Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #62464
next resume »»
CONTACT INFORMATION:
View contact information...
Project Manager - Ammonia
B.E.-Chemical with 9 years of Commissioning and Operation Experience in Ammonia Plants; 6 years of Project Management experience & 4 years of Process Engineering experience in Fertiliser Project
Skill Details:
Category: Production-Process Plant
Key skill: Project Management; Ammonia Technology; Process Engineering
Employment Details:
Total Experience (Yrs.): 18.5
Current Employer: Suhail Bahwan Group (Holding) LLC.
Muscat
Current Job Description: Ammonia Project Manager for New Mega AMMONIA/UREA (2 x 2000 MTPD Ammonia and 2 x 3500 MTPD Urea) Project in Algeria
Job Responsibility: Responsible for all technical studies /jobs related to project conceptualization like Feed Study, Preparation of ITB, ITB Clarification, Bid Evaluation, Preparation of Contract/Agreement for following major pre-project activities:
EIA & QRA Study
Geo-Technical Study
Topography Survey
Bathymetry and Seismic Survey
Feed Study
Marine Study
Project Design Basis for LSTK EPC Job
LSTK ITB for ISBL and OSBL facilities
Clarification with EPC Bidders
Previous Employer: CFCL-Gadepan
Qualification Details:
Highest Degree: B.E/B. Tech-Chemical
Institute Name: Regional Engineering College
Additional Qualification: MDP from IIM-Ahmadabad
Personal Details:
Sex: Male
Nationality: Indian
Date of Birth:09/11/1965
Current Salary (Rs./Annum): 3,000,000
Text Resume
Passport No.: F-2006025
Passport Valid Up to: 04.04.2015
Details of Professional Experience (Last 18.5 years)
Period: From Nov 1988 to Aug 1992
Designation: Asst. Engineer- Ammonia
Areas of Responsibility:
01. Shift Engineer of MW Kellogg designed 900 TPD Ammonia Plant in IFFCO- Phulpur Unit
02. Assist SM / Manager for all technical jobs related to Ammonia Plant
Period: From Aug 1992 to Jan 1995
Designation: Sr. Shift Engineer-Ammonia
Areas of Responsibility:
01. Project activities at site (Vendor Supervision, Training of Manpower, Expediting of equipment at Vendor Shop, DCS FAT, Project Planning etc)
02. Core project group team member for Pre-commissioning and Commissioning of 1500 TPD Haldor Topsoe Ammonia Plant
03. As Shift In charge: Operation & Trouble Shooting of Ammonia Plant
Period: From Feb 1995 to April 1999
Designation: Asst. Manager - Project
Areas of Responsibility:
01. Preparation of Project Feasibility Report (DFR)
02. Preparation of ITB on Turnkey lump sum (TKLS) basis for Ammonia/Urea Project (Gadepan-II Project)
03. Bid Comparison for Toyo and Snamprogetti offers
04. Preparation of Detailed Project Report (DPR)
05. Compilation of technical data for preparation of Environment Impact Assessment (EIA) Report and obtaining NOC from Rajasthan Pollution Control Board (RPCB) & Ministry of Environment & Forest (MOEF).
06. Project Cost Estimates for both Onsite and Offsite facilities of the Project.
07. Preparation of Contract documents on Turnkey lump sum (TKLS) basis.
08. Preparation of ITB Document for Offsite and Utilities activity on Cost + Fee basis.
10. Preparation of Design basis and Scope of work for Offsite & Utilities.
09. Vetting and approval of all Basic Engineering Design Documents of TEC / KBR designed 1500 TPD Ammonia
Plant.
10. Checking and approval of all long delivery critical equipment datasheets.
11. Approval of Detail Engineering Documents (Approved For Construction)
Period: From May 1999 to June 2000
Designation: Manager - Project
Areas of Responsibility:
01. Monitoring the Procurement of all onshore supply (Indigenous) equipment and bulk items (Piping / Fittings / Instrument & Electrical Equipment).
02. Finalization of Commissioning and 2 years Spare Parts.
03. Monitoring the status of balance equipment, bulk material (Piping / Fittings / Instrument & Electrical Equipment) & 2 years spare parts
04. Monitoring the delay in balance Construction activities in Ammonia/Urea.
05. Finalization of pre-commissioning & commissioning schedule.
06. Handing over of Final Vendor documents to plant operation people & Project Documentation Section.
07. Preparation of Cash Flow Statement / Monitoring of Start up expenses on weekly basis till Commercial
Production.
08. Shorting of all Design related problems during Trial Run Production.
09. Preparation of documents for Tariff Advisory Committee & Insurance Co.
10. Finalization of GTR Procedure, Guarantee Test Report & Final Plant Acceptance formalities.
11. Reconciliation of all Turnkey Contracts with TEC / TEIL including settlement of extra claims
Period: From July 2000 to Aug 2004
Designation: Manager - Process (Ammonia)
Areas of Responsibility:
01. Process Engineering: Looking after all process engineering related jobs on day-to-day basis for plant Optimization. Troubleshooting & de-bottlenecking for improvement in Ammonia Plant performance.
02. Feasibility study of new grass root Ammonia / Urea projects as well as existing units (to be disinvested by GOI) in India and abroad.
03. FICC Jobs: Was responsible for all Fertilizer Industry Coordination Committee & Govt. Of India related jobs for both phase-1 & phase-2 plants.
04. Implementation of Plant Performance Information System (PPIS) for Phase-II Plants
05. Responsible for Management Information Assignment for Ammonia, Urea and Utility Plants.
06. Experience in Process Engineering Software, ASPEN PLUS.
07. Responsible for all Environment Management Programs (EMP) required for ISO-14001 (Environment Management System Certificate).
08. Revamping of both Phase-I & Phase-II plants to enhance the Urea prod. capacity from 2 x 2620 TPD to 2 x 3500 TPD.
Period: From Jan 2005 to Oct 2006
Designation: Sr. Manager - Ammonia
Areas of Responsibility:
01. Responsible for all activities of 1520 TPD KBR Ammonia Plant and associated utilities (Cooling Towers,
Boilers, EDG & IA/PA Unit)
02. Optimization & Troubleshooting for improvement in plant performance.
03. Production Planning and Preparation of Revenue & Capital Budget for Phase-II Plants.
04. Reduce energy consumption and optimize resource utilization by implementing various modification schemes
05. Adhere to Safety, Health and Environment guidelines o No reportable accidents.
o Emissions and discharge from plant within norms as per ISO 14001 and stipulated by management.
o Occupational Health, Safety and Environment norms as per OHSAS-18001
o Implementation of BSC 5-Star norms in the Plant o No major NCN for ISO 14001, OSHAS 18001 & BSC.
06. Ensure quality of product within specified norms
07. Ensure proper upkeep of Company Assets
08. Ensure compliance of all statutory requirements
09. Develop and ensure training of all Subordinates o For 20 Management and 30 Non-management Employees o Identify training needs and communicate to HR department.
o Mentoring all employees who have been promoted to Management cadre from Non-management category.
o Arrange training courses for ISO 14001, OSHAS 18001 & BSC and providing other technical inputs to subordinates.
10. Revamping of Ammonia-II Plant to enhance the ammonia production capacity from 1520 TPD to 1940 TPD by KRES + MDEA Technology offered by KBR.
Period: From Oct 2006 to till date
Designation: Project Manger - Ammonia
Areas of Responsibility:
Responsible for 2 x 2000 TPD Ammonia Plants and all Associated Utility Facilities (from conceptualization to implementation) of the new Fertiliser Project of Suhail Bahwan Group (Holding) LLC. in Algeria.
Once implemented, it will be world's biggest Ammonia (4000 TPD) and Urea (7000 TPD) Project
Job Responsibility: Responsible for all technical studies /jobs related to project conceptualization like preparation of ITB, ITB Clarification, Bid Evaluation, Preparation of Contract/Agreement including following major pre-project activities:
FEED Study: Finalisation of Plant Configuration, Overall Steam & Power Balances
EIA & QRA Study
Geo-Technical Study
Topography Survey
Hydrographic, Bathymetry and Seismic Survey
Dealing with Owner's Engineer
Finalisation of Project Design Basis for LSTK EPC Job
Preparation of LSTK ITB for ISBL and OSBL facilities
Review of Contract Document
Compliance of Equator Principle and World Bank / IFC Guidelines (e.g. EHS Guidelines)
Site Preparation and Finalisation of Plot Plan
Clarification with EPC Bidders
Major Assignments/Projects:
01. Expediting of Critical Equipment of Gadepan-I Project in BHEL workshop
02. Factory Acceptance Test of DCS at Yokogawa for Phase-I Ammonia Plant
03. Commissioning of Haldor Topsoe Ammonia Plant in Gadepan-I
04. Conceptualization of Gadepan-II Ammonia / Urea Project
05. Implementation of TEC / KBR designed Gadepan-II Project
06. Factory Acceptance Test of PLC at TATA Honeywell for Ammonia-II Plant
07. Sorting out design related problem after one year of operation at Toyo Engineering Corporation (TEC), Chiba-Japan office.
08. Handling of all Ministry of Fertilizer related jobs of Gadepan-I and II Plants
09. Management Information Assignment (PPIS) of Gadepan-I and II Plants
10. Successful changeover from Naphtha to LNG in Ammonia-II Plant
11. Conceptualization and Finalization of Revamping of Ammonia-II Plant by KRES + MDEA Technology at KBR Houston Office
12. Visited KBR first KRES & ATR technology plant in Methanex, Ocelot Plant at British Colombia in CANADA for Gadepan-II Revamp Study.
13. Made record yearly production in the FY 2004-05 and FY 2005-06 as Plant Manager.
14. Achieved lowest energy per MT of Ammonia and Urea amongst any Naphtha Based Fertiliser plant
15. Conceptualization of world's biggest Ammonia (4000 TPD) and Urea (7000 TPD) Project in Algeria with Sonatrach.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 501 to 550 of 9905)
Go to Search Parameters...
Brief Description
i am working as DCS panel foreman in a big oilfield of ADCO company in abu dhabi UAE
I am currently working as Principle Process Specialist for Worley Parsons MEG, Calgary. I have more than twenty-four (24) years of experience in process design, conceptual studies and operations, for oil and gas projects (both onshore and offshore), petroleum refineries and petrochemical complexes.
I have over 20 years of hands-on experience in the information technology industry with the last 5 years spent managing a staff of 50+ Project Managers, programmers, analysts, Oracle DBAs with an annual budget of over $10 million.
Land Manager / Land Administrator
14 Years experience in Import / Export function with Swedish Multinational, in India.
Strong hold in Erection, Pre-Commissioning,Commissioning and start-up.
Managed the activities of two Draftspersons. Supported the International, Offshore and Onshore Divisions in Exploration and Land Departments. I created Structure and Isopach contour maps. Created Land maps with metes and bounds descriptions from leases. Created Cross Sections using well logs, montag
I have total 34 years of Experience in the field of Operations:
Working as DCS&FIELD OPERATOR at PDH (Propane dehydrogenation ) complex of NATPET (National petrochemical Industries) in Yanbu, Saudi Arabia
WELDER
I have senior technician diploma from API ORAN (ALGERIA) my works experience is as follow: In the begining, I have worked for paints society since three years after I have change the society for SONATRACH after macking a test and Ibegin the new work as plant operator for one year, after as panelman
CSWIP Senior Welding Inspector BG Grade 2 Painting Inspector NDT ASNT Level 2
Over 18 years of proven expertise in Industrial Purchasing, Contracts, office Administration and Logistics with a track record of defining and managing the implementation of purchasing strategies, which have realized significant process and cost reduction benefits.
More than 17 years experience in mechanical maintenance and projects in cement industry and steel
Reservoir Engineer,18 years of experience from Condensate to Heavy oil fields, over 4300 hours of intensive petroleum training. Extensive experience as Integrated Team Leader. Extensive experience with Single and Multilateral Horizontal wells in Heavy Oil field. Simulation, planning experience.
Twenty-Nine (29) years of experience, working under various international companies in Middle East, Europe and in South East Asia countries.
B.E.-Chemical with 9 years of Commissioning and Operation Experience in Ammonia Plants; 6 years of Project Management experience & 4 years of Process Engineering experience in Fertiliser Project
PLAN SUPERINTENDENT,PLANT MANAGER.SHUTDOWN MANAGER,MAINTENANCESUPRINTENDENT.TECHNICAL CONSULTANT.COMMISSIONG ENGINEER
Highly experienced in project engineering management
I have experiences in Oil and Gas International Company in Exploration, Development and Cross Function Team Departments for 26 years in Indonesia with the latest position is Geoscience Analyst. I am expert on DAta base Administrator for Well dar, seismic and petrolog data
GM Ops An experienced General Manager, Operations Manager and professionally qualified engineer, with a diverse background, extensive experience, detailed operational, technical and functional knowledge of both the Marine Industry and the Oil & Gas business.
Document Controller,Scheduler (Primavera P3), Programmer (FoxPro), Administrative Assistant
I have got 20 years experience in oil filed operations; workover, completion & snubbing, I worked as a rig supervisor on workover rig for about 08 years, snubbing and completion about 3.5 years, Completion 02 years, management about 01 years. and some years as field service supervisor on coiled tub
QA/QC/NDT w/ experience in industrial & aviation applications, Will travel worldwide
Lead Petrophysicist with service company and operator background. Expert in horizontal well evaluation and placement, production & saturation logging & interpretation, contract bidding & tendering.
Accomplished, seasoned professional with proven success in fiancial management to achieve the organization mission. Superior communication skill, easily interact with executives, regulatory agencies, client, vendors, and staff. Technically proficient in spreadsheets, word processing, presentation a
Chartered cum Cost Accountant with more than 15 years of experience
Excellent in C & Fortran program languige. solid geophysics knownlege
OVER 18 YEARS OF EXPERIENCE TO SUPERVISE / MANAGE PLANT MAINTENANCE FUNCTION IN PETROCHEMICALS / POWER / OIL & GAS / UTILITY WITH EMPHASIS ON RELIABILITY USING LATEST TOOLS AND APPLICATION SOFTWARE LIKE SAP/R3-PM MODULE, MS PROJECT AND OTHER ENGINEERING TOOLS.
Venezuelan citizen with more than 20 years of experience in upstream oil business (onshore and offshore) and most recently in heavy oil recovery and upgrading projects. I have two degrees, Law and Economics with a Master in Business Administration.
Casing Vibration monitoring and spectrum analysis of Rotating equipment by using data collector & analyzer (SKF Microlog CMVA60) and data manager (SKF PRISM4 1.35 / SKF Machine Analyst 2.2)
Process Engineer with 19 years experience on which 12 years of Project Engineering, and Commissioning in international team environment.
Geoscience consultant for integrated studies, seismic interpretation, reservoir characterization, reservoir geophysics, and interpretive seismic processing.
QHSE + E manager worldwide
Experienced E&P Geologist cum Manager with M.Sc. (Geology) and MBA degrees with over 25 years integrated experience from discovery of new prospect to delineation and evelopment.
Drilling Fluid Engineer having 17 years experience
19+ Years experience in OIL & GAS, PETROCHEMICAL and FERTILIZER plants -
Business Development in oil & gas industry
More than 16 years experience on electrical field
EXPERIENCES IN DESIGN, CONSTRUCTION,REVIEW,QC,PRECOMM AND COMM, COMPLETION ENGINEER
Material, Corrosion, Reliabilty Engineering techniques, Integrity Assurance Management
Scientist with proven experiences in lubricants, synfuels and alternative fuels research and product development. Ability to work, explore and adapt in new areas of business opportunities. Strong communications skills, pro-active and capable of coordinating internal and external customers.
Multi tasking experienced Geologist(MSC.)/ P.Engineer(PhD), looking for positions in geology/ reservoir engineering (even on entry level). I am fluent in many languages, willing to relocate Worldwide, available immediately. Presently living in Canada.
Creative, proactive problem solver, team player, detail oriented, intuitive, dedicated and accurate. With over 20 years of experience in the hydrocarbon production and process environment
Primavera, MS Project, SAP R/3, MAXIMO, MS Office Expert, Maintenance of Static & Rotating Equipments, Maintenance Planning
Drilling materials, procurement and logistics Management, Inventory Control, Warehousing, Shipping & Receiving, Team Building & Development, Exceptional Communication & Interpersonal Skills, Strategic Planning, Service Optimization, Profit Maximization, Budget / Cost Analysis, Self Starter, Inventor
Expeditor, SSLC, Bcom, Diploma qualified, 20 years Experience in working with ASME, AWS, API standard in EPC Industries upstream, onshore& offshore, seeking employment in your EPC industries, please find the attachment
Having more than 18 years experience in the related field.If I get chence, I will expose my duties and responsibilities to my superiors and to te company.Thank you.
I am 25 Years well Experienced Person worked in different plants (Oil & Gas, Power Plant, Petrochemicals, Utility,
Chemical process engineer with 18 yr's of Up- and downstream Oil & Gas experience
First
1
2
3
4
5
6
7
8
9
10
[ 11 ]
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com