Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #48874 next resume »»
CONTACT INFORMATION:
View contact information...

Quantity Surveyor / Planner (Mechanical)

EDUCATION
Punjab Board of Technical Education, Lahore, Pakistan
Diploma of Associate Engineer (Mechanical) 1989

COMPUTER KNOWLEDGE
* Microsoft Office
* Primavera Project Planner 3.1 & 4
* M.S Project

MEMBERSHIP
Member Canadian Institute of Quantity Surveyors (CIQS)

LANGUAGE: English, Urdu

YEARS OF EXPERIENCE: 14

FIELDS OF EXPERIENCE
* Preparation of Bills of Quantities and Bills of Materials Piping / Mechanical / Structure from drawings.
* Preparation and compilation of Technical / Commercial Bid documents including Manpower & Equipment deployment schedules, Project schedule, Method Statements and Organization charts etc.
* Sub contracting.
* Invoicing.
* Prepare project Plans on Primavera Project Planner and resource loading.
* Prepare Level-I & Level-II Schedules for Bidding purpose.
* Project Progress monitoring & preparation of daily, weekly & monthly progress reports.

EXPERIENCE PROFILE

UAE
Company: Al Jaber Energy Services
Project: Head Office Mussaffah, Abu Dhabi.

From 22-12-05 Todate
Position: Quantity Surveyor

Responsibilities:
1. Preparation of Bills of Quantities & bills of materials for Bidding.
2. Preparation & raising of inquiries for materials & subcontracting works.
3. Estimations of Manpower, Equipment, Material, Consumables & other Costs for bidding.
4. Preparation and compilation of Technical / Commercial Bid documents including Manpower & Equipment deployment schedules, Project schedules and Organization charts etc.
5. Preparation of Level-II Schedule for Bidding purpose.

Company: Descon Engineering
Project: Worked on Following Projects

* ADDW works (Descon Work Shop) Ruwais, Abu Dhabi
From 21-07-05 To 24-09-05

Position: Quantity Surveyor
Responsibilities:
1. Preparation of Bills of Quantities & bills of materials for Bidding.
2. Preparation & raising of inquiries for materials & subcontracting works.
3. Estimations of Manpower, Equipment, Material, Consumables & other Costs for bidding.
4. Preparation and compilation of Technical / Commercial Bid documents including Manpower & Equipment deployment schedules, Project schedules and Organization charts etc.
5. Preparation of Level-II Schedule for Bidding purpose.

* Unleaded Gasoline / Low Sulphur Gas oil (ULG / LSGO Project, Takreer Oil Refinery, Ruwais, Abu Dhabi).
On Supply with Aljaber Grinaker – LTA
From 25-10-04 To 20-07-05

Client Name: Technip-Coflexip
Scope of Work: Erection of complete plant including Civil, Steel Structural Mechanical, Piping, Electrical & Instrumentation works.

Position: Quantity Surveyor
Responsibilities:
1. Preparation of Extra work Invoices for Piping, Mechanical, Steel Structure and Painting / Insulation.
2. Verification of Invoices submitted by Subcontractor.
3. Progress monitoring of Insulation / Painting works on Piping / Equipment and preparation of Daily & Weekly Progress reports.
4. Coordination with Subcontractor for expedition of Progress.
5. To update the Release status of Piping & Equipment for Insulation / Painting.

* Shut Down works of OGD-1 Train-III Dehydrators and Tube Cleaning of Cooler 37-E-102 (Gasco, Habshan, Abu Dhabi).

From 02-10-04 To 24-10-04
Client Name: Abu Dhabi Gas Industries GASCO (Habshan).
Scope of Work:
- Unloading & Loading of Alumina, Mol.Sieve UI-94, Mol.Sieve and BTM Ceramics in 4Nos Dehydrators.
- Tube Cleaning of Coolers from Bay-1 to Bay-6

Position: Shut Down Planner / Quantity Surveyor
Responsibilities:
1. Preparation of separate Shut Down plans for both jobs, resource loading and S-Curve generation.
2. To update the Plan on daily basis.
3. Preparation of Daily progress Reports.

* Ethane Recovery Maximization Project (Gasco, Habshan, Abu Dhabi).

From 05-2-04 To 01-10-04

Client Name: Fluor Mideast Limited.
Scope of Work: Erection of Air fin coolers, Compressor, Demethanizer and associated Piping, steel structure and E&I works.

Position: Quantity Surveyor / Planner
Responsibilities:
1. To Prepare the Bills of Quantities and Bills of materials of Piping, Steel Structure and Equipment from drawings and enter in to Project Control System (PCS).
2. Preparation of progress Invoices.
3. Verification of Sub Contractor's Invoices.
4. Project Progress Monitoring on PCS.
5. Prepare daily, weekly & monthly Progress Reports.
6. To update the Primavera Plan on weekly basis.

* ADDW works (Descon Work Shop) Ruwais, Abu Dhabi

(Partially served while working on ERM Project, Habshan

Position: Quantity Surveyor Planner
Responsibilities:
6. Preparation of Bills of Quantities & bills of materials for Bidding.
7. Estimations of Manpower, Equipment, Material, Consumables & other Costs for bidding.
8. Preparation and compilation of Technical Bid documents including Manpower & Equipment deployment schedules, Project schedule, Method Statements and Orgaograms etc.

PAKISTAN
In Pakistan I have worked on following Projects.
Company: Descon Engineering Limited.
Project: Sui Gas Compression Project Phase III (Sui Gas Field, Pakistan)

From 29-11-02 To 20-08-03

Client Name: Foster Wheeler Energy Limited, UK.
Scope of Works: Induction of HP Compressor, Knock out Drums and Air Fin Coolers for Up gradation and associated, Piping, Steel Structure and E&I works for all 6 trains.

Position: Quantity Surveyor Planner

Responsibilities:
1. To Prepare the Bills of Quantities and Bills of materials of Piping, Steel Structure and Equipment from drawings and enter in to Descon Project Management System (DPMS).
2. Estimations of Manpower, Equipment, Material, Consumables & other Costs
3. Preparation of progress Invoices.
4. Verification of Sub Contractor's Invoices.
5. Project Progress Monitoring on DPMS.
6. Prepare daily, weekly & monthly Progress Reports.
7. To update the Primavera Plan on Monthly basis.
8. Preparation of Shut down Plans of all Trains on Primavera Project Planner.

Company: Descon Engineering Limited.
Project: Engro Turnaround 2002

Client Name: Engro Chemical Pakistan Limited.
Scope of Works:
- Replacement of 3 Nos. Exchangers in Ammonia and 2 Nos. in urea along-with piping replacement and modification
- Replacement of 2 Nos. lean solution pumps and piping modifications.
- Replacement and modification of trays inside both urea reactors.
- Misc. modification in piping and structures in catacarb section.
- Removal / reinstallation of absorber and striper vents for maintenance.

Position: Planner / Quantity Surveyor
Responsibilities:
1. Preparation of Shut Down Plans on Primavera.
2. To update the Plan on daily basis.
3. Shut down progress monitoring and preparation of Daily progress reports.
4. Preparation of Bills of Quantities.
5. To prepare and submit Invoices to client.
6. To prepare work orders for Sub Contractors and verify the invoices submitted by Sub contractors.

Company: Descon Engineering Limited.
Project: ICI Soda Ash Debottlenecking Project.

From Nov-2000 To Nov-2001

Client: ICI Pakistan Limited.
Scope of work:
- Installation of Finishing Machine, Strong gas Scrubber, Kiln Gas Scrubber and associated piping, structure and E & I works.
- Installation of Ash packing machine, Light ash Conveyor and associated structure and E & I works.
- Installation of pumps in Brine manufacturing area and installation of piping.
- Laying of under ground piping from Brine manufacturing unit to plant area.

Position: Quantity Surveyor / Planner
Responsibilities:
1. To Prepare the Bills of Quantities and Bills of materials of Piping, Steel Structure and Equipment from drawings and enter in to Descon Project Management System (DPMS).
2. Estimations of Manpower, Equipment, Material, Consumables & other Costs
3. Preparation of progress Invoices.
4. To prepare Work orders for Subcontractors.
5. Verification of Sub Contractor's Invoices.
6. Project Progress Monitoring on DPMS.
7. Prepare daily, weekly & monthly Progress Reports.
8. To update the Primavera Plan on Monthly basis.

Company: S.A.R Engineering Limited (work Shop)

From 1996 To 1999

Position: Associate Engineer (Mechanical)
Responsibilities:

1. To study in detail, the Fabrication Drawings and Specifications of Equipments like Heat Exchangers, Condensers, Tanks etc.
2. The Estimation of Costs like material, consumable, manpower and other overheads.
3. Planning & Scheduling the fabrication and machining works.
4. Daily progress monitoring of fabrication works.
5. Cost controlling by controlling manpower and other resources.
6. Quality control Inspections of fabrication works of Equipments.
7. Estimation and arrangement of material for above jobs.

Company: M.E.C Engineering Limited (work Shop)

From 1994 To 1995

Position: Associate Engineer (Mechanical)
Responsibilities:
1. To study in detail, the Fabrication Drawings and Specifications of Equipments like Heat Exchangers, Condensers, Tanks etc.
2. The Estimation of Costs like material, consumable, manpower and other overheads.
3. Planning & Scheduling the fabrication and machining works.
4. Daily progress monitoring of fabrication works.
5. Cost controlling by controlling manpower and other resources.
6. Quality control Inspections of fabrication works of Equipments.
7. Estimation and arrangement of material for above jobs.

Company: Descon Engineering Limited.
Project: Cement Expansion Project

From 1993 To 1994

Client: Associated Cement Wah Cantt.
Scope of work: Erection and Commissioning of new Cement plant including major mechanical and E&I Works.

Position: Quantity Surveyor
Responsibilities:
1. Preparation of bills of Quantities and bills of Materials from drawings.
2. Estimations of Manpower, Equipment, Material, Consumables & other Costs
3. Project Progress monitoring and preparation of Daily, weekly & monthly Progress reports.
4. Document controlling.

Company: A.E.C (Pvt) Limited.
Project: ICI Powergen Project

From 1993 To 1993
Client: ICI Pakistan Limit
Scope of work: Erection of new Furnace oil Generators and associated piping to increase the power generation capacity

Position: Technical Assistant
Responsibilities:
1. Preparation of Bills of Quantities and bills of Materials from drawings.
2. Project progress monitoring.
3. Preparation of As built Isometrics.

Company: Aquater Spa of Italy.
Project: FFC-2 Expansion Project (Fauji Fertilizer Company)

From 1991 To 1992
Client: Fouji Fertilizer Company
Project: FFC-2 Expansion Project.

Scope of work: Construction of new Ammonia & Urea Plants Including all Mechanical, Civil and Electrical works.

Position: Painting / Insulation Assistant.

Responsibilities:
1. Planning of Painting and Insulation works on Piping / Equipment after reviewing the plans of Mechanical completion.
2. Implementation of above plans by Sub contractor.
3. Coordination with Sub contractor for execution of the job.
4. Calculation of Quantities.
5. Verification of Invoices submitted by Sub contractor.

Company: AEC (Pvt) Limited.
Project: FFC-2 Expansion Project (Fauji Fertilizer Company)

From 1991 To 1991
Client: Aquater Spa of Italy (At FFC-2 Expansion Project)
Scope of work:
- Fabrication & Erection of Steel Structure for Main pipe rack & Compressor house.
- Erection of Tanks including Ammonia tank.
- Electrical works.

Position: Technical Assistant
Responsibilities:
5. Preparation of bills of Quantities and bills of Materials from drawings.
6. Project Progress monitoring.
7. Verification of Quantities submitted by Sub Contractor
8. Document controlling.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2101 to 2150 of 9797)Go to Search Parameters...
Brief Description
Over 14 Years in Maintenance planning, Shutdown/Turnaround Planning in petrochemical Industries. And also in Maintenance of various Rotating and Static Equipment ;Construction Planning including costing.
Expand on my knowledge, skills and abilities to grow both personally and professionally making genuine impact in the organization. I like to be part of a geological, geophysical and petroleum engineering team that uses all disciplines to meet their goals.
I am a chemical engineer having over 18 years experience (8 years in Petroleum Development Oman – a Shell Group Operating Company) in the Exploration & Production petroleum industry covering onshore as well as offshore locations, particularly in Well Services operations in Oman and India.
A talented multi-lingual business professional with more than 10 years expertise in domestic/international business, market, and product development increasing market share by 30% and sales by 20%
A consulting petroleum engineer / project management position in a challenging environment which requires significant technical expertise. Available for immediate travel, domestic or worldwide.
I am a Chemical Engineer having more than 18 years experience in various Oil Processing / Gas Treatment / Petrochemical Process Plants . I have 6 years of Onshore / Offshore Oil / Gas Plants Operational Experience as a Production Supervisor
Job Title : Software Enginer Education : Ordinary Degree in Bachelor of Science Previous Employer: Motorola Australia Software Centre
Expert in understanding permeability of the carbonate reservoirs. With this help reservoir engineers can do their well level simulation rather easily. Fees are charged for every foot of well data studied. Work will be done at the place of the expert.
More than fourteen years hands-on and supervisory experience in Petroleum Refineries in Qatar, Saudi Arabia and Pakistan. Have been analyzing samples from all streams of different units. Have been acting as Lab. Group Leader during Group Leader's leave/absence.
6 years experience in the field of Mechanical, Piping Engineering Design / Drafting. A variety of successful projects for oil & gas, chemical and cement plants. Design, Drafting, CADD, and checking experience that includes supervision, conceptual layout, piping design, pipe supports, fabrication dra
Instrument and metering technician
level-1 licensed engineer in PHWR operation having 10 years of experience
Open Hole and Cased Hole Field Engineer
I have experience Wireline logging and Basic Open hole and Case hole interpretation skill
HR Manager
Mechanical Designer with over 10 years of experience in plant, equipments and structural drafting of oil & Gas industries, Seeking a challenging Respectable and Responsible Assignment in the field of structural Engineering, that encourages continuous learning and Creativity, Provides Exposure to ne
A well rounded drilling personnel with a unique experience in drilling and completion / work over operations
Offshore Medic
CADD/Draftsman (Multi-Discipline), can well operate AutoCAD R14, 2000, 2002, 2004,2005,2006,2007 Autocad Building System (ABS 2007.1). Computer literate in Microsoft Excel, Word, Power Point & Photo Editor.
10+ years of Project Management and Project Controls experience in Foster Wheeler Singapore, Mott MacDonald, UAE, Samsung Engineering Co ltd, Seoul & Engineers India limited, India along with MRP implementation in a Telecom Equipment Company.
Over twenty years in plants, and pipeline construction, Inspection and supervision, including several overseas assignments.
Quantity Surveyor/Estimator (Mechanical)
LNG/Gas plant operator with wide experienced in the Gas processing industry. Able to work on its own initiative and or as part of a team. Commands a proven leadership skill in motivating the teams to achieve their objective. Exercise good analytical and problem solving skills, Experienced in the com
Instrumentation Engineer with 15 years of experience in maintenance, teaching and construction
Field Well Completions, Slickline Operations, Safety
Sr. Structural Engineer with 8+ Yr of Experience in the field of oil & gas.
I have 10 year experience on Instrument (5 year in Oil&Gas Industry as Instrument Engineer and 5 year in Sales & Marketing Engineer (process instrument)
I have 20+ yrs experience in Materials & Inventory Management
- Good at English and drilling software.
16 years of experience in the field of Industrial Chemical Cleaning, Water treatment, Chemical handling, Equipment erection and demolition either Business development or project Implementation. I ca
Prepare plot plan and isometric drawings. Prepare plan drawings by manual drafting and by AutoCad, Microstation and Plant Design System (PDS). Material take-off and back checking. Incorporate changes and revisions on P&ID, communicates and interfaces with other engineering disciplines.
Chief Engineer qualification (any horsepower)
Extensive experience in electrical mechanical completion, pre-commissioning, commissioning and operation of drilling rigs, FPSO’s, power plants & other projects including oil & gas in Africa, Asia, Australia, Middle East and South America.
Chemical Engr w/24 years Well Engineering experience
A keen HSE professional with NEBOSH (U.K) International General Certificate & IOSH-Managing Safely course with Mechanical Engineering background. The experience profile ranges from: Ensuring internationally accepted Best HSE practices across Process Plants, Construction Industry, Oil & Gas EPC Proje
•M.Sc. in Geology with specialization in Petroleum Geology and Biostratigraphy. •Working as a Geological Consultant and providing Wellsite Geological Services to the clients within Canada and overseas.
Marine & Offshore Mariner with broad shore management, command and offshore experience. An onshore fleet manager & offshore project mariner, superintendent and consultant. A commercially orientated, team builder and leader who enjoys overcoming challenges and achieving goals.
20-years experience in the oil exploration industry (12-years in the field and 8-years in the office). Present position as Project Coordinator for Baker Hughes INTEQ. IWCF Well Control Supervisor Level (Surface BOP) and LRQA Internal QMS Auditor. BSc. Ongoing MSc in Petroleum Engineering.
16 years of Piping & Pipelines Project Management/Project Execution experience in the Industries like Refineries, Hydrocarbon, Petrochemical and Oil&Gas(Cross Country Pipelines, Booster Pump stations, Oil Station, Gas Station, Up-Stream flow Lines).
Consultant geologist with close to 10 years experience in mudlogging, wellsite geology, operations geology, sales and software support and training. Majority of my career has been in the UK and Norway with one year spent in Houston, Texas. I expect to have a visa to work in Canada by June 2006.
BS in Petroleum Engineering, 17 years experience in supervision drilling offshore and onshore deviated wells. Knowledge of advanced drilling engineering techniques and testing. Team leader, fluency in English language, both verbal and written.
I have diploma with 20 years experience in construction/maintenance. 10 years in oil industries maintenance, also witness commissioning and start up of new installations in the refinery. Hands on experience in 33/11/3.3kv/440v systems.Available in one month time notice period.
Specializing in ICT/SCADA planning Proven Technical & Management Expertise with 14 years Experience overseas-Kuwait and Japan.
To apply my skills and training as a Heavy Duty Mechanic. I am a forth period apprentice and have experience with the repair and servicing of hydraulics, gaseous compression systems. And fluid pumping systems, coil tubing units, diesel engine repairs, and tractor/trailer repairs.
Safety Officer + 14 years experience
See resume
World Class HSE professional with over 20 years experience within the oil and gas arena. Outstanding change / process management knowledge coupled with highly capable influencing skills.
Resume for Project engineer position
Expert INSTRUMENTATION , SCADA, TELECOM , DCS OR SAP / ERP , DESIGN , ENGINEERING , PROJECT MANAGEMENT , OPERATION AND MAINTENANCE , TECHNICAL SERVICES , ISO’S ETC
Industrial engineer, ample experience in catalytic cracking technology and liquefied natural gas, seeks position to apply knowledge acquired as researcher over past four years. Having lived in Latin America and Western Europe, have developed effective multi-cultural skills.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   [ 43 ]   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com