CONTACT INFORMATION:
View contact information...
PLANNING ENGINEER
QUALIFICATIONS:
Bachelor of Science in Mechanical Engineering (Aggregate First Division) from University of Engineering & Technology Lahore, Pakistan.
UAE License No.: 730744.
Language: English, Urdu, Hindi and Punjabi.
Membership: Life time membership with Pakistan Engineering Council.
MAJOR PROJECTS & ASSIGNMENTS
Planning Engineer during Fabrication of 9 Pressure Vessels for Fisia Italipiantti, 64 Nos. of Tanks for ADNOC, 980 Tons of Structural Steel for Al-Gurair Oil Mills. Light Structural Steel works for Kellogg Brown and Root (KBR) USA, DEWA, DUBAL and Al-Bhar.
Planning Incharge during Installation of Electrical Power Skids Project in Bu Hasa – U.A.E.
Planning Incharge during Construction of Bobi LPG Plant with OGDC – Pakistan.
Planning Incharge during Construction of LASMO Bhit Gas Field Project – Pakistan.
Planning Engineer during construction of OMV-Gas Field Development Project – Pakistan.
Planning Engineer during Construction of Gasco upgrade project (Revamp Area) – UAE.
Planning Engineer during Fabrication of 20 LPG Bowzers for Sudan, 9 Bullets for Eared Gas.
Planning & Cost Engineer during the Construction Phase of PARCO Refinery – Pakistan.
EXPERIENCE SUMMARY
Dutco McConnell Dowell (ME) LLC Dubai. (Jan 2005 TO DATE)
Project Planning Engineer
Responsibilities
Carry out the Planning, Costing and Cost Control Planning functions for Projects.
Provide overall progress reports and other reports related to schedule and cost as required by the Project Control Manager / Project Manager.
Provide liaison with the Tender department and develop tender programme.
Monitor and coordinate the preparation maintenance and change of construction schedule, methods, manning charts and equipment requirements. Advise on action to be taken to prevent or improve undesirable tends in progress.
Evaluate monthly progress claim and variation claim.
Pot line 7 Mechanical Work for Dubai Aluminum Company Ltd., Dubai. (Jan 2005 to Date)
Project Value US $ 5.0 million
Fabrication and Installation of Aluminum Cathode Bus Ring, Trench Busbar, Compressed Air system, Aluminum Silos and its Structural Steel; installation of Pot shell, Superstructure, Dense Phase system and Busbar monitoring system.
Cast House No. 3 Mechanical Work for Dubai Aluminum Company Dubai, (Jan 2005 to Date)
Project Value US $ 1.0 million
Fabrication and Installation of piping works including Compressed Air, Argon, Fuel Gas, Fire Water, Portable Water, Unblended Water system piping and its Structural Steel, Hydro testing, blasting, and painting works.
26" Gas Pipeline Project for Toshiba Corporation, Dubai. (Jan 2005 to Date)
Project Value US $ 0.65 million
Fabrication and Installation of 26" Gas pipeline 600 Meter Line with two branches including large bore, small bore, Tie-ins connections, structural steel supports, hydro testing, painting, cathodic protection, Electrical and Instrumentation works.
PREVIOUS (COMPANIES)
Headline Engineering L.L.C. Dubai. (Mar 2003 to Dec. 2004)
Planning Engineer
Responsibilities
Made plan on Primavera Project Planner, MS Project and monitoring the progress.
Correspondence with the clients on incoming, out going issues including design, quality, progress, variation in original scope and cost related issues.
Internal correspondence with Estimation, Design, Purchase, Quality and Production departments.
MS Tanks for Abu Dhabi National Oil Co. (ADNOC), Abu Dhabi. (Mar 2003 to Dec 2004)
Project Value US $ 0.50 million
Fabrication 64 nos. of Fuel Tanks including fittings, blasting and painting.
Pressure Vessel for Fisia Italimpianti, Abu Dhabi. (Mar 2003 to Sep 2004)
Project Value US $ 1.0 million
Fabrication of 09 Pressure Vessels including internal and external pipe fittings, blasting, painting and internal rubber lining.
Structural Steel Trusses for Al-Ghurair Oil Mill, Dubai. (Mar 2003 to Aug 2004)
Project Value US $ 3.1 million
Fabrication and Installation of 980 tons of Heavy and medium size structural steel for Truss work, Purlins, Sag Rods, canopies and structural supports.
Descon Engineering Abu Dhabi, UAE. (Oct. 2002 to Feb. 2003)
Planning Incharge
Responsibilities
To collect, review and discuss work order inputs, resource requirements with concerned departments to prepare & monitor work programs for repairs, preventive & predictive maintenance, plant shutdowns, & turnarounds.
To plan for required infra structure to ensure timely availability. Made two types of work permits that is hot permit and cold permit before Installation of each cluster and start work with the approval of client.
Electrical Power Skids for ADCO at Bu Hasa. (Oct 2002 to Jan 2003)
Project Value US $ 1.15 million
Fabrication and Installation of 40 clusters including Panel board and Panel Switch installation, transformers installation, HV and LV cable termination and connection with overhead transmission line and shutdown.
Siemens Pakistan Engineering Company. (Feb. 2002 to Oct.2003)
Planning Incharge
Responsibilities
Two different projects one with client LASMO Bhit Gas Field Project and other with ENAR/OGDCL Bobi LPG Plant.
Progress Monitoring and Time Scheduling of all mechanical works e.g. fabrication and erection of Steel Structure, Piping, Tanks and Equipment installation on Primavera Project Planner. Ver. 2.0b.
Made Level II, Level III and Level IV schedule as per client requirements and submit every week to the client.
Bobi LPG Plant for OGDCL Pakistan. (Aug 2002 to Oct 2003)
Project Value US $ 1.04 million
Fabrication and Installation of Piping including compressed air, nitrogen gas and firewater on the racks and sleepers. Structural steel fabrication and installation, Fabrication and Instillation of LPG storage Tanks and Water Tank. Installation of equipment including filters, bullets and heat exchangers.
Bhit Gas Field for LASMO Oil and Gas Company. (Feb 2002 to Aug 2003)
Project Value US $ 6.17 million
Fabrication and Installation of Piping including compressed air, nitrogen gas and firewater on the racks and sleepers. Structural steel fabrication and installation, Fabrication and Instillation of LPG storage Tanks and Water Tank. Installation of equipment including filters, bullets and heat exchangers.
Descon Engineering Limited. (April 1999 to Jan.2002)
Planning Engineer
Responsibilities
Served three years with this organization on different positions e.g., as a Planning Engineer, Cost Engineer and Site Engineer.
Assigned as a Cost Engineer in OMV-Kadanwari Upgrade and Miano Field Development Project. Cost Centre wise estimate the overall Project cost involving Original Work & Additional Work with Project Variable cost & Fixed cost. Preparation of claim for extra work & Re-work Expenses.
Assigned as a Planning Engineer in GASCO. Planned the erection of piping and structure activities with work front availability. Daily updated the progress in DPMS (Descon Project Management system) network.
Assigned as a Planning Engineer in Descon Engineering Works. DEW is a fabrication workshop, which deals with the fabrication of pressure vessels, Boilers, heat exchangers and tanks.
Study the drawings, made Indent for local Procurement, Co-ordinate with Production, deal with Sub Contractors and make schedule in P3.
To study the drawings made the material requisitions, control the issued and in stock material.
Prepared weekly & monthly schedule for the installation of Centrifugal & Reciprocating Compressors.
OMV-Upgrade Gas Field Development Project for OMV (Mar 2001 to Jan 2002)
Project Value US $ 3.1 million
Fabrication and Installation of CS, MS, Alloy Steel, Galvanized and SS piping, Equipment Installation including Filters, Pressure Vessels, Storage Tanks and Pumps, Structural Steel and its supports. Tie-Ins connections with the existing lines.
Gasco Ruwais Upgrade Project (RUP) for GASCO Abu Dhabi. (Oct 2000 to Feb 2001)
Project Value US $ 15.4 million
Plan the fabrication and installation activities including Piping, Static Equipment, Rotary Equipments and Structural Steel installation in Train 1 and Revamp area 701.
Fabrication of LPG Bowzers for Sudan Gas. (May 2000 to Sep 2000)
Project Value US $ 1.4 million
Descon Engineering Works (DEW) is a Fabrication workshop having heavy Furnace as well. Project was to fabricate 20 nos. of LPG Bowsers including Dish Ends bending, rolling, welding, Normalizing (Heat treatment), and fitting accessories like King Pin, Fire Extinguisher Box, Emergency Sign Board and Lifting Lugs, Mud Guards manufacturing and Painting.
Fabrication of Pressure Vessels for Erad Gas Pakistan (May 2000 to Sep 2000)
Project Value US $ 0.54 million
Fabrication of 8 nos. of Pressure vessels for Erad Gas Pakistan including Machining, Welding, Fittings and Painting.
Pak Arab Refinery (PARCO) Project Pakistan. (Apr 1999 to Apr 2000)
Project Value US $ 26.54 million
Study the Isometric drawings and made the material requisitions. Monitor overall Installation activities in Area 300 including Piping, Equipment, Structural Steel and Insulation works. Prepared the schedule for the installation of Centrifugal & Reciprocating Compressors.
TRAINING & COURSES
HSE: Achieved "safety awareness program - Modules 1-10" Award from Marubeni Corporation Japan.
Permit to Work: Attend a training program of "ADCO permit to work (Job Performer)" from National Training Centre Abu Dhabi.
SPECIFIC SKILLS
Good understanding of Fabrication drawings, isometrics drawings, piping plans, piping BOQ preparation & piping supports.
Progress Measuring/Reporting system synchronizes with Client's system.
Cost Monitoring Reports.
Sub-Contracting (Manpower, equipment & special services).
Exposure with Quality Management concepts (ISO 9000 Series)
Document Controlling to meet ISO standards.
Communicate with clients, 3rd parties and vendors.
COMPUTER SKILLS
Auto Cad: Attend one-month training program of "Auto-Cad for professionals" release 14.
Primavera Project Planner (3.0) from Descon Engineering Ltd. Head Office Lahore – Pakistan.
Operating System: - Windows 98, 2000, XP.
Other Packages: - MS Office, Adobe Acrobat etc.
View contact information... |