Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #5294
next resume »»
CONTACT INFORMATION:
View contact information...
B I O - D A T A
EDUCATIONAL
QUALIFICATION B.Sc. (Chemical Engg.)
INSTITUTE REGIONAL ENGG.COLLEGE
ROURKELA
YEAR of Passing 1974
Class/Percent of marks 76.4/I WITH HONS.
PRESENT ORGANISATION: VVF Limited
DESIGNATION DGM (Process)
TOTAL EXPERIENCE:
VVF Limited -1.8 years
Larsen & Toubro Ltd.-3.2 Yrs
Gas Authority of India Ltd.-2.75 Yrs
Reliance Industries Ltd.- 5.5 Yrs
Rashtriya Chemicals & Fertilizers Ltd.-13.5
A)VVF Limited.
Presently working as DGM (Process) for Implementation of 600000 PA
Fatty Alcohol Plant. The job responsibility includes Coordination of
Engineering and Project Management. The Basic Engineering is by Lurgi
Life Sciences, and Detailed Engineering by Uhde India Ltd.
B) Larsen & Toubro Ltd.
Worked as DGM-Engineering and was responsible for the Engineering and Commissioning management of various Lump Sum Turnkey (LSTK)
projects. I was responsible for the Cochin Refineries Ltd. -DHDS
Project implemented by L&T on LSTK basis. I was responsible for coordination between all the design disciplines. Coordination with procurement, inspection, expending and construction. I am familiar with scheduling softwares such as MS-Project. The project included
Catalytic Hydro desulphurisation of Diesel by IFP Process
Technology, Naphtha Reformation based Hydrogen Plant, and various
Utilities and off sites such as Water Systems, Instrument/Plant Air systems, Nitrogen Plant, Utility Boilers, Tankfarm, and fire fighting systems.
The Engineering activity were completed in record time of seven months for such magnitude of plant meeting all the milestone activities.
The Plant was successfully commissioned in April 2000.
B) Gas Authority Of India Limited.
Worked as Dy. General Manager (Operation) monitoring Project activities of GAIL's - U.P. Petrochemicals Project at PATA -Auriya in following areas:
1) Gas Processing Unit -
The unit is designed to handle natural gas of 12MMSCMD to produce
C-2/C-3 fraction, which is used as feed to Gas cracker unit. Basic
Engineering for the CO2 removal is by M/s. SNEA France and C-2/C-3
extraction plant is M/s. EIL.
2) Gas Cracking Unit -
Designed to produce 400 KTA ethylene based on Basic Engineering supplied but M/s. Stone & Webster Corpn. USA. The Plant has four side fired Cracking Furnaces, Quench Section, Compression, Molsieve drying, Cold Section & Demethnation, C-2 convertion, Fractionation,
C-3 Conversion, Propylene/Ethylene Refrigeration sections.
3) Utility plants -
Utility Plants included Raw Water Treatment, DM plant, Cooling Water treatment, Cooling Towers, Instrument air and Nitrogen system. The main other responsibility was to prepare the plant for the start up which included.
1. Recruitment of Manpower & their training.
2. Coordination with licensors.
3. Ordering for Catalysts, Chemicals, lubricants consumable tools &
tackles, special instruments, Lab instruments, spares etc.
4. Preparation of Pre-commissioning /Commissioning.
5. Pre-start up check & safety review.
6. Statutory clearances.
Both process and maintenance heads were reporting to me.
A) RELIANCE INDUSTRIES LTD.
1.TECHNICAL SERVICES: -
Worked as Manager - Technical Services reporting to G.M. Technical.
The major job responsibilities included.
i)Implementation of projects such as PVC Expansion Phase-I, LPG
Handling, EO Expansion.
ii) Integration of Existing Operational Plants with New Plants for
Utility requirements iii) Preparation of Pre-commissioning and commissioning Procedures.
iv) Technical auditing and performance forecasting.
v) Trouble Shooting and De-bottlenecking.
vi) Hydrocarbon Balance.
vii) Preparation of Daily Monitoring and Exception report.
viii) Calculations of efficiencies detailing the reasons for the in-efficiencies and the short and long-term solutions.
ix) Preparation of monthly overall production budget and forecast of the Raw material, catalyst and chemicals requirements.
x)Planning for Annual shut down.
xi) Interaction with Statutory Bodies for various approvals and making presentations.
In my present capacity I had an opportunity to encounter Technical problems of all the plants viz.: MEG, VCM, HDPE, PVC, which has enabled me to know processes of these plants in detail.
I was selected as Management Representative (MR) for the ISO-9000
implementation team for HDPE plant and is fully conversant of the requirements to be fulfilled to get the coveted certification.
2.PROJECT DEPTT.:
Worked as Project Manager of Ethylene Terminal and Tank Farm and was responsible for Project execution operation and maintenance activities.
Participated in the finalization of layout, safety systems and hazardous operation analysis for Ethylene Terminal along with M/s
GERMINATION LLOYDS AND LGA. Appointed the leader of the team of engineers deputed for training in operation of Ethylene Terminal.
I was in charge of team responsible for the commissioning of the terminal. The Ethylene Terminal consists of River Jetty with
Hydraulically operated Loading Arm, Cryogenic Storage Tanks with latest
Digital control and safety system. I was also responsible for receipt storage inventory control and supply of various Bulk liquid and gaseous raw materials/chemicals such as Vinyl Chloride Monomer,
Ethylenedichloride, MEG, DEG, TEG, HCL, Sulfuric Acid, Caustic Soda,
LPG, Natural Gas, High Speed Diesel, Butene-I, Cyclohexane and Octene.
I got an opportunity to visit France, Germany, and Holland in connection with various assignments of Ethylene Terminal.
B) RASHTRIYA CHEMICALS & FERTILIZERS LTD.
1)TECHNICAL SERVICES & PROJECT IMPLEMENTATION DEPTT.
I was associated with various modernization projects at RCF Trombay, which were undertaken to fulfil the objectives such as increased production, energy saving, pollution control, reduction of maintenance and case of operation of the plants.
a) AMMONIA REHABILITATION PROJECT
The Project envisaged replacement of Partial oxidation process with
Steam Reformation Process. Some of the remarkable features of the scheme were the use of:
i) Integrally geared type of compressor for Process Air Compressor for
Ammonia Plant for the first time in India.
ii) Use double LT shift converter for Low Temperature Shift Conversion.
iii) Incorporation of Activated MDEA-CO2 Removal Process.
iv) Replacement of Ammonia Synthesis Converter Basket to reduce
Pressure Drop.
v) Use of DCS for process control.
The activities for which I was directly responsible were:
i) Detailed Survey of the old plant to identify problem and conception of a suitable Rehabilitation Scheme. For this I worked in Ammonia Plant
Production Deptt. For about seven months.
ii) Preparation of detailed cost estimates of the Project.
iii) Preparation of Techno Economic Feasibility Report (TEFR) and getting approval from Statutory Bodies such as MPCB, BMC and dept. of
Environment.
iv) Development of Process Scheme and Contracts finalization with various Process Licensers namely M/s HALDOR TOPSOE, BASF, KTI, PDIL.
v) Scrutiny and finalization of vendors' quotations with M/s PDIL and evaluation of BIDS and placement of order for various equipments.
vi) Follow up with the vendors regarding technical queries and expedite of deliveries.
The Project was successfully completed in the scheduled time and cost meeting all the objectives and Guarantee requirements.
b) SUPHALA (NPK) REHABILITATION PROJECT
The Scheme envisaged replacing old Reaction Section having 34 Nos.
reactors with 3 reactors system and incorporation of elaborate
Scrubbing system to recycle all the effluents back to the system. I was responsible for the following activities of this Project.
i) Preparation of TEFR and approval from the Ministry/Statutory bodies.
ii) Development of Process Scheme in consultation with M/s KEMIRA OY
AND PDIL.
iii) Preparation and finalization of agreements with the Process
Licensers.
c) NITRIC ACID PLANT NOX ABATEMENT SCHEME:
The scheme was devised to reduce NO/NO2 emissions from the old Nitric
Acid Plant from 2500 to 250 PPM by a Catalytic Reduction Process. In addition to the activities mentioned in (B) above I was a member of the team selected for the commissioning of the scheme.
d) UREA POLLUTION CONTROL SCHEME:
The scheme dealt with the reduction of liquid effluents and Urea dust into the Environment. I was involved in the conception of the scheme and development of the Process scheme with M/s UREA TECHNOLOGY INC.
e) HYDROGEN AND ARGON RECOVERY FROM SYN. LOOP PURGE GAS:
The scheme was in nascent stage; I prepared TEFR. It has since been commissioned and operating successfully.
2). UREA PLANT (OPERATION) -
Worked in shifts for about three years as shift Incharge urea
Plant. For next three years worked as Assistant Plant Manager
(Production), the job requirement was to ensure Safe operation of the
Plant at Optimum load to achieve targeted production of proper specification with minimum raw material and utility consumption.
Additionally I was responsible for Daily Monitoring and reporting of plant performance to the management.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2001 to 2050 of 10917)
Go to Search Parameters...
Brief Description
I have 10 years of experience in E&P business, evaluating basins interms of potential, play maturation, volumetrics,maturing prospects, interpreting seismic data, building geological and facies model, well operation, seismic inversion, fluid substitution modelling, porosity estimation, AVO analysis.
Well Service / Wireline / Snubbing / Workover Supervisor
I have a good management skills and experiences in various areas of operations. I am particularly aware of the Operation / construction / Commissioning and start up for Oil and Gas industries.
Rig mechanic/heavy machinery mechanical fitter/aircraft mechanical ground engineer can do any thing.
Over 18 years of combine experience in Oil and Gas mostly in Engineering Design projects from FEED to Detailed design for Offshore and Onshore projects, Subsea structures, Structural Piping design, Mechanical, Electrical and Civil work, and other similar structures and equipment details, assemblies
Field & office design, using PDS program, review drawing before send to approved
Senior instrumentation and controls maintenance. Commissioning Supervisor specially
Procurement Buyer – at Snamprogetti Romania a company of Saipem Responsibilities: - responsible for the process of Liquidated Damages
Senior workover & completion operations supervisor with 7 years experience in HPHT oil wells in different workover activates, gained master degree in petroleum technology, BSc degree in Petroleum Engineering & recently warded IWCF certificate drilling supervisor level.
SUMMARY OF EXPERIENCE Eleven (10) years of very sound technical proficiency as a “Sr. Piping Designer / Draftsman”in the Oil & Gas Field, Petrochemicals Refineries, Piping, Tank farm Area’s, Platform Piping, Jacket Piping, Pipe Racks & Process Equipments, Cross Country Pipelines including pumping s
Hands on experience on High Pressure Mobile Hydraulic Systems (Closed Loop & Open Loop Systems), which includes Variable & Fixed Displacement Hydraulic Pumps & Motors, Various types of Hydraulic Valves, Proportional Valves, and Electro Hydraulic Actuators, Hydraulic Cylinders.
Over Fourteen and half years of experience in Petroleum Refining & downstream process, Petrochemicals and Chemicals in the Field of Continuous Process plant Operations, Troubleshooting and Commissioning. Well versed in Normal Operation and Unit revamps, Gross root & Expansion of Crude Refinery Erect
Quality Assurance, Quality Control, Quality Management, Inspection, Operations, Design, ISO 9001, 14001 & OHSAS 18001
20 years of construction experiences
I have about 29 years experience in contracting & procurement (CP or SCM): 9 years in civil engineering contracts and 18 years with Sarawak Shell Berhad in CP for offshore engineering projects. Last job was SCM Team Leader: Projects.
Diploma in Electronics And Telecommunication Engineering. 18 years experiance in instrumentation field ,specially caliberating ,servicing ,repairing electronics instruments
Specialist in QA/QC-E&I, having more than 17 years experience in large size Electrical and Instrumentation construction works
Free!
Over 25 years experience both Hands On, Inspection and Management
Bachelor of Engineering (B.E) ¨C Electrical and Electronics (1996 to 2000), with 72% at Bharathiyar University, Coimbatore, Tamil Nadu, India.Master of Business Administration(MBA) ¨C Annamalai University,Chidambaram, Tamil Nadu, India.
Experience in Design and engineering of Pressure Vessels, Heat Exchangers, Columns, Reactors, Storage Tanks as per National and International Codes like ASME Section VIII Div. 1 / Div. 2, TEMA, API 650/620, API 660, API 661, WRC ,UBC, IS 875, IS 1893, ASCE, IBR and etc.
Catering Site Manager, HSE Manager
Seismic Project manager and QC
Project Controls Estimator
Marine electrical fitter, 20 years experience, trade qualified, was a foreman in the field. Skilled in mechanical / hydraulic servicing as well.
This is to register my availability for contracts in the function above as detailed in the enclosed CV, U.K. or abroad. My most recent projects, all at senior level with direct bearing on Proactive HSE, Project Methodology, Quality and Timing have included.
HSEQ Manager and Integrated Management System Coordinator
Power Industry Plant Manager - Over 35 years of progressively diverse experience encompassing electric utility generation operation and maintenance, reliability improvement and facility management
i have worked with many multi national firms.I want to obtain a position of Plant manager/Maintenance manager/Service manager in your company. I have done courses under shell company Safety awareness. Incident and injury free. Defensive driving. Safety induction.
Project Engineering, Construction, Contracts, Commissioning, Start Up.
Drilling supervisor with extensive drilling engineering and operations background
Free!
Versatile individual with 29 years of experience, 25 of which have been in the upstream oil industry performing in plant maintenance, operations field management, and mechanical integrity, also managed implementation of maintenance driven projects
Piping DEsign Engineer with 13 years of experience in the field of refinery, petrochemicals, fertilizers. Experience in layouts, materials, stress analysis. Presently working with KNPC, Shuaiba Refinery, Kuwait
Technical Professional with over 20 years global experience in Petroleum Engineering, Intervention Services, Project management, On-site Supervision, Proposal and Report preparation, Contract preparation and Administration.
I an am executive with 24 yrs of experience with success in start up, strategic planning, product management, sales and marketing, cost control, technology transfer of engineering/equipment /turnkey system being part of global cross functional team for strategy building and success in the region.
A hardworking and highly competent Electrical Engineer
A petroleum geologist proficient in interpreting and integrating well logs, core analysis data, petrology, 2D and 3D seismic, well test and production data to develop prospects and drilling opportunities leading to the economic production of hydrocarbon.
QA design and Quality Control including conduct of coordination and various inspection activities on mechanical packages in UK, Europe, USA, Middle East and Far East. Computer system / procurement activities.
My objective is to start a new career in Indonesia that would allow me to expand on my twelve years of sales, marketing and contract experience in the service sector for the Indonesian Oil, Gas and Geothermal business after retiring from Schlumberger.
Overall I have 19 years of experience in the field of Project Management, Administration, Secretarial, Document Control, Personnel and Procurement. For the last twelve (12) years I am working with Saudi Aramco and Petrokemya?s various GAS EPC projects.
Charted Engineering marien & mechanical engineering with PHD in Engineering management,20 Years experience as senior corrosion engineer in mining and petroleum industries. With 15 years in engineering management. Specialist engineer coating and Cp design.
I am a Project Manager/Mechanical Engineer with 33 years experience in both, International & local projects.
2003-2004 Veco Engineering Abu Dhabi 2002-2003 ABB s.r.l. Romania 2001-2002 ABB s.r.o. Czech Republic 2000-2001 T.I.A.b , Romania 1999-2000 Progeco Sistemi Group, Italia 1998-1999 I.P.I.P. , Romania 1980-1998 Upetrom S.A. Romania
Directing and maintaining the QHS&E efforts of the Region, to conform to Company policy, regulatory, and customer’s requirements. Developing Region policies, procedures, and related documentation. Interact with client HSE departments to ensure understanding of HSE Systems.
I am a no non-sense safety professional with a serious work ethic to accomplish company goals and objectives. I have over 20 years of HSE management experience with the last two years working in Russia on World-class Projects.
My skills are developing training plans & tracking using SAP, managing training records, training technicians developing CBT modules. Creating operating procedures, training modules. Word proc & Tech writing, Power Point, Outlook, Excel, SAP, Front Page. Inc/Acc Invest, TDC3000 & DCS operating, SWP
Ist class Chemical Engineer with vast experience in operation , Project Management , Engineering Management , Commissioning Management in Fertilizer , Petrochemical and refinery field.
Twenty five years in managing remote area field construction and logistical operations through out Asia. Construction of air strips, heli-pads, camp facilities, drilling location. Subsea Fiber Optic cable landing operations and post lay burial operations on and off shore.
Mechanic Engineer
A Uk based professional Chemical/ Process Engineer with 20 years experience in various aspects of Plant Operations and Design. Looking for ex-pat status or home based job/contract. Special interests include Environmental Engineering, solid/ liquid separations and wastewater treatment.
DCS system engineering design, configuration, installation & commissioning.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
[ 41 ]
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com