Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #63314
next resume »»
CONTACT INFORMATION:
View contact information...
Country, date of birth: Indonesia, December 08, 1971
Sex: Male
Marital Status: Married
Educational: Engineer (Sepuluh November Institute of Technology, ITS, 1996 Graduate)
Course: 1. Safety course
2. Helicopter and Sea Survival Course, Malaysia, (2003)
3. H2S Competence Course, Malaysia, (2003)
Nationality: Indonesia
Lenguage: 1. Bahasa Indonesia
2. English
Computer Software: MS Office, Instrucal
EDUCATIONAL BACKGROUND
Formal Education
1981: Graduated from Elementary School
1987: Graduated from Junior High School
1990: Graduated from Senior High School
1996: Graduated from Faculty of Industrial Engineering
Engineering Physics Field – Instrumentation Engineering Subject
Sepuluh November Institute of Technology, Indonesia
EMPLOYMENT RECORD
July' 02 – July' 07: Sime Darby Engineering Sdn Bhd, Fabricator, Malaysia
1. B 11P-A Production Topsides (10,000 MT) Fabrication & Offshore Hook Up
Period: July'02 – May '03 ( 11 months in engineering and fabrication)
Position: Instrument Lead Engineer
Client: Sarawak Shell Berhard (SSB)
Project brief:
To produce dehydrated gas and condensate prior to exporting via B 11DR-A to E 11R-BA, the B 11 Complex has been designed as a Not Normally manned (NNM) complex and being designed for SIPROD (simultaneous production and drilling operation) with sour (H2S) service facilities and to handle 2 x 600 MMSFD dehydrated gas. For gas dehydration, two units twister are installed to replace the conventional glycol system. This platform is first platform operated Twister to dehydrate gas in the world. The overall complex instrumentation system comprises a Yokogawa Distributed Control and Computer Assisted Operation System (DCS-CAO) to handle more than 850 I/Os and to be supported by 17 RIOS. The safety system comprises an Instrumented Protective System (IPS) to handle more than 550 I/Os, a Fire and Gas System (FGS) to handle more than 700 I/Os
2. CNR BAOBAB IVOIRIEN (MV 10) FPSO Topsides (19 Modules) Fabrication
Period: June '03 – Jan '04 (8 months in fabrication)
Position: Instrument Lead Engineer
Client: MODEC International LLC
Project brief:
West Africa FPSO was owned by CNR International and to have rated capacity 70000 bopd, 75 MMscfd gas, 70000 bwd, 10000 bwd, (for sea water injection). This FPSO have 7 modules for pipe rack, Production separation module, IP Separation Module, Oil Treating module, Utility module, Power Generation module, Booster Gas Compression Module, Water Injection Module, Dehydration Module, E-House, Flare System module and Lay down Module.
3. Guntong – E Topsides (12,500 MT) Fabrication & Offshore Hook Up
Period: Feb '04 – Aug '05 ( 12 months in fabrication, 8 months Offshore Hook Up and Commisioning)
Position: Instrument Engineer
Client: Exxon Mobil Exploration and Production Malaysia Inc. (EMEPMI)
Project brief:
Guntong E is a compression platform designed to process and compress non-associated gas from, Gu-A, Gu-B, Gu-C, GuD-C, Tapis, Tabu, Telok and Bindu, to handle 540 MSCFD of gas, 30 KBD of hydrocarbon liquids and 15KBD of produced water. The main equipments are 3 x 22 MW Rolls Royce Turbo-Compressor for gas compression, 3 x 2.7 MW of Solar Turbo-Generator for power generation and Glycol Gas Dehydration System capacity of 540 MSCFD to meet sales gas specification of 6 lb/MSCF. The overall complex instrumentation system comprises a Honeywell Distributed Control and Computer Assisted Operation System (DCS-CAO) to handle more than 846 I/Os. The safety system comprises an Instrumented Protective System (IPS) to handle more than 516 I/Os, a Fire and Gas System (FGS) to handle more than 746 I/Os and Gai Tronics Intra-Platform Alarm and Communication System (GPA/PAPA). The field data from field instruments are transferred to Controller via hardwire system. Inter module communication system to be handled by fiber optics.
4. SUDP-A Drilling Topside (2000 MT) (EPCC Project)
Period: Sept '05 – Aug '06 ( 14 months in engineering and fabrication)
Position: Instrument Lead Engineer
Client: Petronas Carigali Sdn Bhd (PCSB)
Project brief:
SUDP-A platform will be 2000 MT topside which can accommodate up to 28 conductor slots, unmanned with PMCS and Independent SIS/FGS system. The PMCS will be a Hybrid system and consist of a unified DCS with Foundation Fieldbus (FF) capability with associated equipment and utilizing industry standard hardware and software connectivity, integrates plant control and monitoring functionality with sequence logic capabilities and easy to use object based graphical user interface. SUDP-A will be supported by 179 nos of FF equipments, 4 nos of RIOS, 118 I/Os for FGS system and 632 I/Os for SIS system.
5. SUPG-B Central Production Platform (7,5000 MT) (CPP) (EPCC Project)
Period: Augt '06 – Sept '07 ( 14 months in engineering and fabrication)
Position: Instrument Lead Engineer
Client: Petronas Carigali Sdn Bhd (PCSB)
Project brief:
Sumandak Selatan Platform (SUPG-B) is designed and to be developed as an Integrated Central Processing Platform, which will accommodate 18-slot drilling facilities, oil and gas processing facilities and water injection facilities in modular arrangement. It is to be developed as a remote platform to Samarang field with normally unmanned facilities as well as with capability for remote operation.
The PMCS shall be a Hybrid system and consists of a unified Distributed Control System (DCS) with Foundation Fieldbus capability and associated equipment and utilising industry standard hardware and software connectivity, integrates PMCS Plant control and monitoring functionality with sequence logic capabilities and easy to use object based graphical user interface. This will reduce the hook up work offshore and to reduce the problems of cable and panel congestion including multiples segregation.As much as possible the third party interfaces with other systems shall utilize Ethernet MODBUS TCP/IP or serial RS485 MODBUS. SUPG-B will be supported by 313 nos of FF equipments, 412 I/Os for FGS system and 751 I/Os for SIS system.
Responsibilities:
* To monitor and ensure that any drawing generated by the design work output is properly established to reflect all the required design detail.
* To plan, organize and co-ordinate the disciplinary MTO to meet specification within schedule for quality output.
* To manage and monitor issuance of construction drawings based on master planning package.
* To prepare weekly progress report and take apart on weekly progress meeting.
* To clarify and ensure the engineering design documents (specification, data sheet, hook up drawing, layout drawing, etc) are constructible and maintainable.
* To review and check the shop and fabrication drawings once the drawings issued.
* To perform the technical evaluation or any tender document submitted by Vendor.
* To clarify vendor quotation technically and to take apart in kick of meeting under procurement section co-ordination.
* To coordinate with Client's representative in instrumentation, suppliers and sub-contractor regarding work on the related equipments, material and manpower.
* To coordinate with procurement in vendor quotation technical evaluation, verification, review and approve the vendor drawings.
* To monitor and control instrument material status.
* To coordinate with other discipline engineers, superintendents, supervisors, etc on interdisciplinary matters and to communicate projects details between all members of the interdisciplinary team as required to assure continuity and integrity of design and construction
* To liaise with Material Controller in material inspection and material ship loose preparation.
* To liaise with Structural discipline in weight control report (WCR) preparation and checking.
* Perform the site technical query (STQ) to propose design change or material change to client due to any discrepancies between design and actual condition.
* To liaise with Project Management Team and Client on all engineering matters.
* To do site verification and prepare modification drawings if required.
* To visit the scope of work and the related contract documents to prepare the construction work packages.
* During hook up stage, my duties are to coordinate the offshore jobs, to monitor and update the daily progress, prepare the daily progress report.
* To involve in the daily progress meeting and safety meeting with client's team and monitor the material status through material tracking list.
* To prepare all necessary check sheet and test report for all related materials and equipments.
* To solve the technical problem and perform the site modification.
* To review as built drawings.
* Fully assist commissioning team during in troubleshooting during offshore hook up and commissioning.
July' 01 – Jun' 02: PT TRIPATRA (Engineers and Constructors), Jakarta, Indonesia
Position: Instrument Lead Engineer
Client: Unocal Indonesia Company (UIC).
Project:
1. Serang FA Platform Expansion Module.(Detail design)
2. Attaka F Platform Gas Engine Replacemen (Detail design)
3. Sapi Drilling Platform (Front End Engineering Design).
Responsibilities: In co-ordination and control instrument work activities, including,
* To provide special expertise to supplement the UIC project technical staff diversified knowledge of engineering principles and practices to project engineering, support execute and complete the engineering design of UIC project.
* To represent the discipline on the UIC project and resolve technical questions and co-ordinate work.
* To supervise and provide technical guidance to subordinate engineers.
* In co-ordination with the Project Engineer supervise the assigned Engineers and Designers.
* To prepare discipline detailed planning and schedule and report to Project Engineer.
* To verify the design within the discipline in accordance with Engineering Procedure to substantiate the design, taking the importance in safety, complexity, degree of standardization, state of art and similarity to the previously proven design, assumption, etc.
* To squad check of other discipline document which relating to instrument standard requirement.
* Performing Instrument system design and analysis.
Jan' 97 – Feb' 01: PT. Inti Karya Persada Tehnik (IKPT), Engineers and Constructors, Jakarta, Indonesia
Position: Instrument Engineer
Client: PT Badak NGL Co.
1. Bontang LNG Reliability Enhancement Project. Train A-D DCS Retrofit & Instrument Upgrade, Train A-F ESD/EDP System Upgrade, Train A/F Fire Water Deluge System Upgrade in East Kalimantan, Indonesia.
Responsibilities
* In co-ordination Instrument Site Survey.
* To co-ordinate field engineering, in modification of existing Instrument system (develop existing P & I Diagram, Instrument Location Plan, Instrument Wiring Layout, Instrument Wiring Diagram, Instrument Connection List, Instrument Cable Schedule, Installation Standard and Instrument Material Take Over.
* To co-ordinate and supervise the installation, inspection and testing.
2. Bontang Train H (EPCC Projec)t, East Kalimantan, Indonesia.
Responsibilities:
* Involved in Detail Engineering for preparation, review and checking Instrument Index, Field Instrument Specification, Data Sheet, Vendor Document associates and Factory Acceptance Test.
* To provide technical assistant and supervise the field Instruments calibration, inspection, testing, loop and functional test in construction stage.
* Involved in commissioning and start up.
* In co-ordination and preparation of take over Loop test documents and daily progress report to Client.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2501 to 2550 of 9901)
Go to Search Parameters...
Brief Description
Offers more than ten years of versatile experience in all phases of petroleum, gas, and alternative production facility operation. Equipped with a master’s degree in chemical engineering and a background in the development of PFDs and P/IDs. Excels at risk/hazard review and mitigation.
13 years experience as E.A. & have worked with Top Official’s of industries like mfg., service, infrastructure project, telecom, etc. Given that the whole exp. is with different ind. ,the exposure was across ind. & across functions, thus a rich experience of managing Top Management office.
Project Engineering, Project Management, Mechanical Engineering, Piping Engineering
Professional DCS expert with 8 Years experience in process automation projects for pharma, oil & gas sector, Lead engineering and Project Engineering experience.
Criminology graduate but all my working experiences are on construction, safety, health and environmental safety on Oil and Gas Drilling and Petrochemical Industries
Mud engineer
Designer (In J Ray McDermott Engineering Services Private Limited, Chennai, From Aug. 2007 to Jul.2008
Provides guidance and professional support to senior management regarding business improvement, economics, key issues and present any suggestion to Senior Management and Shareholders. Establish and supervise the Balance Scorecard. Lead the team in the development of Working Systems. Work as a Projec
8 years experience as a Drilling Engineer, Drilling Supervisor, Directional Driller & Well Performance Engineer(Onshore & Offshore).
Mechanical Commissioning & Maintenance, Maintenance Planning Scheduling
TO BE ASSOCIATED WITH AN ORGANISATION THAT PROVIDES CHALLENGES APPROPRIATE TO MY CORE SKILLS IN AN ENVIRONMENT THAT NATURES AND PROMOTES A CULTURE OF CONTINUOUS LEARNING AND GROWTH
Process Engineer
Well Site Supervisor ( completions / workovers / production ) Great team leader.
I worked five years of the oil field to the national company of geophysics (ENAGEO) in south of Algeria as land surveyor engineer and two years of the mining field to the company of the barite mines (SOMIBAR) in north of Algeria as engineer surveyor
Extensive equipment/software operation experience compassing hydrographic, seismic, sides can sonars, sector scan sonars and magnetometers. Experience in online data acquisition, data quality control, processing, interpretation and collation of reports.
1.Accurately process and record all technical documentation in accordance with agreed procedures. 2.Input progress mark-up information into Document Management System (DMS). 3.Receive, check accurately record into DMS system and distribute all project technical drawings and documentation
Educational Qualifications:1. Master of Technology in IndustrialSafety Engineering from NIT, Trichy with 85% marks (8.5 CGPA) 2. B.E in Mechanical Engineering with 81.77%. Experinece: 1. From August 2006 to till now - Working as Safety Engineer in Mina Abdullah Refinery of KNPC
GIS Consultant
Instrument & Control System Design Engineer
I had worked as Development & Design Engineer in Jordan Petroleum Refinery for several years .My work includes Design of static and rotary equipment according to international codes.Also Im holding Master degree in mechanical Engineering that gives advantage to go through research and development.
Analytical Chemist in the field of QA/QC/R&D for Beverage and Water Treatment
HR specialist
Sr. Engineering Technician with 15+ years of industry experience at both Regional and Corporate levels. Highly proficient with Aries and Microsoft Office as well as an IT background.
Graudate, Experience in Various Power Station / Infrastructure Admin / Secretarial Position
Have extensive back ground on ship safety inspection and Maritme industry
Business Analyst-Information Technology
ATTENDING BREAKDOWNS IN PLANTS
6 yrs exp.in fired heaters of peroleum .involved in design /documentation & cordination with other discplines
Geologist with a very strong experience in most of the oil/gas drilling operations
A highly qualified, talented and result driven marketing management professional, an AMIE and also holds a diploma in maintenance management with an experience of 15 years in the maintenance, Reliability Engineering as well as conditioning monitoring of rotating machinery. A dynamic, team spirited
More than ten years experience involving in Basic Design & Detailed Engineering, Construction and commissioning in Oil & Gas field. Extensive experience in all phases of Instrumentation Engineering starting from Feasibility Study, Basic Engineering Design Data, Design & Detail Engineering, Construct
Gas Turbine Repair Engineer
B.E., (Bachelor in Industrial Engineering from Indian Institution of Industrial Engineering),
B. Sc. Chemistry (Grade Good)
Applying Insulation and Sheet metal Cladding.
Design, Consultancy, R&D in Civil, Structural, Geotechnical, Architectural and Industrial Engineering
16 years of Piping & Pipelines Projects execution experience in the Industries Refinery, Hydrocarbon and Oil & Gas (Project piping, pipelines, Tanks, structurals, equipments). Knowledge of ASME Sections, ANSI, API & DIN codes /Standards.
Plant operation in methanol plant, hydrodesulphurization, reformer, compressor, turbine, pumps, exchangers, distillation, tankform.
Sr. Structural Engineer-Ports, Marine & Offshore 8 years experienced, with knowledge of SACS, StaadPro, SAP
Skills are; mechanic, HVAC, heavy equipment etc.
Experience in project and construction management of EPC projects in the Oil and Gas Industry and building projects
Project engineerig
Worked as Civil/Structural desgner and piping as well. Perform basic design calculation, planning, scheduling, project evaluation, specifications, bill of materials & cost estimates.
Result driven senior executive offering over 29 years of experience and success in driving operational growth, leading start-up and turnaround efforts, maximizing growth opportunities and ensuring compliance with legal and regulatory requirements.
Transmission Engineer for Fiber Optics, Microwave & VSAT System w/ 20 yrs experience
Chemist Search a job in regard to my education and experience I have been working in different petrochemical and petroleum industries for the last 10 years at various senior positions and two years of metal protection surface chemicals sales experience.
Diploma in Electrical Engineer. AutoCAD. Word. Excel. Windows.
Sr.Mechanical Engineer having 16 yrs of Experience in Petrochemical, Oil&Gas field
Experienced Engineer with 15+ years of on job experience. Conversant with ISO ,international standards and Oil and Gas industry requirements. Can lead a team of inspectors .Has worked in Saudi Arabia, Yemen, UAE and Kazakhstan. Largest contract Value 1.3 Billion USD.
Being a petroleum engineer and having many years of experiences on middle eastern countries ( OMAN,UNITED ARAB EMIRATES, QATAR, IRAN...) could merit for any advertised jobs.
First
Prev
[ 51 ]
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com