Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #41382 next resume »»
CONTACT INFORMATION:
View contact information...

JOB OBJECTIVE
* Position as a Piping Specialist Engineer with a focus on Project Coordination and Team Leadership.

SUMMERY OF QUALIFICATIONS
* Experienced in the field of Piping Stress analysis, Piping Engineering, PDS usage
* 12 years of experience as a highly organized piping engineer, effective at multitasking and working under pressure to accomplish over all objectives
* Strong and positive communicator when working with clients from any country around the globe
* Well organized; able to prioritize and generate results to achieve organizational objective within time and budgetary expectations maintaining the quality
* Exemplary problem solving skills, able to identify problem and implement correctives processes

EDUCATION
* Bachelor of Power Plant Engineering, Jadavpur University, Calcutta, (1990 to 1994)
* Awarded First Class with distinction, obtained 83% marks

PROFESSIONAL EXPERIENCE
2005-Pres. Mitsubishi Heavy Industries (MHI), Japan Specialist Piping Engineer
* Involved in the planning of piping & stress analysis for gas fired combined cycle power plants
* Handled procurement of packages like Tanks, Piping, Valves; prepared Specifications, evaluated the bidders, discussed with the bidders, prepared purchase recommendation, reviewed vendor drawings
* Developed general arrangement drawings
* Led a team for creating 3D model using PDS
Major projects handled: RPCL Ratchaburi Gas Fired Combined Cycle Power Project (2x700MW, Thailand)

1998-2005 Siemens Power Engineering (SPEL), Delhi/Gurgaon Lead Piping Engineer
* Planned piping in 3D environment using PDS for Thermal Power Plants, Combined Cycle Power Plants (single shafts & multi shafts), Nuclear Power Plants
* Stress analyzed high temperature, high pressure steam, water, gas, oil lines
* Performed Dynamic analysis for Main Steam lines & hot reheat steam lines to analyze the effect of pressure waves generated due to fast closing valves at the turbine inlet
* Prepared fabrication isometrics, Piping arrangement drawings, support drawings, MTO's
* Performed piping material selection, pipe sizing, thickness calculation, pressure drop calculation
* Led piping design team (as Lead Piping Engineer), trained fresh engineers, prepared detail piping schedule, allocated job to piping engineers

* Coordinated with German colleagues and site engineers for day to day quarries
Major projects handled: Olkiluoto Nuclear Power Plant (1x1600MW, Finland), Palos Single shaft combined cycle power project (3x400MW, Spain), Inkenderun Imported Coal Fired Thermal Power Plant (2x700MW, Turkey), Gibraltar Single shaft combined cycle power project (2x400MW, Spain), Az Zour open cycle gas fired power project (8x95MW, Kuwait), 2x900 MW Thermal power plant, reference plant consisting of large number of variants and options.

1995-1998 Tata Consulting Engineers (TCE), Bangalore Piping Design Engineer
* Selected pipe materials for various services, calculated pipe size, thickness and pressure drop.
* Prepared flow schemes for turbine cycles, steam, water, oil, gas & air systems
* Prepared piping layout drawings, isometrics, MTO's, detail hanger drawings
* Carried out stress analysis for high temperature, high pressure steam & water lines
* Prepared specification for HP piping, LP piping, Valves & specialties, Insulation, Electric heat tracing
* Reviewed bids, prepared technical & commercial bid evaluation and furnished recommendation to client, reviewed vendor drawings
* Assisted project execution and erection activities
* Prepared plot plan and general arrangement drawings
Major projects handled: Tata Electric Companies, (2x120MW TPP, Jamshedpur), Gujarat Industries Power Co. Ltd., (GIPCL- 2x125MW TPP, Surat), Siemens AG, Germany- Development of Reference Power Plant, (2x300 MW), Tata Electric Companies - Bhivpuri Hydro Power Project (3x24MW, Maharastra). Jindal Tractebel Power Co. Ltd., (JTPCL) - Toranagallu Thermal Power Plant (2 x 130MW, Karnataka), Ansaldo Energia SPA., Italy, Standard Reference Plant (2250 MW), Tata Electric Companies, (TEC), 500 MW Trombay Unit#5 & Unit#6, Misc. Services, Essar Power Ltd., Combined Cycle Power Plant (1x500MW, Gujarat)

1994-1995 Kolaghat Thermal Power Station, West Bengal Graduate Engineer Trainee
* Obtained training in operation & maintenance of a 210MW thermal power plant
* Supervised piping erection for 210MW plant

ADDITIONAL SKLLS:
* Computer knowledge: PDS tools (Piping Designer, ISOGEN, Drawing Manager, Interference Manager, Equipment Modeling, Stress Module, Report Manager, Micro Station, R-Halt, Pelican Forge), AutoCAD, Microstation, Stress analysis software's (CAESAR II, AUTO PIPE, TATA-CAPE, FLEXPRT, CAEPIPE, ROHR 2), Microsoft windows (Microsoft Word, Microsoft Excel, Microsoft Access, Microsoft Power Point, Microsoft Project)
* Codes & Standards familiarized with: American codes on Power piping, DIN, BS & IS codes
* Languages known: English, Bengali, Hindi Assamese, Japanese

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3001 to 3050 of 10017)Go to Search Parameters...
Brief Description
I am Mechanical Engineer with 18+ years of rich experience in the field of oil & gas industry.
HSE Officer with a background of over 19 years in handling safety, Health and Environment in large multi international Oil & Gas, Chemical and Construction Companies (industrial, power plant, petrochemical, marine facilities and heavy fabrication).
15 years of utility/specialty chemical management experience.
. I have strong leadership skills and proven ability to manage and motivate a team to achieve assigned results. Through my previous jobs, I have learnt to provide and maintain consistent high standards and service.
Presents and reports the project status to the top management.
I am expert in Mechatronics field.
As an ambitious, inquisitive, self motivated engineer, I have been working as a workover & completion engineer since 2004. Cementing, acidizing, fishing, drilling, offshore gas well completion, deep shore well completion are the main subjects of my experience.
Refinery / Utility Plant Operator
07 years extensive experience holding a various positions in different phase of the projects in the field of Instrument Pre-commissioning, commissioning, start up,
NG reforming, Shift convertion, Syn gas production, Diffferent types of pumps and compressors, heat exchangers, catalytic reactor operation
I am a Mechanical Engineer and have more than 6 Years Experience in Piping Design and Stress Analysis Engineering. I have worked with CAESAR II software in developing Piping Stress Analysis and I also have substantial experience in the design of interactive CAD software; Moreover, my job involves sp
GIS/CAD specialist
As Cathodic Protection Engineer in Power Plant / Oil & Gas Industries with about 7 years experience; having knowledge on diverse Construction/Engineering Design /Commissioning/Maintenance activities with extensive experience on Cathodic Protection with NACE Level II certification.
I am searching for a job as a pipping stress and supporting engineer in KL, Malasia and I am expert in using CAESAR II and PDMS and ANSYS soft ware
Mechanical / Electrical experience in Boilers, pumps, HVAC Systems, Compressors, steam systems and ancillary services, DHW skids, Chillers, Cooling Towers, Clean steam Boilers, Purified Water Systems, waste water, Low voltage Electrical Systems, Preventive Maintenance Systems.
A highly motivated, adaptable MSc graduate.
Plant operator
Surface well test engineer
I 'am a highly skilled Sr. Lead Operator, with a strong English language, highly motivated, always exceed my employers expectation, hold a 2 years Oil & Gas Handling diploma, various computer skills " SAP, Lotus, Excel, Access, Word, Process Net a semi HMI Building Progam.
Progressive EMS Paramedic Exp.
I have earned 20+ certifications and growing. Is attached to my resume.
Structural Designer With 9Yrs. PDS,Microstation & Autocad Experience
Work Experience: I have extensive experience in the repair, maintain and rebuild work with the following list of engines, etc. Wartisila (Varsa 32) Ulstein Bergen, (KVG12) Caterpillar, (D379, D398, D399, D3408, D333) Detroit Diesel, (in line 3-71,6-71,V-12) Lister, (2-3-4 Cyl.) EMD, (645s) Cummins
More than 25 years experience in electrical field.
Meticulous finance professional, current Controller of Mining Operations with twenty-two continuous years of challenging professional experience in the areas of audit, banking, accounting, cost control, budget, financial management and controllership. Hands-on executive.
I am a Piping Engineer experienced in Piping Stress analysis, Complete Piping engineering activities, PDS expertise. I believe that my enclosed resume will demonstrate that I have the characteristics and experience you seek.
Over 14 yr of experience in dealing with Automation, Instrumentation & control systems. 11 years in Project Sales. Working experience with Honeywell & Yokogawa. Presently, located at Doha, Qatar, working with Automation/IT Company.Handling DCS, PLC, FGD System,Field Instruments.
An Electrical Engineer with over 12 years of hands-on experience in Maintenance of Assets and Utilities in a Gas based Petrochemical plant and Integrated Steel Plant with Rich Managerial and technical capabilities in Installation/Commissioning and Upkeep of Electrical Equipments.
AWS, CSWIP 3.1 AND ASNT LEVEL II IN RT,UT,MPI & DPI
Pipe stress engineer with eight years experience.Software Caesar II.
8 + years Oil & Gas field experience in Instrumentation and Control engineering. Lastly Worked as Assistant Resident Engineer for Tyco Fire & Security, UAE
Electronic/Instrumentation Engineer with experience on Electronic control systems ,PLCs,Maintenance of Downhole instrumentation systems etc
11years experience in the field Mechanical Maintenance of Machine shop and Foundry
Gas turbine, Boiler, Water treatment, Oil and gas operator
To operate shutting down / starting-up the processing plant assigned to an Offshore / Onshore platform for collection, treatment & inward transmission to consumers of oil & gas. To mix chemicals, prepare the plant for routine / planned maintenance and carry out first line maintenance.
Condition monitoring Engineer with 7 years experience in oil and gas industry
I have been involved with many projects throughout these regions, from Heavy Construction, Platform Installation and Inspection IRM programs.Also I have more than 3 years experience in NDT/Welding Inspector in various project. I just recently pass my Subsea Insp. Controller CSWIP 3.4U(TWI-UK).
Piping, mechanical, stress analysis, nuclear
I have done Master from M.Sc. Chemistry. I worked in Shell Pakistan Ltd. as a Q.C.Analyst.
KNPC & KOC approved planning engineer for EPC projects,Involved in Planning and coordination for the KNPC GRTA- 2006 shutdownInvolved in Planning of Major Shutdown for KOC -GC 27
An experienced metocean engineer/hydrographic surveyor/GIS technician/coastal engineer seeking suitable positions in related fields
Welding and NDT Supervisor, Lifting Equipment Inspector
Subsea Pipeline & Riser Installation engineering with Offpipe or Orcina Software(Orca Lay, Orca Flex
Computer :
My expertise includes strong hands-on technical skills with ECLIPSE and MBAL software applications. I am highly skilled in EOS fluid characterization, well test analysis, reservoir modelling, manage mature reservoirs, well monitoring
Welding Superintendent: SSCL. DME (3years welding), WI (QA/QC) 1992, Safety Training qualified and 21 Years Experience (QA/QC Welding Engineer-01 Year; Welding Supervisor--12 Years; Welding Educator-04 Years; Welding Instructor-02 Years) in working with ASME, AWS, API standard in EPC Industries
WORKING AS ASSISTANT MANAGER - PRODUCTION / SHIFT INCHARGE IN A LEADING PETROCHEMICAL COMPANY AT IMPORT, STORAGE & HANDLING TERMINAL
DCS Control Room Operation In Hydrogen. LPG MEROX At World Largest Petroleum Refinery In Reliance Industries LTD
Ten (10) years of accumulated experience in construction engineering, project planning using Primavera P3 ver. 3.1 for more than six (6) years, and project management. Last seven (9) years with Saudi Arabian Oil Company (Saudi Aramco), Saudi Electricity Co. - Eastern Region Branch (SEC-ERB) and Saud
cartographer - gis
First   Prev   51   52   53   54   55   56   57   58   59   60   [ 61 ]   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com