Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #62554
next resume »»
CONTACT INFORMATION:
View contact information...
EMPLOYMENT SUMMARY
1) Fluor Daniel Consultant B.V, Kuwait as Engineer (Instrumentation & Control System Design) May 2007 onwards. With Kuwait National Petroleum Company (KNPC) at Mina Al-Ahmadi refinery for the Modernisation of Obsolete Instrumentation project (MOIP).
2) SNC Lavalin UK Limited, Kuwait as Lead Engineer (Electrical & Instrumentation) August 2005 to May 2007. Project with Kuwait Oil Company (KOC) for GC-27 New Desalter and Light Crude Train Modification & GC-27 Effluent Water Separation & Transfer and Minaguish Water Injection Plant Upgrade.
3) Siemens, Kuwait as Instrumentation Project Engineer. July 2003 to August 2005. Project with Kuwait Oil Company (KOC). 36" pipeline project for Ratawi/Burgan Crude from Wafra to Central Mixing Manifold and addition of new booster and export pumps at the export facilities in GC-27 for light crude oil. Addition of new Dual Tanks (Wet & Dry Crude Service) at GC-3, GC-6 & GC-8.
4) Middle East Control Services, Dubai as Instrumentation Project Engineer.
January 2003 to June 2003. Worked for various Tank Farm Projects undertaken by the company.
5) Kharafi National/ Al-Bahar Jacorossi, Kuwait as Planning and Maintenance Engineer. August 1998 to August 2002. With Ministry of Electricity & Water Supplies (MEW) (Kuwait).
6) Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India as Instrumentation Engineer. July 1995 to July 1998. Experience in Steam Generation Plant (3 streams of 170MT/hour, 106ata, 510 DegC Capacity each), associated water treatment plant & ammonia plant of 350MT/Hour Capacity.
7) Industrial Consulting Bureau (ICB) Ltd., Mumbai, India as Instrumentation Construction Engineer. October 1994 to June 1995. Instrumentation Revamping works at National Peroxide Limited (Kalyan, Mumbai). Partial Involvement in the erection of Polyester Oriented Yarn plant, Reliance Industries Hazira.
8) Toshniwal Brothers Pvt. Ltd., Mumbai, India as Instrumentation Marketing Engineer. October 1992 to October 1994. Oval wheel meters, turbine meters, vortex meters, density meters, temperature & pressure regulators, control valves, actuators, positioners, DP flow & level meters.
EMPLOYMENT HISTORY
Fluor Daniel Consultant B.V Kuwait (As Engineer Instrumentation & Control Systems Design) (From May 2007 onwards)
Activities:
* Review of Basic engineering design packages.
* Preparation of detailed instrumentation & control system specifications & specific requirements as per KNPC project requirements & applicable international standards.
* Preparation of technical request for quotations.
* Preparation of Master Drawing/document index for design and detailed engineering.
* Procedures for plant hot loop cutovers/ tie ins with existing system.
* Review of technical bid evaluations
* Technical response and correspondence with client on technical queries and other clarifications.
* Interaction and co-ordination with other engineering disciplines (Electrical, Mechanical, Civil, Process.)
SNC Lavalin UK Ltd., Kuwait (As Lead Engineer Electrical & Instrumentation) (From August 2005 to May 2007)
Activities:
* Preparation of the Scope of Work, detailed engineering, based on the feed document provided by the Client including detailed study of process flow diagrams, modification of P & ID's, preparation of instrument list, preparation of Rosemount(RS3)DCS, Triconex Emergency Shutdown System and Triconex Fire &Gas System, annunciation panels, interfacing panels input/output list.
* Segregation & finalization of various alarm and trip points.
* Study and modify the Cause & effect diagram.
* Involvement in HAZOP studies and further node wise preparation of HAZOP worksheets which include the deviations, causes, consequences, existing safeguards and recommendations.
* Detailed review of vendors' documents and drawings for Rosemount(RS3)DCS, Triconex Emergency Shutdown System and Triconex Fire &Gas System including panel general arrangement drawings, process graphics, interlock logic diagrams, interconnectivity drawings, wiring & termination details, communication block diagrams.
* Prepare detailed Bill of Material.
* Preparation of data sheets as per KOC specification & standards for various flow, level, pressure and temperature instruments, motor operated valves, air operated valves control valves etc.
* Responsible for the total instrumentation & electrical construction activity at site.
* Managing a team of engineers & supervisors.
* Execute technical duties in accordance with KOC project specifications and standards.
* Preparation of QA/QC Inspection test plans (ITP) and various checklists, calibration forms.
* Preparation of method statements for critical and high risk activities, tie-in lists & work procedures.
* Liaise with other disciplines on construction activities.
* Preparation of weekly progress reports.
* Preparations of monthly look ahead schedule.
* Liaise with the client on day to day construction activities.
* To carry out inspection at various stages of FAT (Factory Acceptance Test) for DCS, ESD & F&G systems. These stages include preliminary functional tests, heat soak tests, full functional tests, system communication tests, radio frequency immunity tests and Site acceptance test.
* Knowledge of the following international standards and recommended practices: BS5345, BS5501, IEC 60079 Selection, installation and maintenance of electrical equipment in potentially explosive atmospheres. BS5490/BSEN,IEC 60529 Specification for classification of degrees of protection provided by enclosures. BS5793/IEC60534 Industrial process control valves. NACE MR0175 Specification for sulphide stress cracking resistant material. API RP 551/554 Process Instrumentation & Control. ISO 5210/5211 Multiturn & Part turn valve actuators. BSEN 5167-1 Measurement of fluid flow by means of pressure differential devices. IEC 61131 Pt 1 to 5, 7 & 8 Programmable Controllers. IEC227/228, BS6346/6360 PVC insulated cables/conductors of rated voltages up to and including 450/750V. IEC331, BS6387 Fire resisting characteristics/ performance requirement of cables to maintain circuit integrity under fire conditions. IEC332 Tests on electrical cables under fire conditions. IEC 754 Part1/ BS6425 Part2 Tests on gases evolved during cables under fire conditions. BS5308 Pt.1 & 2 Specification for polyethylene insulated instrumentation cables/ PVC insulated instrumentation cables for intrinsically safe circuits. EEMUA 133 Specification for underground armoured cable protected against solvent penetration and corrosive attack.
* Conversant with the following KOC Standards & Specifications.
015-JH-1903(General Instruments), 015-JH-1904(Distributed Control system), 015-JH-1908(Instrument Installation), 015-JH-1909(Instrumentation for Packaged Equipment), 015-JH-1910(Mechanical Completion of Instrument Systems), KOC-I-001(KOC Standard for Instrumentation & Control System Design), KOC-I-004(KOC Recommended practice for shutdown system panels), 015-JH-1911(KOC Standard for Control Room Cabinets), KOC-I-005(KOC Recommended practice for F&G system panels), KOC-I-011(KOC Standard for Instrument Cables), KOC-I-013(KOC Standard for Motor Operated Valve Actuators)
NGEECO(Siemens), Kuwait (As Instrumentation Project Engineer) (From July 2003 to August 2005)
Activities:
* Preparation of Bill of Material.
* Preparation of data sheets as per KOC specification & standards.
* Technical and commercial evaluation of bids for various instruments.
* Preparation of detailed cable schedule, Instrument/Cable layout drawings, and wiring/termination diagrams for cabinets and junction boxes, loop wiring diagrams, pneumatic and process hook up drawings.
* Field supervision of the construction activities which includes cable trench excavation, structural and cable tray work, fabrication of instrument and junction box frames and foundations, cable laying, glanding, termination, interpanel cabling for Triconex Emergency Shutdown systems, Triconex Fire & Gas and Rosemount (RS3) & Honeywell(TDC3000) DCS panels, ESD panel & relay wiring, calibration of instruments, preparation of calibration, pre commissioning and commissioning checklists, continuity and loop checking, configuration supervision of DCS graphics and I/O points, integration with existing plant control system.
* Liaise with Client representative.
* Managing project schedules.
Middle East Control Services, Dubai (As Instrumentation Project Engineer) (From January 2003 to June 2003)
Activities:
* Preparation of the Scope of Work, detailed engineering for the various turnkey projects undertaken.
* Liaise with the client for various technical approvals.
* Preparation of various documents like instrument specification sheets, Functional design specification (FDS).
* Preparation of Piping and Instrument Diagrams, Cable Route layout Drawings, Control room layout drawing, general wiring diagram, and instrument loop diagram, and power distribution layout.
* Calling tender for the purchase of equipments, technical and commercial bid analysis.
* Carrying out inspection and Factory acceptance test (FAT) at vendor works.
* Preparation of commissioning and maintenance spare parts list for various equipments.
Kharafi National/Al – bahar Jacorossi, Kuwait (As Planning & Maintenance Engineer) (From August 1998 to August 2002) for Ministry of Electricity & Water Supplies(MEW).
Activites:
* Maintenance of field and control room Instruments at various sites associated with the water department of (MEW).
1. Preparation of periodic maintenance/annual maintenance schedules for all instruments at various pump stations.
2. Preparation and periodic updating of material list for consumables, spare parts, tools and equipment
3. Maintenance of history data sheet for equipment's performance analysis and troubleshooting.
4. Preparation of technical specification, scope of work, tender documents, preparation of engineering drawing etc. for any new construction or modification.
* Maintenance of various instruments associated with the mobile reverse osmosis units at various sites.
Rashtriya Chemicals and Fertilizers Ltd. Mumbai, India
(As Project & Maintenance Engineer)
(From July 1995 to July 1998)
* Worked as maintenance engineer in STEAM GENERATION PLANT (3 streams of 170 MT/Hr capacities Pressure 105 Ata & Temperature 510deg C) and associated water treatment plants revamping work.
* Was responsible for developing Instrumentation & control loop drawings, preparation of Instrument summary. Preparing instrument specifications, requisitions, updating and verification of P&ID schematics, electrical wiring diagrams, layout drawings etc.
* Was responsible for procurement of Instruments by sending enquiries to various suppliers, preparation of technical and commercial comparison statements, placing orders & regular follow up for timely delivery of items, installation and commissioning.
1. Conversant with the various boiler controls like boiler drum level control, super heated steam temperature control, furnace draught control and combustion control.
2. Conversant with burner management system for both oil and gas firing.
3. Well acquainted with boiler start up and shut down procedures.
4. Maintenance of electronic pressure and flow transmitters, flame-monitoring system with auto controls, zirconia and para magnetic type of oxygen analyzers etc.
5. Periodic maintenance and over hauling of control valves and on/off valves.
6. Worked in the associated water treatment plant and conversant with the normal, regeneration and back wash cycles and auto controls.
7. Calibration of pH and conductivity analyzers is carried out periodically.
8. Maintenance of turbo generator instrumentation with regular calibration and checking of protection pressure switches, Bentley Nevada vibration monitors etc.
Maintenance of Field & Control Room Instruments in AMMONIA PLANT of 350MT/ day capacity including CH4, CO, CO2 & H2 analyzers. Installation, service, calibration and repair of pneumatic and electronic flow, pressure and Temperature transmitters, current to Pneumatic Converters(I/P). FOXBORO Micro Controllers & TATA HONEYWELL TDC3000 Distributed Control Systems.
Industrial Consulting Bureau(ICB) Ltd., Mumbai, India
(As Instrument Construction Engineer)
(From October 1994 to June 1995)
Activites:
* As Construction Engineer for Instrumentation Revamping works at National Peroxide Ltd, Kalyan, Mumbai.
* Involved in partial erection of new Polyester Oriented Yarn (POY) plant at Reliance Industirs Ltd Hazira, Surat India.
* Instrument Installation, cable tray routing, cable laying, instrument tubing as per layout & installation drawings.
* Continuity & Loop checking.
Toshniwal Brothers Pvt Ltd.(Mumbai, India)
(As Instrument Marketing Engineer)
(From October 1992 to October 1994)
Activites:
* As Instrument Marketing Engineer for Oval wheel meters, turbine meters, vortex meters, density meters, temperature & pressure regulators, control valves, actuators, positioners, DP flow & level meters.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 8701 to 8750 of 10817)
Go to Search Parameters...
Brief Description
I am a high technician in gas exploitation (plant operator), I am working now for BP in Algeria at in salah gas. I will accept all regions.
„X Good computer skills „X Quickly attain competency in new skills „X Excellent public relation skills „X Ability to work in multi-disciplinary teams „X Driving license from 1994
Auto CAD, piping, mechanical engineer, piping designer, senior work preparator, piping installation
BSc in geology(pending)
Project Managements and project designing; Study, dimensioning and amelioration of thermique, hydraulic and frigorific installations; Study and conception of mechanical structures with the help of CAO (Solid works, AutoCAD, Catia...); Maintenance management and stock exchange of tools
Offshore Field Engineer Pipeline Electrical Automation Mechanical
I have been in the oil and gas industries for 13 years doing project coordinations and managing maintenance of equipments
Highly motivated, results and detail – oriented professional with 11 years of experience specializing in the Oil and Gas, Industrial, Construction and Residential Industries.
I have been a Firefighter since 1990 and am considered to be a keen and effective senior member of the Defence Fire and Rescue Service. I am a mature, self-motivated and well-organised person who enjoys a challenge. I offer reliability, punctuality and commitment.
My background encompasses over 10 years working experience in different industries.
Well versed in preparation & analysis of financial reports, implementation of policy & procedure & internal control
To achieve professional excellence, self development, advancement and improvement while enjoying job satisfaction and achieving cooperate goals EDUCATION University of Benin, Benin. B.ed. Adult Education.
IT SKILLS
Water resources management engineer (graduation expected early 2010) with a background in fluid mechanics and mechanical engineering. Various experiences abroad with proficiency in English and Spanish.
4 Years BE graduate, with 1 Year Diploma Fire safety Engineering, OSHA & Basic Life support train certificates.
Experience in instrumentation and control, P&ID, Wiring Schematic Diagrams, Process Flow Chart, Specifiying instruments, Strong Electrical Engineering Skills, PLC, DCS, MCC, strong analytical skills, stong knowldge in vaious engineering desciplines, microsoft office,
Free!
A young resilient Mechanical Field Engineer with the drive to undertake challenges and a Expertise in Supervising safety,mechanical maintenance,including pumps and turbines,spares and material control as well as managing projects
Experienced Equipment and Packaging Field Service Technician seeking a position in Technical, Mechanical, or Packaging Field.
Piping engineer with 10 years experience in oil field. Experienced in designing, supervising and construction of pipelines and piping for oil industry.
Experience in using AC Drives, DC Drives, Servos and Stepper Motors Proficient in PLC programming using Allen Bradley, Siemens and Omron PLC Proficient in HMI interfaces including Panelview, Maple, Omron systems Proficient in using RS Logix , Simatic Step-7, Omron CX-Programmer
University graduate with over 6 years of expirience in surveying and geomatics, both in the field and in the office.
technical translation (Russian, English), document control
I am an Instrumentation & Control Engineer by Profession. Review of my credentials will confirm that I have 15 years of experience in instrumentation, operations, maintenance & design.
Desalination Plant Maintenance/Inspection, Materials Testing, Technical Evaluation,Troubleshooting, Supervisory/Managerial Skills
Automation & Control System Engineer - PLC, SCADA, DCS, RTU, Software, Industrial Networking
PhD Offshore Dev.: Currently in Houston, TX helping in upstream equipment procurement; experiences with Oil Services Co. and in research/teaching petroleum engrg courses; had done reservoir/well modeling; fluent in English/Russian; available as an intl. Marine Surveyor (Inspector) trainee staff
I am certified welder and can perform different welding procedures such as 5G, 6G SMAW.and SAW. I have more than 8 years working experience in various manufacturing and Oil and GAs companies in different country such as Saudi Arabia, China and Malaysia. My current job was in KNM Special Process Equi
CSWIP Senior Welding Inspector
Diploma in Engineering in Electrical Instrumentation with 74.9% marks from ALIGARH MUSLIM UNIVERSITY (A.M.U.) in July 2000.Knowledge about the world class Manufacturing Practices (tools of TQM) like PFMEA, 7QC, SPC & MFO,Trained internal auditor for ISO 9001-2000 from QMI-INDIA
Professional formation in Petroleum Engineering with experience in Drilling Engineering. Wide knowledge in Drilling Software, planning, administration and control of Drilling Projects, SAP system, bid evaluation, and field operations. Languages: Spanish, English and German.
Skilled welder fitter, hard working level headed man who is ready to take on any task that is thrown my way. I am a fast learner and I m easy to get along with and I get along with others as well. I think I would be an asset to your company.
Project Controls Specialist, Project Services Manager, Project Controls Manager, Cost Control Manager
Warehouse exp looking for a change
State of Alaska Licenced Journeyman
Mechanical Maintenance of Refinery, petrochemical and Mining Equipments [Static n Rotary]
Over 20 years experience as Project / Construction Manager on overseas assignments. Extensive experience in pipe design, fabrication and inspection of refineries, LNG plants, chemical plants, power plants, pipelines and mining facilities. After college, started a career as a craft pipe fitter in Hou
Undergone training in Industrial Automation using PLC & SCADA
14 years of diversified project management and controls experience (EPC) in the oil and gas industry (up and down stream). Assignments include: Project Manager, Project Controls Manager, Lead Scheduler, and Lead Cost.
Heavy Lift Manager
Skilled Senior LEVEL II RT Technician with 30 Yrs experience
2D / 3D Design Consultant, 13 years Oil & Gas Experience starting with 4 year mechanical apprenticeship. Having worked in Aberdeen, Scotland and Oslo, Norway on surface and subsea production equipment (EDP, LRP, BOP, Xmas Trees, etc).
NDT & corrosion&welding engineer, participate in large project in Egypt and in Sudan
Total working experience 06 years. DCS operator with 06 years of diversified experience in the field of petroleum refining industry. Have been performing shift duties at Attock Oil Refinery, at Naphtha hydrotreator & Catalytic Reforming unit as Control Room Operator. Well versed with the
Bachelor of Science in Physics.truck license driving
Fresh Chemical engineer had an internship & training, had computer skills with many softwares, Fluent in English as Arabic, & he is looking to prove him self as a success engineer in challenging work.
I'm seeking a job especially through the export-import sector.
Survey Crew (Party Chief) (Instrument Operator) Dear Sir, We have recently been laid off because of lack of work . I appreciate your consideration and look forward to hearing from you. Sincerely, Doug McKay
Engineering Physics graduate looking for an entry level job: Environmental, ocean, weather, energy, gas, oil, R&D.
Instrument Technician
I’m a chemical engineer with 6 years experience worked as process engineer, operation engineer on a NGL plant
First
Prev
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
[ 175 ]
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com