in the construction and commissioning of Gas and Oil Separation Project of Aramco Project at Haradh, Saudi Arabia.
* Engineers: M/S. Babcock King Wilkinson S.A. Ltd.
Duties: Installation of cable trays and conduits, laying of HV, LV, and Instruments & Fibre Optic cables. Installation of 13.8KV Switchgears with Vacuum Circuit Breakers, M.C.C., UPS. & Battery Chargers. Installation of 50 MVA 115 /13.8 KV, 5 MVA 13.8/4.16 KV & 4.16/0.4 KV Transformers and other substation accessories including 115KV SF6 Circuit Breakers. Installation of Earthing System and Cathodic Protection System (Sacrificial Anode & Impressed Current). Installation of HT and LT Motors.
Company: M/S/ Costain Abu Dhabi,
Abu Dhabi, United Arab Emirates
Duration: March 1992 To March 1993
Designation: Electrical Engineer
Worked in the Construction & Commissioning of
* Adgas Sulfur Project of LNG Plants in Das Island, Abu Dhabi.
* Engineers: M/S. Snam Progetti for OBL & M/S. R.M.Persons for IBL.
Details of Job: Laying of HV&LV power cables, control cables, installation of, Motors & Control Stations, Lighting & Small Powers, Installation of Battery Chargers, UPS., Interposing Relay Panels, IDB.s etc., installation of Lightning Protection, Earthing System & Cathodic protection, installation of HT & LT Motors and 11KV Indoor Substations. Also worked with M/S. Cegelec in Adgas Power System Integration Project in Das Island.
Engineers: E. Bank
Details of Job: Laying of HV cables (11KV) &LV cables including Control & Fibre Optic cables, Installation of UPS, Interface & Control Panels etc.
All jobs were executed in Zone 0, 1&2 of Hazardous Areas and had undergone Adgas Safety Training.
Company: West Bengal State Electricity Board, Salt Lake, Calcutta &
Power Development Corporation Ltd., Calcutta
Duration: Jan.79 to Feb.92
Designation: Manager (Electrical)
Details of Job: Handled independent charges in the construction, commissioning, testing and maintenance of the electrical equipments (detailed below) in the Thermal Power- Stations (200MW Units), EHV Substations and Transmission Wings.
Equipment & Accessories Installed & Commissioned:
25KVA to 500KVA 11/0.4KV, 1MVA to 5MVA 66/11KV, 10 MVA 66/33/11 KV, 20 MVA 132/66/11 KV Auto transformers, 105 MVA 400/220/33 KV Single Phase Auto transformers, 250 MVA 13.8/400KV generator transformers, 33KV SF6 Breakers, 132KV and 66KV M.O.C.B., 220KV, A.B.C.B., and 400KV SF6 Breakers, 6.6KV & 11 KV Breakers, C.T, P.T. and C.V.T., 400/415 V M.C.Cs, L.V. and H.V. motors up to 6.6KV, Installation Of PILC, XLPE 33 KV and 11 KV cables, 6.6 KV XLPE and FRLS cables, & 415/1000 V PVC, XLPE and FRLS cables, Relays and Control Panels for various kind of outgoing and incoming feeders installed in 11KV, 66KV, 132 KV, 220 KV and 400 KV substations, Battery Chargers 48 V, 110 V and 220 V categories, 110 V DC, 220V AC Distribution Boards, Installation of Earthing Systems for Substations and Power station, Erection of 66KV, 132KV and 400KV Transmission Lines & towers.
I hereby assure that the information provided above is correct to the best of my knowledge.
View contact information... |