Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #64383 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE:

Seeking Position as a Reservoir Engineer

EDUCATION
August 2001-July 2003 Master Degree in Petroleum
Department of Petroleum Engineering
Texas A&M University
College Station, TX, USA

January 1999-March 2000 Specialist in Reservoir Engineer
Simón Bolívar University "USB"
Caracas, Venezuela

March 1990-June 1996 B.Sc. Petroleum Engineer
University Central of Venezuela
Caracas, Venezuela

LANGUAGE ABILITY
Spanish: Native speaker
English: Good

SKILLS AS A RESERVOIR ENGINEER
Iidentification and evaluation of development opportunities as well as the ongoing management of the reservoir performing the follow activities:
1. Decline Analysis (Skill level: Advantage)
2. Water, Gas, and Oil Production Analysis (Skill level: Advantage)
3. Fluid quality control for Gas and Oil fluid samples (Skill level: Advantage)
4. RFT/MDT pressure analysis (Skill level: Advantage)
5. Well Test Analysis (Build up, Fall off, DST analysis (Skill level: Advantage)
6. Gas and Oil Reserves Estimation (Level: Advantage)
7. Simulation of Thermal Heavy oil, and Gas (Skill level: Medium)
8. Conventional and unconventional Petrophysic Evaluation (Skill level: Basic)

WORK EXPERIENCE

July 1996-ACTUAL PDVSA-INTEVEP
Research center and Technological support. Branch of PDVSA.
Urbanization Santa Rosa. Sector the Drum, Teques. State Miranda.
Section 76343, Caracas1070A, Venezuela

EMPLOYMENT HISTORY

In 1995 "Simulation of a pilot area with a water injection process in the VLE-05 reservoir in the Maracaibo Lake, Venezuela". Preparation of work's thesis at the Universidad Central de Venezuela to get B.S. Petroleum Engineer:
Software used: Eclipse 100
Responsibilities and achievements:
1. - Looking for geological, petrophysic, production rates, completion wells, pressure (RFT/MDT) and fluid (water and oil properties) laboratory report.
2.- Quality control for this data.
3.- Generation of the eclipse database file.
4. - Initialization of the simulation, history match, and forecast production.

In 1996 "Thermal Simulation (Cycle Steam Process) of a pilot area of Bachaquero Field, Venezuela"(PDVSA-OCCIDENTE)
Software used: CMG STARTS
Responsibilities and achievements:
1. - Looking for geological, petrophysic, production rates, and completion wells, pressures (RFT, pwf and whp) and fluid (water and gas properties) laboratory reports.
2. - Quality control for this data.
3. - Generation of a STARTS database file.
4. - Initialization of the simulation, history match, and forecast production.
5. - Conclusions and Recommendations

In 1996 "Reservoir Study of Lagunillas Inf-07. Phase One (Search and Quality Control Information)" (PDVSA-OCCIDENTE)
Software used: Microsoft Word, Excel and PowerPoint.
Responsibilities and achievements:
1. - Looking for production rates, completion wells, pressures (well tests, RFT/MDT) and fluid (water and oil properties) laboratory reports.
2. - Quality control for this data.
3.- Co-Management

In 1997 "Reservoir Study in Lagunillas Inf-07. Phase two; Fall-off Analysis & Decline Analysis"
(PDVSA-OCCIDENTE)
Software used: Microsoft Excel
Responsibilities and achievements:
1. - Looking for well tests, and fluid laboratory reports.
2. - Quality control for this data.
3. – Fall off analysis
4. – Decline Analysis Production
5. - Conclusions and Recommendations

In 1997 "Conventional SAGD Simulation for Bachaquero Field, Western of Venezuela" (PDVSA-OCCIDENTE)
Software used: CMG STARTS
Responsibilities and achievements:
1. - Looking for geological, petrophysic, production rates, completion wells, pressures (RFT, pwf and whp) and fluid (water and gas properties) laboratory reports.
2. - Quality control for this data.
3. - Generation of a STARTS database file.
4. - Initialization of the simulation, history match, and forecast production.
5. - Conclusions and Recommendations

In 1998 "Reservoir Study in Lagunillas 05; Differences between vertical and horizontal wells" (PDVSA PDVSA-OCCIDENTE)
Software used: Microsoft Excel
Responsibilities and achievements:
1. - Looking for production rates, completion wells, pressures (RFT, well tests) and fluid laboratory reports.
2. - Quality control for this data.
3. - Performed decline curve analysis.
4. - Conclusions and recommendations

In 1999 "Reservoir Study in Barinas; Analysis of Water Control Diagnostic using Chan plots" (PDVSA-SUR)
Software used: Microsoft Excel
Responsibilities and achievements:
1. - Looking for gas, water and oil production, RFT pressures and fluid laboratory tests
2. - Quality control for this data (PVT laboratory tests and production rates)
3. - Water production was evaluated using Chan plots
4. - Conclusions

In 2000 Thesis work "Generation of an oil compressibility correlation (Co) for Black Oils (with high API and Low gas-oil ratio)" (PDVSA-SUR)
Software used: Math software (Statistics Software)
Responsibilities and achievements:
1. - Literature review (previous work about Co correlations, and laboratory reports)
2. - Looking for gas, production rates, and fluid laboratory report
3. - Quality control for these PVT data for Barinas and PVT reports found on literature review.
4. - Adjusted of a new Co correlation for Oil's with high API and low GOR for Barinas' oil.

In 2001 "Analysis of a five wells pattern WAG process in B-6-X.10 reservoir, Tía Juana Field, Venezuela" (PDVSA-OCCIDENTE)
Software used: MBAL and Excel worksheet.
Responsibilities and achievements:
1.- Looking for gas, water and oil production, completion wells, gas and water injection rate information, pressure (RFT, pwf and whp) and fluid (water and gas properties) laboratory report.
2.- Quality control for these data.
3.- Decline analysis for and Production analysis for each producer well.
4.- Conclusions and Recommendations

2001-2003 (Master Degree in Petroleum Engineer at Texas A&M)

In 2003 "Generation of a Material Balance Equation for Abnormal Gas Pressure Reservoir (IGIP for Abnormal Pressure Gas Reservoir)" Volumetric gas reservoirs that have abnormal pressure need a special care when there are going to perform a material balance because they have a dual p/z vs rate behavior. For this work I checked previous work, analyzed the mathematical fundaments and manipulated those to get an iterative work sheet in excel to do the Material Balance. This MB only use production data instead some methods that need laboratory data. (This work was my work's thesis to get the Master Degree Petroleum in Texas A&M University)

In 2004 "Simulation Study for Horizontal Wells in 11M-269 reservoir, Acema 200 Field, Venezuela" (PDVSA ORIENTE)
Software used: Eclipse 100.
Responsibilities and achievements:
1. – Looking for production rates, completion wells, pressures (well tests, and RFT) and fluid (water and gas properties) laboratory reports.
2. - Quality control for these data.
3. - Generation of the eclipse database file.
4. - Initialization of the Simulation, history match, and selected several sceneries to evaluate.
5. - Conclusions and Recommendations

In 2005-2007 "Unitization Projects between Venezuela and Trinidad & Tobago (Blocks 6d in T&T, and 1 and 2 in Venezuela)"
Software used: Microsoft Excel for IGIP, Prizm for Petrophysic Evaluation, and PanSystem for DST Analyses.
Responsibilities and achievements before the exchange data:
1.- Coordinated the information search for Venezuela Share such as DIMS, drilling reports, seismic raw tapes and Venezuela Interpretations, production tests, completion wells, pressures (RFT, and DST) and fluid (water and gas properties) laboratory reports.
2. - Coordinated the generation of data pack.
3. - Coordinator of technical meeting between the Venezuela and T&T teams in Venezuela and Trinidad.
Responsibilities and achievements after the exchanged date:
1. - Quality control for T&T data pack.
2. - Analysis of pressure data (MDT): Generation of fluid gradients, and contacts
3. - Comparison of results again wells of Venezuela and T&T. (Generation of structural sections to evaluate the reservoir continuity)
4. - No-conventional petrophysic evaluation for seven shaly sands.
5. - Well test analysis of seven DST.
6. - Selection of the basic reservoir parameterizes for each of seven reservoir (Loran-Manatee Field) and four (Kapok-Dorado Field)
7. - Generation of the Volumetric Gas Factor (Bg)
8. - Estimation or OGIP and reserves
9. - Distribution of reserves of each country.
10.- Conclusions and Recommendations

PUBLICATIONS
1. Spaced Drilling Evaluation in C2/VLE-305 reservoir, Block V Lamar". May_1996.
2. Evaluation of Exploitation Alternatives in Bachaquero-01 reservoir, using IAV, Horizontal, and Vertical Wells, INT-STE-00729,96.
3. Exploitation Recommendations for Bachaquero-01 reservoir, INT-STE-00730,96.
4. Analysis and Design of a System of Information for a Reservoir Called "SINPEY", INT-03464,97.
5. Guide "DRASTIC", INT-M-00206,97.
6. Integrated Study in Lagunillas Inferior 07 Reservoir, Venezuela. INT-STE-01276,97.
7. Conventional Black Oil PVT Quality Control in LGINF07, LAGUNA 38 y LAGUNA 44 Fluid Samples, INT-4718, 1998.
8. Design of Well Files Worksheet for LL-07, Reservoir, INT-4703, 1998.
9. Audience of the Information for LAGUNA 05, LAGUNA 38 y LAGUNA 44 Reservoirs, INT-5123, 1998.
10. Analysis of A Steam Cycle Injection Process for LGINF07 Reservoir, using OFM, INT- 5415, 1998.
11. WAG Analysis Report for B-6-X.10 Reservoir, using Eclipse, IT-OC-2000-253, TJ, Sep_2000.
12. Well Productivity and Water Production Analysis in B-6-X.10' Reservoir, INT-8066, 2000.
13. Quality PVT Control and Synthetic Generation of a PVT Analysis using Eclipse for B-6-X.10 Reservoir, INT-8068, 2000.
14. A QUADRATIC CUMULATIVE PRODUCTION MODEL FOR THE MATERIAL BALANCE OF ABNORMAL PRESSURED GAS RESERVOIR, July_2003.
15. Guide for Condensate Gas Wells Sampling and Quality Control in Gas Condensate Wells, INT-10351,2004.
16. Simulation Study for Horizontal Wells performed in 11M-269 reservoir, Acema 200 Filed, Venezuela, INT-10291,2004.
17. What is a Reservoir UNITITATION Process, INT-10605, 2005.
18. Unitization Project between The Bolivarian Republic of Venezuela and Trinidad & Tobago, INT-10606, 2005_1st Phase (CONFIDENTIAL)
19. Unititation Project between The Bolivarian Republic of Venezuela and Trinidad & Tobago, INT-10606, 2005_2nd Phase (CONFIDENTIAL)
20. Petrophysic Evaluation Models for shaly Sandsl, INT-XXXXX, 2006.
21. No-conventional Petrophysic Evaluation for Block 2 and 6d, INT-XXXXX, 2006.
22. Impact over IGIP and Reserves of the Double Water Model used to Estimate Petrophysic Parameters, INT-XXXXX, 2006.
23. SPE 90560 "A Quadratic Cumulative Production Model for the Material Balance of an Abnormally Pressured Gas Reservoir". Year_2004.

REFERENCES
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1351 to 1400 of 9871)Go to Search Parameters...
Brief Description
Open-Hole / Cased-Hole Well Log Analysis - Clastics and Carbonates
13 years of work experience related to Petrochemical, Power System, Oil and Gas Industry, Building and Infrastructures. Experience has been in the capacity of Electrical and Instrumentation Supervision, Field Inspection, Source Inspection/Witness Testing and Pre-commissioning.
B.Comm,13 years experience in oil andgas industry,SAP literate,MS Office literate
13 years of experience in Engineering Projects & Maintenance, design engineering, construction and commissioning of instrumentation in petrochemical and chemical industries involving detailed engineering including, project estimation, preparation of instrument specification, comparison statement ,pr
HIGH LEVEL ENGINEER EXCELLENT EXPERIENCE IN THE PETROLEUM/OIL INDUSTRY, MULTI-TASK WORKER, TRILINGUAL, SKILL TO CREATE GOOD ENVIROMENT AT WORK, COMPROMISE TO EXECUTE PROJECTS ON TIME AND BUDGET, HAPPY TO LEARN NEW EXPERIENCE AT WORK EVERY DAY.
Petroleum_ maintenance planning engineer in Qatar Petroleum
Degree in Mechanical Engineer with distinction , Certified Vibration Specialiest from Vibration Institute, USA .Having 13 years of experience in Reliablity Enhancement , troubleshooting & Maintenance support of Rotating Equipments
Proven experience in open and case hole waveform processing and Formation evaluation Processing and Interpretation. Knowledge of geophysical exploration and 2D and 3D interpretation, depth conversion and velocity modelling.
Graduate Mechanical Engineer with over 12 years experience ( presently working as ¡§Senior Mechanical Engineer (Reliability)¡¨ and additional responsibility as ¡§Shutdown Project Leader¡¨ for Gas-To-Liquids:GTL plant in Qatar ) in an operating environment with hands on experience in RELIABILITY
• More than twelve years of experience in planning and scheduling and project control which have mostly been achieved during the course of execution of multimillions dollars project in Oil, Gas and petrochemical fields inside the country Iran and Turkmenistan (In all type of projects: E, EP, EPC, MC
CSWIP 3.2 , AWS-CWI qualified welding inspector and having 10+ years experience in welding inspection
Extensive experience as a Sales & Operations Manager with recognized ability in Strategy Development within the Oil industry in Venezuela and in the LA region. Excellent relationships with PDVSA & Venezuelan Government, Proven experience in negotiating with LA Oil Companies, develop business ventur
Experienced in power plant, utilities and offsites plant operation and commissioning
In The field of HSE
An internationally experienced more than 13 years as Professional Inspector / Inspection Engineer involved in Inspection of In-service – Baseline / corrosion monitoring, Turnaround, Shop fabrication / Erection of Vessels, Tanks, Piping, valve components,
Administration,HR, Logistics
18 years petrochemical experience, senior engineer
Clerk / Radio Operator / Logistics
RESERVOIR ENGINEER; WELLTESTING; FORMATION EVALUATION; SIMULATION
Extensive “hands on” procurement management experience both international & domestic.
A senior professional with 22+ years of rich experience in Project Management, Inventory Management, Operations Management, Documentation Management; presently associated with Voltas Ltd, Qatar; seeks senior level opportunity preferably in on shore - off-shore oil/gas projects.
International Business Development Manager, with over 14 years diversified experience in the oil and gas industry. Developing new business opportunities worldwide. Located in Dallas, TX.
Welder with 6G certification,Qualified boilermaker/pipe fitter with 20 years experience. Done H.LO and Helideck Firefighting courses. Have survival, H.U.E.T certificate and yellow fever certificate
This is to express my keen interest in pursuing an opportunity at your organization. At present I am pursuing in ADITYA BIRLA GROUP VIKRAM CEMENT.
Experienced distribution center in-charge, materials planning and control handler, and warehouseman (total 14 years) and mechanical engineer in practice as power plant maintenance and engine tender. Computer literate, resourceful, constructive decision maker. Easily adapts to any working environment
Field Ops. Oil & Gas. Enviroment assessment & Remediation. Ground Water Specialist. Supervisor Explosives/HSE/RA material. Various Geologic Softwares
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer
16 Years of Experience; Experience in managing the Quality control & Quality assurance activities for large integrated engineering projects. Exposure in vendor documents, correspondences with client, vendor, carrying on stage & final inspection with client. Exposure to International code
Planning & Scheduling by Primavera P3; Structural Design by STAAD-PRO 2004
Well rounded trainer/instructor/worker who is willing to be a part of a team whose primary goal is safe and effective work efforts. I am fully European standards trained airport/commercial property fire fighter and also multi skilled in various areas such as mechanics and repairs.
Over 20 years (5-1/2 years in India and 15 years in Gulf) of experience in the field of Pipelines in reputed Engineering Consultancy firms. Worked as a Lead Pipeline Engineer for various PDO (Oman) and Saudi Aramco Oil/Gas cross country pipelines and in-plant pipeline tie-in projects.
Over 20 years of diversified experience in Quality system Management, Environmental Management Project Management, Contract Management, Customer Satisfaction Management (CSM), Customer Relation Management (CRM), Contract and Scope Calibration, Technical and legal evaluation, Contract Regulation Mana
Metallurgical/Materials Engineering, failure analysis of gas turbines components, remaining life assessment, gamma prime growth morphology in nickel-base superalloys, high temperature coating degradation and failure mechanism, creep behavior of the alloy, fatigue crack initiation and growth
Corrosion control, cathodic protection
Electrical and electronics engineer with 24 year experience in a major fertilizer, chemical and petrochemical industry. Also have a strong back ground in communication field
DUTIES: Overseas experience in East Africa -Mozambique and various remote locations in Australia on OD&E Double ,Tripple and Work Rigs (Ideco H-725,Cardwell KB 700,Kremco K-600,Ideco 1200ED-SCR,National 610E-SCR,Franks Cabot 300) encompasing all standard and preventative mechanical maintenance on al
Over 16 years of experience working as a Process Engineer including 5 years as Lead Engineer supervising/coordinating engineering design teams in multidiscipline engineering companies. Has executed Conceptual Design, Front End Design and Detailed Design projects in Oil and Gas, Refineriese etc.
Materials Management, Logistics & Supply Chain Management, Stores & Inventory Control, Warehousing & Distribution, Coordinator.
Qualifications: BSC Electrical Engineering, Corporate member of the Institute of Electrical and Electronic Incorporate Engineers,
More than 20 years of professional experience in engineering design, construction and project management. Familiar with international standard including Saudi Aramco Engineering Stds. & design practice. Well verse in engineering software for electrical power system design analysis.
Industry and project experience in developing, analyzing, training and implementing simulation and advanced process control for refinery, chemical, and petrochemical operations.
Rig Manager/ Drilling Superintendent/ Drilling Supervisor.
17 years of experience in all phases of plant operations, production, trainning, environmental
A Senior / Chief Estimator level experienced in Oil & Gas, Mining, Power plants, Manufacturing. Representing Owner, EPC and EPCM companies, Over 25 Years.
Drilling Manager/Superintendent/Engineer with 14 years of international experience.
Project Management; General Management; Commercial Management; Project Director; Oil & Gas, Petrochemical; International; EPC/EPCM, Construction, Contracting, Joint Ventures; 30 years experience; Successful track record; Flexible and adaptable.
Operations Manager/Field Engineer - Borehole Seismic
Experience in project management, design, front end engineering, installation, testing and commissioning.
I offer demonstrated success in managing culinary and business operations activities at Defense Contracts, remote site and offshore locations in over eleven years of management for international catering companies.
I am an energetic, hardworking candidate. I am seeking an entry level opportunity.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   [ 28 ]   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com