Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #44043 next resume »»
CONTACT INFORMATION:
View contact information...

Designation: Drilling Supervisor

LANGUAGES:
Dutch (mothertongue)
English (fluent)
German (good)
French (basic knowledge)
Arabic (basic for communication)

QUALIFICATIONS:
B.Sc in Mechanical Engineering, obtained at Higher Technical College(HTS), Rijswijk, (Netherlands,1974)
Courses/Certificates: Int.Well Control Forum: surface installations /supervisor level valid APRIL.2007. Aberdeen drilling School.
Last Medical UK: 12 Dec.2005 (North Sea Medical Centre, Great Yarmouth)
Basic First Aid: expired
Nogepa Logbook in possession (Req'd for Holland only)
SHELL drilling courses incl. ROUND I+II
Offshore survival: expired
Fire fighting: expired.

COMPUTER LITERACY: Microsoft applications (NT, XP, Excel, Word, Powerpoint).

DRILLING SOFTWARE: Landmark's: Well Plan, Compass and Dimms.

Update: 01 Oct, 2005 – Present: Working for Tullow Oil / Dublin, Ierland. Assigned as DSV to their Operations in PAKISTAN.(landrig) and North Sea (Ensco 101 jack up)

Jan.'2001-Oct 2005 Working for Petroleum Development (Shell) Oman.
Drilling extended reach (up to 1600 m horizontal)
Multi lateral (2 to 4 legs) oil & waterinjector wells in North Oman. Plus workovers on Fahud wells. Experience with: setting of ABL's (Adjustable Borehole Liners), and Solid Expandable Tubing ( SET).Using Baker/Hughes RCLS,( Rotary Closed Loop System) Autotrak G3 drilling system and Andergauge Tangent Control System.(TCS)

Dec "2000 – Jan"99 No work performed.

Jan'99 - Nov. '98 Worked for KERR MC. GEE (Houston) in Yemen. Drilled
Well "Al Hayarin # 1" to a depth of 7.270 ft.with Nabors Rig 214. (block 51).

OBJECTIVES Qishn clastics and Intra Saar formation. Made extensive use of air and foam techniques. Prepared to spud well Tarim # 1. Was advised by Kerr Mc. Gee management to leave the country for fear of retaliation by Yemeni's army for the American bombardment on Baghdad/ Irak.

Nov.'98 - May'98 Commenced work for LASMO OIL PAKISTAN, drilled well K10
in Kadanwari field and spudded well "Badhra 2"in West Kirthar area (Balochistan).Foam and airated mud was used for 26"and 17 1/2" sections.

May'98 - March'98 Stand by (paid) for LASMO OIL Pakistan.

Feb'98 - Jan.'98 Worked for TOTAL in YEMEN with Bulgar Geomin as contractor (with LASMO's permission)

Dec.'97 Finished off a well for CLYDE PETROLEUM in Yemen.
(with LASMO's permission)

Dec.'97 - Sept.'97 Signed contract with LASMO OIL/ Pakistan and put on standby (no pay)

Sept.'97 - July '97 Working for OMV /PAKISTAN EXPLORATION Ges.m.b.H Drilling wells Khararo # 1 (Miano field) and Sawan # 1
(SW Miano field extension). See also Nov'96 - April'95

June'97 - Jan.'97 Working for SHELL EXPLORATION /Pakistan.
Drilled well Nurpur "A"in the Salt range / Punjab province. The well was drilled to approx 2.050 m with Sedco forex rig 23 (top drive). Extensive use of salt saturated muds and foam and cementing techniques.

Nov.'96 - April '95 Work over and drilling for OMV /PAKISTAN EXPLORATION G.m.b.H.an Austrian based company (Vienna). The company is drilling exploration wells in Block 20 (Miano field), Sindh Province Pakistan since 1993. Also involved in road and location construction, done by local company (Haji Ali Soomar). Average well depth 3550 m with hole temp at T.D. of approx. 350 deg F.
Main target gas bearing "B"sands at 3.300m. Drilling done with
KCL / HtHp mud system.

April'95 - Feb.'95 Started in Pakistan for TULLOW OIL/ Pakistan. Drilled shallow well in Block 21, 60 km of Indian border (Khandhkot)
The company, based in Dublin, is drilling shallow wells (max 1.700 m) with Sui main and Sui upper formations as target. The wells are gas producers with very high H2S percentage.

Feb.'95 - Oct.'94 No work performed. Relocated from Netherlands to Bangalore/ India.(wife of Indian origin)

Oct.'94 - June '93 Appointed as company representative for SMEDVIG IPR Netherlands to supervise the repair and cleaning of the Vertech sludge reactor drilled a year earlier under my supervision in Apeldoorn / Netherlands. Clean up and repair was carried out with a 90 ton Cooper 350 rig, contracted through Dowell Schlumberger.

June'93 - Dec.'92 Accepted a staff position as Base Manager for ABAN LOYD CHILES LTD, an Indian drilling contractor with it's Head office at Chennai / India. Responsible for the day to day running of one of their (3) jack up's "Griffin Alexander II", drilling in the Gulf of Bengal for ONGC. Wells were drilled in the RAVI field, offshore Viayawada. Terminated my employment as Chennai was found unsuitable for family to join.

July'92 - April '92 Worked as Consultant Drilling Supervisor for SMEDVIG IPR NETHERLANDS, drilling a shallow well for Vertech Treatment systems in Apeldoorn /Netherlands. The well was designed as sludge disposal well (sludge from water treatment plants in the area)with a depth of 1.200 m and a remarkable casing design.

April'92 - March '92 Worked as Consultant drilling supervisor, on a short term contract, for MYANMAR (Burma) SHELL B.V. The well, onshore Block G, 300 km north of Rangoon/ Burma had to be drilled to a depth of 5.200 m. The work was performed under the "Drilling in the Nineties "concept, with Deutag (Friesland) as Contractor.


March '92 - Feb.'91 Worked as Consultant on a landrig for CLYDE PETROLEUM NETHERLANDS. Drilled 2 wells in WAALWIJK/Netherlands
(former BP "Eindhoven concession")to a depth of 4.000 m with a max. deviation of 50 degrees. The wells were drilled with Deutag T 26 provided with Top drive system.
Operations were postponed until 1993 for further 3 D seismic surveys.

Feb.'91 - Jun '90 Worked for NEDDRILL, a major Dutch drilling contractor, on jack up's Neddrill 3 & Neddrill 7 as Rig Superintendent.The Rigs were operational in the Dutch and British sector of the North Sea.Operators at the time were NAM and TOTAL.

March '90 Worked as Consultant on Floating Production Unit "North Sea Pioneer" for HAMILTON BROTHERS OIL & GAS.Supervised the running of subsea wireline BOP's and Riser, in preparation of the running of flowgauges in well 13 of HBOG's CRAWFORD FIELD /North Sea.

Jan.'90 - Dec.'89 Worked as Consultant for PHILIPS('66) PETROLEUM ABERDEEN.Responsible for the supervision of a high temperature, high pressure well to 17.800 ft. The well was drilled from the Glomar Moray Firth I jack up in the CENTRAL NORTH SEA (JOSEPHINE FIELD) The Rig was modified with specially designed BOP's, a permanent Glycol injection system on the Choke Manifold, and a poor boy degasser with a low pressure trip out system. A Varco top drive was installed.

Nov.'89 - Oct.'89 Responsible as Consultant, on behalf of the ROBERTSON GROUP, for the drilling of a deviated well at B.N.F.L. nuclear site at SELLAFIELD / WEST CUMBRIA UK with stringent testing, coring and logging procedures. For the drilling operation all QA & QC procedures applicable to any work on a nuclear site were in force. The work was of a turnkey nature, executed by Boldon Drilling and Freezing.

May'89 - June '88 Worked as Consultant Drilling supervisor for SHELL EXPRO ABERDEEN on Platforms CORMORANT A and CORMORANT NORTH (both NORTH SEA) Initially relieved Shell supervisors on both platforms, then became resident supervisor on Cormorant North. (32 slots, 24 drilled). Experience with drilling deep (19.500 ft), high angle (max. 70 deg) wells,using conventional rotary assemblies and navigation systems, oil based mud, PDC bits and 7"/5"combined liners and multi packer completions.Vary well access programme to allow for frequent change due to concurrent demand between derrick, well services and production logging,all under my supervision. Workover operations including the use of coiled tubing for well kill, casing and tubing retrieval, fishing and window milling and side tracking. Extensive use of 2 7/8"and 3 1/8" toolstrings.

1976 - 1987: As S t a f f employee from SHELL INTERNATIONAL PETROLEUM CoThe HAQUE/Netherlands, I have been assigned to the following Shell Opco's, all on family basis.

OMAN: 1987 -1985 Assigned to PETROLEUM DEVELOPMENT OMAN as Drilling Supervisor,I was responsible for the drilling and workover operations on landrigs(south OMAN). Workover including open/cased hole gravel packing and the running of dual completions. Drilling conventional as well as air drilling. Gained experience with" moving" wellheads and heat saver tubing for wells designated for Enhanced Oil Recovery techniques. Experience with organization of rig moves.

SCOTLAND:1985-1983 On loan assigment to SHELL EXPRO ABERDEEN as Drilling Supervisor. Worked offshore on SHELL platforms BRENT Alpha, Beta, Delta, AUK Alpha and CORMORANT-N.
For detailed description of activities /responsibilities see period May '89 - June '88

BRUNEI: 1983–1980 Assigned to BRUNEI SHELL PETROLEUM as Driller, I worked on Tender Assisted Platforms and on landrigs.
Gained experience with dual completions including Gaslift systems and tubing conveyed perforation techniques.

QATAR: 1980–1977 Assigned to QATAR PETROLEUM and PRODUCING AUTHORITY as Assistant Driller. Worked offshore out of Doha on company jack up DANA and RIG 103(Santa Fe) with local Qatari labour. Duties included;operation of cement unit, bulk system,crane driving, deck foreman, roustabout pusher and stand in for Driller.

HOLLAND: 1976 –1977 Joint SHELL INTERNATIONAL PETROLEUM Co.and worked one year as Trainee Assistant Driller on Landrigs in Holland. Introduced to roughneck, derrickman, Mudman and Assistant Driller duties. At the end of this period a promotion to Assistant Driller took place, followed by a transfer to Qatar.

SUMMARY
Designation: Sen. Drilling Supervisor
Point of Hire /Nationality: Amsterdam / Netherlands
Years of experience in profession: 30 (started in oilfield 1976)
Trainee Assistant driller: one
Assistant Driller: three
Driller: three night DSV: one

View contact information...
«« previous resume next resume »»
Search Results (Resumes 851 to 900 of 10923)Go to Search Parameters...
Brief Description
Experienced, registered professional petroleum engineer with 20+ years direct petroleum-related experience. Two graduate degrees in Petroleum Engineering (Stanford University). Extensive management experience with senior technical professionals in all related disciplines.
Consultant in well stimulation, well completion, production operations and reservoir engineering. Designed and supervised: - Hydraulic fracturing and TIF, Western Siberia - Massive hydraulic fracture in very high temperature reservoirs - Matrix acidizing, acid fracturing, scale control
I put at your disposition 23 years of experience in the laboratory and field activities at PDVSA-Intevep, Research Center and Technological Support for the Oil Industry of Venezuela, with the drilling & completion and materials performance groups for production operations.
Petroleum Engineer
DSV with over 20 years experience.
Diploma of Associate Engineer (Telecommunication / Electronics Technology), Computer uses Certification in Software Application, Installation and Hardware troubleshooting with maintenance. Pakistan, Certificate of instructions on computer operating systems, Basic training of Radio mechanic
I am a Senior Process Engineer with 27 years of operation and process design experience in the oil and gas industry. I worked for Saudi Aramco for 23 years as a Senior Process Engineer in an NGL Plant, gas plant, & a refinery. I have B.S & M.S. in Chemical Engineering from University of California.
Chemical Engineer with experience operations/erection/commissioning of Oil and Gas,Large Chemical Complex
Conceptual design, front end and detailed engineering of process plants including preparing piping layouts , equipment layouts ,plot plan,Preparing and checking PDS 3D/Auotplant models,Isometrics,Pipe support and stress analysis,MTO,BOM,Manpower Management,to complet project within budget and time
Commissioning, Start up Specialist, Operations Supervisor, OJT, Proactive multi-skilled Team Leader with detailed knowledge of process plant/man-management. HND in Chemical Engg; Valid Offshore Pasport Holder.
I have experience with rotating equipment such as turbine, compressors, motorrs, pumps and gearboxes.
12 years of experience in various design, training and project planning activities which involves Static and Dynamic Stress Analysis of different Nuclear, Petrochemical and Pharmaceutical Piping Systems, Selection and Design of Pipe Supports, Piping Layout design, Isometric Drawings, Integrated Pla
Maintenance & Mechanical Commissioning Supervisor
Proect control enginner cost control and senior planner for EPC projects
Having 15 years of experience as as Design Draughtsman / Autocad Engineer in Oil & Gas, Petrochemical & Manufacturing industries.
QA/QC Manager Welding Engineer Offshore and Onshore
Drilling Excelence Manager for BP Trinidad & Tobago. 10 Years experience in BP as DE/SDE/Org. Capability Manager & Drilling Excellence Manager. 9 Years in Service Company with experience as De/project Manager/Proposal Manager & QHSE Manager.
Project/Engineering Manager, 24 yrs Experience in Oil & Gas (Indian Oil Corporation Ltd.) for Development of Terminals & Gas Stations. Projects involve conceptualizing, engineering, budgeting, estimation, tendering, procurement, fabrication, installation, testing, pre-commissioning and commissioning
Piping stress analysis, finite element analysis using ANSYS, Mechanical design, etc.
Experienced Country Manager, skilled in change and open to multicultural environment.
Design skills in steel and concrete of petro chem and power plants.
Production Engineer resume
I working for Schlumberger Achievement as Crew Chief Wireline Operator. I perform jobs in location. Working in a Team is one of my compliances, most jobs in Cased Hole and Open Hole, and report to Field Engineer
Coatings & Corrosion Engineer "NACE"
I am 44years old and right now I am still working at PT Pec-Tech Indonesia (RGMI Group), current position as “Senior Process Engineer”. Business line of this company is Engineering/EPC As you can see from my enclosed curriculum vitae; I have long and wide experiences (± 19 years) in Operation Pro
Licensed professional engineer with over twenty-seven years of structural design and deliverables production experience for Industrial, Commercial, Residential, Oil and Gas, and Transportation projects
Upstream and mid-stream experience(27 years) plus underground waste water injection
earned master of science at the University of Oklahoma in the subject of rock mechanics. He has been a professor of production, drilling, completion and stimulation for more than 14 years, and he had earned more than 12 years of field experience.
Ph. D. level Materials Scientist looking for a position in research and development of new materials and novel processes for fuel cell, or hydrogen related industry to apply my broad materials working knowledge, materials characterization expertise, equipment design, and patents development skills.
I am experienced in reservoir simulation and numerical modelling, foamy heavy oil flow, well testing analysis, production forecast, horizontal and multilateral wells, thermal recovery, water flooding, PVT sampling and analysis.
I have a PhD in Logistics Management and over 20 years work experience in shipping, logistics, supply chain management, airfreight, sea freight, container marketing & operations, port development & expansion, ship and air chartering, project cargo handling, freight forwarding, etc.
Skilled, knowledgeable, and experienced in organizational assessment, strategic planning, business process reengineering, organization design, and change management in oil and gas related operations including production SBU's, upstream and downstream R&D, MIS, and Finance
I have outstanding experience in the design of high-pressure gas transmission line and its associated facilities in valve stations and also a fuel gas supply line plus governor station to 1800 MW combined cycle power plant in South Korea.
A Procurement/Logistics/Admin Manager of 25 years experience in the O & G industry particularly with FPSO's. Has contracted in Thailand/Singapore/Malaysia/Nigeria/Libya/UAE/Qatar/Scandinavia/Europe.
 Over 21 years of experience in the Petroleum exploration Industry.  Have broad experience in the area of drilling and completion fluid design and formulation in on shore as well as off shore wells.
Senior reservoir engineer: 30+ yrs experience in N. America, S. America, and Europe. Denver-based. Available for contract work, long-term or short-term. Fluent in English and Spanish.
Drilling Specialist for 35 years. Postings have included Worldwide Drilling Manager, In-Country Drilling manager, Drilling Engineer, On-Site Drilling Supervisor and Drilling Consultant. Skilled in foreign start-up operations and training of Nationals.
A versatile and Innovative Chartered Accountant of Nine Years post Qualification experience and Eighteen years on the Job Practical Experience
Over 22 years’ professional experience in Conceptual, FEED, Detailed engineering and project management in Oil & Gas, Refinery, Petrochemical and Chemical projects.
Over 12 years (over 4 Years in Gulf Countries) in pre-commissioning and commissioning, start up, daily plant operation and shutdown activities for large oil and gas, refinery and petrochemical plants.
Project Engineer with Australian education, canadian experience and with very good project management skills.
Pipeline, Facilities and Project Engineer.
12 years experience in Warehousing and Logistics operations from in-bound to out-bound w/ purchasing function
More than 18 years of design experience in oil and gas production, gas processing, LNG Production, and projects of refinery, petrochemical and chemical industries. Specific experience in front end and detail engineering, process engineering/flow schemes development, process data sheet preparations
Good working experience on Instrument and control system
Senior Mechanical Piping / Stress / Equipment Engineer BS in Mechancial Engineering USA National
8yrs of working experience in the field of HVAC & Duct Manufacturing. M.S. from KFUPM. B.E. (Mechanical). Areas of Interest Heating, Ventilation and Air-Conditioning. Indoor Air Quality. Facilities Management (Inventory, Space, Maintenance,
QA/QC Enginner
PMO, Planning, Project manager, Program Director
Reliability, Maintenance, Planning and Material Engineer- Mechanical
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   [ 18 ]   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com