PROFESSION Oil / Gas Field Facilities, Pipeline and Production Plant Operations,
EDUCATION
BSc., Petroleum Engineering, Middle East Technical University, 1981 Ankara/ TURKEY
University Web Page: http:// www.eng.metu.edu.tr
LANGUAGE:
English, Russian (basic), German (fair),
Computer literature: PC word-processing, Power Point, Excel
PROFILE
Have skills and experiences over 15 years for the oil and gas process plant operation, field development, pipeline pumping stations, well site activities, production facilities, commissioning and start up, project design and instrumentation, material specifications and tender document preparation. Worked in different location of overseas operation environments, in Kazakhstan, Azerbaijan, Egypt and Turkey.
SKILLS AND POSITIONS (1982-2006)
* Pumping Stations Start up and Commissioning Team Leader ( BTC Pipeline Project/Turkey),
* Oil Field Facilities Engineering Manager ( Azerbaijan, Salyan Oil Company ),
* Construction Control& Start up Engineer ( Kazak-Turk Munay Co., Aktau /Kazakhstan)
* Project Engineer ( Egyptian Turkish Oil Company / Cairo-EGYPT)
* Start up& Operations Engineer ( Natural gas off-shore and onshore Production Plant /TPAO)
* Process Plant Operation Chief Engineer (Gas Production Facilities /TPAO)
* Oil Field Service Engineer ( Halliburton Services Co.)
ADDITIONAL TRAINING:
1. Certificate for the Pneumatic Instrumentation and Control, 2000
2. Awarded Certificate for the Completion of Modern Well Completion Practices School, Halliburton Energy Institute, Duncon, OK., 1986
3. Certificate for the oil and gas field Instrumentation, 1986
4. Awarded Certificate for the Completed the advanced Engineering Training program for the EOR Project CO2 Processing, 1985, Turkey
5. Certificate for the H&SE, Health and Safety, 1993, Ankara, Turkey
6. Certificate for the German Language Courses, 1973, Ankara, Turkey
7. Certificate for the Completion of Electronic Course, 1973, Ankara, Turkey
EMPLOYMENT HISTORY
EXPERIENCES, QUALIFICATIONS
Initially started with Halliburton Service Company as the field engineer in 1982. Experienced on the downhole tools, well testing equipment, cementing, hydrostatic testing and so on. After Halliburton, to present, worked for the different oil companies in various locations of the countries; Turkey, Egypt, Kazakhstan, Azerbaijan.
Commissioning & Start Up Team Leader/Completion Manager
Company: BTC (Baku-Tbilisi-Ceyhan) Pipeline Project /Ankara July 05 to June 06
Location: Mobile between Pumping Stations and Office based in Ankara/Turkey
About Btc Pipeline Project:
BTC (Baku-Tbilisi-Ceyhan) pipeline, one of the major pipeline in the world, crossing over three countries; Azerbaijan, Georgia, Turkey, designed and constructed to carry Azeri crude oil to the international markets at Turkish Marine Terminal/Ceyhan, invested and directed by world oil produces company MEP (Main Oil Pipeline) Representatives and operated by Turkish Pipeline Company (BIL).
Responsibilities:
* Being responsible for the commissioning and start up of the pumping stations with the crude oil
* Preapare the commissioning and start up procedures for the application
* Define and describe the oil flow path through the stations on the P&ID drawings
* Contribution to the activities to the station start up operation with the crude oil
* Describe the functions of the valves and the instruments in the flow path
* Define the required isolation of the live system from the none related systems
* Outlined the risk assessment and mitigation measures during operation
* Define the process in the station with the crude oil step by step
* Describe the sequential activities and operational steps for the line pumps
* Define the valve positions during flooding the station with the crude oil
* Coordinate the interviews with the job applicants for the company
Oil Field Process and Facilities Engineering May 00 to March 02
Company: Salyan Oil Ltd. (SOL), Azerbijan /Baku.
About the scope of work and company:
SOL is established at 1997, by two western companies, Frontera Resources and Hess Group, Huston and London based respectively, with 50% SOCAR sharing, as the PSA agreement, to develop and operate the oil field at Kursengi, Karabagli in Salyan region with more than 800 wells, in production 400 wells of total, the others idle waiting for workover operation.
Proces facilities included the well head, production lines, manifold, separators, pumps, tanks, pipeline and saling terminal.
Responsibilities and activities in detail for this company:
* Performed the facilities engineering, field equipment construction jobs
* Operated the process facilities; separating, dehydration, tank farm systems in Kursengi, Karabagli
* Managed the oil field operation team,
* Conducted the repair jobs on the pipeline ( 40 km) between Kursengi and Kirovdag
* Conducted and supervised, engineering, tendering, erection of new oil storage tanks in Kursengi, Karabagli and Kirovdag with a 30,000 m3 capacities
* Projected and specified the Custody Oil Transfer Measurement System at Kirovdag and Ali Bayramli with detailed P&ID and PFD drawings.
* Engineered, specified, documented the tenders for the pipelines,
* Engineered, specified, materialized 40 km, 10 inch, oil pipeline
* Specified, engineered, tendered, installed 10 vertical wellhead test separators,
* Specified, tendered, installed, supervised and operated mobile well head test separator with all accessories and instrumentation,
* Revised and insulated 9 each oil heaters,
* Projected, estimated, specified the dehydration system,
* Renewal of old system by replacement and repairing (Ex: 4 x Oil tanks, 15 km pipeline, 5 heaters…)
* Prepared tenders and technical specifications for the new facilities included separators, pumps, piping and instrumentation at oil production plant.
* Planned, forecasted the future projects for investment,
* Prepared budged; monthly, quarterly, yearly.
* Preparation of the AFEs for the new projects with cost estimation and technical specification for the facilities of pipelines and tanks, separators and so on…
* Repaired and renewed old section of main pipeline sections, 20 km with various diameter, 10 km, 10 inches new lines and repair works on the old pipes.
* Commissioning the completed projects of separators, pipeline, oil storage tanks…
Start up and Commissioning Engineer 1997 – 1999
Company: Kazak-Turk Munay – Kazakhstan.
Site: Yelemes Oil Field/ Actau Region
Oil production plant has been designed and constructed at the Yelemes field with the standard facilities including flow lines from well head to the station manifold, oil/gas separators, heat exchangers, water knock out drums, oil storage tanks and pumping units with the electro-pneumatic control and measuring systems to handle 12 000 bbl/d oil ptoduction.
Responsibilities as the project team member:
* Supervised the project and the construction activities at the field, Yelemes/Aktau
* Conducted contractor, contributed to the official meeting, discussed ongoing project,
* Supervised construction and revised work items by change orders as needed,
* Supervised the installation of the oil/gas separators, Yelemes/Aktau
* Walk down and punch list
* Commissioning the oil storage tanks, heaters, pumps instruments of all the plant
* Completed the plant with start up and commissioning
Start up / Commissioning and Process Lead Engineer Sep. 1996-Dec. 1996
Company: Turkish Petroleum Corporation (http://www.tpao.gov.tr )
Site: Marmara Sea, Offshore Production Platform and onshore site.
Involved at all steps of the project from beginning to the commissioning and start-up phase for the natural gas production plant with a capacity of 30 MMSCFD at Marmara Sea in North side of Turkey. Resposible for the supervision of the construction at site, commissioning and the start up the system as the start up and commissioning engineer.
For a whole production plant, each item of the project such as, oil transport pipeline, wellhead design, oil storage tanks, heaters, pumps, separators, flare line, incinerator, piping and instrumentation were the main items to select, purchase, review, discuss…Experienced for these activities. The location was in West Quarun, far 150 km from Cairo. My job here ended with completion of the project in the year
Material, Project, Instrument and Plant Operation Engineer 1983 – 1994
Company: Turkish Petroleum (http://www.tpao.gov.tr)
Site: Office and Oil Field
Enhanced oil recovery project, worldwide, engineered by Williams Brother Engineering Company based Huston based, covered the all surface and downhole systems, to handle the 60 MMSCFD capacity of gas, included separation units, gas sweetening towers, heat exchangers, high power compressors, 80 km pipeline, dehydration system with high tech instrumentation and control system.
Gas injection and oil recovery facilities; three faze separation units, recycle compressor plant, injection and production gathering manifolds.
Responsibilities:
Material inspection, specifying, purchasing, evaluation for the project inventory,
Review and comment all project documents,
Review and comments P&ID s
Assigned as process control engineer for the instrumentation issues
Site control engineering
Coordinating and managing the site activities
Field Operation and Process Chief Engineer for process and production of Gas Production Facilities
Field Operation Engineer April 1982 – 1983 May
Company: Halliburton Services (www.halliburton.com)
Site: Oil Field
Joined to Halliburton Service Company, assigned as the Field Engineer with the responsibilities to conduct the well site activities such as well testing, cementing, oxidizing, hydro-testing the pipelines, drill stem testing of the oil wells and maintenance work in workshop on the test tools.
Technical Visits and Courses
1. Technical visit to Azerbaijan and Georgia BTC Pipeline Facilities and Pumping Stations, 2005, Nov.
2. Technical visit to Cal., Tex (USA)., (Elk Hills CO2 gas field at Denver) and oil fields (California 1984), and attended a short course (15 days) about down hole tools in Halliburton Base in Duncan.
3. Visiting of Star Fiber Glass Factory for one week duration in San Anthony City, O.K. in 1984.
4. Technical visit to instrument Company, For Herman Company in France, practicing in workshop for electronic flow instruments (1986),
5. Japanese National Oil Company invitation for visiting JORA and to discuss the separation units to be installed at Cumulus Field in Eastern Side of Turkey. Visited JEORA in Tokyo/Japan in 1992 and contributed to the secondary recovery project for the CO2 and steam injection,
Publications:
1. Natural Gas Hand Book: 400 pages, the outlined the subjects of general properties of the gases, flow in the pipes, pressure drop, distribution, use for heating, transportaion through the piepliens, LNG, thermodynamic, piping and instrumentation,
2. Industrial Electronic: 187 pages, basic electronic and application of the electronic on the industry
3. Course Book: Oil and Gas Separator System and Process Control, METU/Ankara, 1999
PERSONALITY:
Good communications skills and good inter-person relations,
Healthy, no disabilities
Hard working under pressure.
No smoking, no drink,