Educational Qualification: Bachelor of Engineering (Mechanical)
University: Andhra -University, India.

Additional Professional Training / Qualifications:
1. AWS- Certified Welding Inspector
2. Training in Welding Technology As a welding Engineer at Bharat Heavy plates and vessels- Ltd, India
3. ASNT Level- II in Ultrasonic Testing, Radiographic Testing, RTFI (welds), Magnetic Particle Testing, Liquid Penetrant Testing.
4. Pass Safety school-In Intermediate course-In Singapore(Health&safety)
Computer Proficiency: MS office

PROFESSIONAL WORK EXPERIENCE: OVER- 19 years In
* Oil & Gas Cross Country Pipeline projects in Onshore, Offshore, structural fabrication.
* Piping of Refineries, Gas Compressor Plants, and Oil and Gas process plants & Bulk plants
* Power plant and fertilizers projects, ship building and ship repairs, fabrication of Pressure vessels, Boilers and Heat exchangers, columns, Reactors and Tanks, offshore platforms, jacket and decks, well head piping, remote headers

SUMMARY SKILLS
* Quality Control and welding inspection in Oil & Gas Projects involving Onshore, Offshore Pipelines and piping of platforms, Piping of Refineries, process plants. Fabrication of Pressure vessels, Boilers and Heat exchangers, columns, Reactors and Tanks, Off-shore platforms, jacket and decks, well head piping, remote headers, and Structural. Pre-commissioning of Piping and Pipelines.
* Monitor job quality plan and procedures, identification of special procedures and test, periodic review of welders perforamance,to monitor job procedures and agreed inspection and Test plan, compliance reports of defects and repairs and submission of quality records verification of test results and inspection(RT,UT,MPI,PT,RI)
* Conversant with various codes: API STD 1104, API 5L, ASME –sections II, V, VIII, IX, B31.3, B31.4, B31.8 and DNV OS-F101, AWS, BS,API-510&570
Welding Process familiar with:
* SMAW - Shielded Metal Arc Welding
* GTAW - Gas Tungsten Arc Welding
* FCAW - Flux Cored Arc Welding (Semi automatic and Automatic )
* GMAW - Gas Metal Arc Welding ( Semi automatic& Automatic welding-prowled -1)
* SAW - Submerged Arc Welding

Organization: M/S Mott MacDonald Co, LLC (Project management consultancy)
Duration: 25-08-2007 to still to date
Designation: welding superintend
Project: Aluminum smelter Gas, Gas filter, sperator, GSS to Pvaxx _to SSSRM,
Gas pipe line, launcher, and Receive station.

Organization: M/S Galfar (Almisnad) EPIC construction Company.
Duration: 25-04-2007 to 11-07-2007
Designation: QA/QC Welding Engineer
Project: Route Survey, Design, Construction, Installation&Hook-up Of Oil Flow –
Lines, Gas Lift lines &PWI Spur Lines in Dukhan Field.
Responsibilities:
1. Liaise with the Contractor representative for the conduct of day to day activities.
2. Prepare all procedures, PWPS, PQR, WPQT required for our project and submit approval for Clint.( Procedure and PQR Matrix attached)
3. Liaise with the head (Quality &T.S) for preparation & updating PQR.
4. After getting approval of PWPS carryout PQR. Followed by DT and NDT.
5. ALL PQR, WPS, WQT, DT must be witnessed by TPI and CA.
6. NDT Review and witness required by TPI monitoring by QP Representative.
7. Coordinate with Third party Inspector.
8. Monitor sub contractor's performance for compliance with quality requirements.
9. Raise NCR where warranted.
10. Prepare corrective and preventive actions for clients Non conformance.
11. Cooperate with Project manager to arrange Training for personnel.
12. Ensure and review of MTC as per project requirements, specification and client's specification.

Organization: M/S Acergy
Duration: 9th October 2006 to 28th Feb 2007.
Designation: Welding Engineer.
Project: Off-Shore –Sea Bed to surface Sabha Murphy Gas &Oil- Kikeh Gas
Singapore
Responsibilities:

* Liaise with the Contractor representative for the conduct of day to day activities.
* Prepare all procedures, PWPS, PQR, WPQT required for our project and submit approval for Clint.( Procedure and PQR Matrix attached)
* Liaise with the head (Discipline Manager) for preparation & updating Project Documents.
* After getting approval of PWPS carryout PQR. Followed by DT and NDT.
* ALL PQR, WPS, WQT, DT must be witnessed by TPI and CA.
* NDT Review and witness required by Clint Representative.
* Coordinate with Third party Inspector.
* Monitor sub contractor's performance for compliance with quality requirements.
* Raise NCR where warranted.
* Prepare corrective and preventive actions for clients Non conformance.
* Cooperate with Project manager to arrange Training for personnel.
* Ensure and review of MTC as per project requirements, specification and client's specification.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency

Organization: M/S PT.Petro Hans Tritunggal (Technical &Engineering Service)
Duration: 25th May to 30Th June 2006. (Indonesia)
Designation: Welding Engineer.
Project: UJUNG PANGKAH Field Development Off-Shore Well- Head plat –
Form Export pipe line Project
Responsibilities:
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, Electrode qualification tests
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrate Testing
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency
* Coordination of inspection activities. With reference to Project inspection requirements, review and acceptance of the following: Contractor Quality System requirements, Weld test Centers, RV Calibrators, NDT testing agencies, Construction procedures, Painting and coating procedures, hydro testing/ pneumatic test procedures / packages, and Quality related Procedures like NDT procedures, welding Procedure specifications, CVs of the Contractor QC/Painting Inspectors, welder and Coating/Painting applicators test records.
* Off-Shore Pipeline works-Automatic Welding Prowled 1(Mainline Welds)

Organization: Saudi Armco, Dammam, Saudi Arabia
Duration: 10th October 2005 TO 19th April 2006
Designation: Senior Project Inspector (Mechanical)
Responsibilities:
* Coordination of inspection activities. With reference to Project inspection requirements, review and acceptance of the following: Contractor Quality System requirements, Weld test Centers, RV Calibrators, NDT testing agencies, Construction procedures, Painting and coating procedures, hydro testing/ pneumatic test procedures / packages, and Quality related Procedures like NDT procedures, welding Procedure specifications, CVs of the Contractor QC/Painting Inspectors, welder and Coating/Painting applicators test records.
* Witness of inspection activities, related to materials, welding, painting / coating, hydrostatic testing/Pneumatic testing. Surveillance & regular Inspection results, concerns, pro-active notifications and violations if any, are recorded in electronic logbook. Follow up of Corrective actions and closing of E-logbook entries. Radiography film interpretation.
* Witness of Calibration of measuring and testing instruments.
* Witness of hydrostatic testing and Pneumatic testing of plant piping and pipelines.
* Attend the weekly Project Progress and QC Meetings with primary concern related to the look-ahead schedules and quality related matters.
* Walk through and Punch listing of completed section of the project, for acceptance from Project Inspection department.
Organization: Med Gulf Construction Company, Qatar
Project: Arab-D shut Down (Plant job) - Tie in works
For Qatar Gas Petroleum, Qatar
Duration: 23rd April 2005 till 20th May 2005
Designation: QA/QC Engineer
Responsibilities:
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, and Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.
* On stream& down stream inspection of plant Equipements&piping.
* Pre Commissioning of Piping.
Organization: Dodsal PT Ltd, Dubai
Project: 12" Ø and 32" Ø Pipeline project
For Sudan Petroleum and ONGC, Sudan
Duration: 22nd Oct 2004 till February 17th 2005.
Designation: QA/QC Engineer
Responsibilities:
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.
Organization: Consolidated Contractors Company (CCC), Saudi Arabia
Project: Qateef GOSP-2
For Saudi Aramco, Saudi Arabia
Duration: 22nd July 2003 till 16th May 2004
Designation: Senior QA/QC Inspector
Responsibilities:
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, and Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.
* Pre Commissioning of Piping.
* Preparation of quality control procedures, site work procedures, Method statements, and ITPs.

Organization: CAT Company, Saudi Arabia
Project: Khuff Gas and Well Heads and Trunk lines
For Saudi Aramco
Duration: 3rd Oct 2002 till 22nd Jan 2003
Designation: QA/QC Inspector (welding)
Responsibilities:
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.
* Pre Commissioning of Piping.
* Preparation of quality control procedures, site work procedures, Method statements, and ITPs.

Organization: Sri Ramakrishna Industries, Visakhapatnam, India
Project: Power Plants, Refineries, Fertilizers
Duration: June 2000 to September- 2002
Designation: QA/QC / Welding Engineer
Responsibilities
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.
* Monitor job quality plan and procedures, identification of special procedures and test, periodic review of welders perforamance,to monitor job procedures and agreed inspection and Test plan, compliance reports of defects and repairs and submission of quality records verification of test results and inspection(RT,UT,MPI,PT,RI).
* On stream& down stream inspection of plant Equipements&piping.
* Pre Commissioning of Piping.
.Vendor inspection, review of vendor Documents and Material inspection.
Organization: M/s Bharath Heavy Plates and vessels ltd, Visakhapatnam, India
Duration: Aug 1990 to Feb 2000
Designation: QA/QC/ Welding Engineer
Responsibilities
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, and Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.
* On stream& down stream inspection of plant Equipements&piping.
* Pre Commissioning of Piping.
* Monitor job quality plan and procedures, identification of special procedures and test, periodic review of welders perforamance,to monitor job procedures and agreed inspection and Test plan, compliance reports of defects and repairs and submission of quality records verification of test results and inspection(RT,UT,MPI,PT,RI).
* On stream& down stream inspection of plant Equipements&piping.
*. Vendor inspection, review of vendor Documents and Material inspection.
Organization: Bhageeradha Electrical Structural Pvt Ltd, Visakhapatnam, India
Project: IL-BH-22 Jackets, Deck Works, Offshore Platforms,
At Visakahpatnam, India
Duration: Oct 1987to July1990.
Designation: Welding /QAQC Supervisor
Responsibilities:
* Carrying out Welding Procedure Qualification Tests, Welder Qualification Tests, and Electrode qualification tests.
* Preparation of Welding Control plan, repair analysis, trouble shooting for weld repairs, weekly and Monthly Quality Reports and preparation of Final QC Dossier.
* Quality control supervision & NDT Inspections like visual, Radiographic Film Interpretation, UT, MPT, and Liquid Penetrant Testing.
* Monitoring Painting, joint Coating, and PP, PU coating. Review Inspection reports submitted by Painting Supervisor.
* Co- ordination with Client and Sub contractors. Planning of the QC activities and NDT scheduling and follow-up activities to ensure compliance with contract requirements while concentrating on efficiency.

PERSONAL DETAILS:
Designation: WELDING ENGINEER/ SR, QA/QC ENGINEER
Nationality: INDIAN
Date of Birth: 12.10.1962
Languages known: Conversant: English, Hindi, Telugu, &
Tamil
Written: English, Hindi, Telugu

View contact information...
«« previous resume next resume »»
Search Results (Resumes 351 to 400 of 9901)Go to Search Parameters...
Brief Description
Telecom Contractor ,english speaking ,Bell System Trained, college degree in Telecommunications ,20 years plus Outside Plant Technician and AVAYA ACS PBX's seeks contract/fulltime work in Middle East or almost anywhere in the world.
Having strong Process and Operations background, diversified knowledge and experience of Oil Industry for approx. 25 years in Process Engineering, Operation, Projects initiation, Coordination and commissioning, Product and Market Development, Pricing, Techno-Economic evaluation, Client / Customer
A highly competent Senior Electrical/Instrumentation Engineer who has developed supervisory capabilities; QA / QC inspection skills; installation maintenance expertise; pre-commissioning, testing and commissioning competence; safety awareness; organising and co-ordinating flair; fault-diagnosis
Project Management & Supervision, System Analysis, Design & Development Work, Device Wiring & Installation, Commissioning, Operation & Maintenance, Planning, Schedule & Decision Making
Had 27 years of work experience on Commissioning, Start-up and Operation of numerous Oil/Gas Production facilities, Petro-chemical, Chemical and Power Plants. Currently working as Operation Support/Pre-Start up Safety Coordinator in Oil/Gas/Sulphur Plant plus almost 7 years of Supervisory position
Experienced with trouble shooting all aspects ships electrical installation and automation, DP Experience
Managing Oil Field Operation and maintain high safety and low budget operation. FPSO Project Engineering.
An experienced and professionally qualified HSE Manager/Safety Engineer with proven leadership skills. Experience has been gained in both challenging and demanding working environments. Oil and Gas, Petro Chemical and the Nuclear/Power industries, also Engineering /Construction including Demolitio
More than 28 years of experience in oil industry
22+ years solid background of Piping Design in the petroleum contracting industry, covering all aspects of design activities
Summery Of work Experience:-
Versatile mechanical engineer within the oil and gas industry
painting and insulation supervisor - oil and gas industries
35+ years of multi-disiplined engineering practice, 24 years of direct supervisory experience, in power, petroleum & process industries
Senior Petroleum Engineer, 20 years experience in petroleum engineering. Areas of interest: Well test analysis. Production optimization & forecast. Productions operations Work over & completion design
Experienced Completing and Producing Petroleum Engineer
CV
An astute techno-commercial professional having 13+ years (of 15+ years) diversified experience in grid connected wind energy sector.
Free! Top-notch Instrumentation Technologist and Process control Team Leader of an US based MNC for the Central Engineering Division in Mumbai to meet the requirement of Asia Pacific and Europe who are pioneer in the manufacture of specialty chemicals with over 18 years of notable experience in the field
High level technical knowledge and understanding of execution methodology on engineering aspect. About 5 years in a QA/QC jobs engage in Power Plant Construction under the management of Japanese Firm. Had a background on Piping/Mechanical Designs using Autocad. Advance computer literacy.
As a well sit geologist for six years, including one year for Coal Bed Methane, familiar with StripLog, SDL_9000 geological logging software, strong organization ability
Electric Engineer with MSEE with more than 15 years of work experience in oil and energy industry, occupying positions in electric maintenance, utilities plants operation and project engineering management and construction,
Highly qualified, and experienced Fully conversant with all aspects of evaluation and testing of drilling mud. Expertise in testing of all the mud parameters
I am a postgraduate in civil engineering from the prestigious Indian Institute of Science, Bangalore. My major experience is in Oil industry. I have vast experience in Contracts Management in India & abroad.
Experienced for over 24 years in project & multi-disciplinary engineering management, planning, civil/ structural engineering, and computer software applications. Directly involved for more than 21 years in OIL & GAS offshore and onshore industry.
Control & instrumentation
A HIGHLY ADAPTABLE CIVIL WORKS AND CONSTRUCTION SUPERVISOR/INSPECTOR
I have accumulated thirty years experience in the oil & gas/heavy engineering/construction industry.
AWS- Certified Welding Inspector
Four year degree in Chemical Engineering from IIT, Roorkee and having 20 years of experinece mainly 17 years in Natural gas industry and five year in pipeline project development and three years in chemical industry. Working from last Sixteen years with Gas Authorityof India Limited under MoP&NG
20 Year experience in Oil & Gast Sector Project Management , Operation & Maintenence of Cross country petroleum/crude oil Pipeline
Degree in Mechanical Engineering & PG Dip. in Materials Management. Fully Conversant with the Materials and Maintenance modules of SAP system. Knowledge in materials standardization & cataloguing of upstream as well as downstream companies in Oil & Gas industries.
KEY COMPETENCIES
`
Extensive experience in commissioning, operation, maintenance and supervision of water treating, steam generation, power generation, and power distribution equipment and systems, and in the planning, design, and project development of electrical equipment in the power, oil and gas industries.
Expert knowledge in the integration of core and log data to help geologists, geophysicists and engineers be more productive.
I am having 21 years experience (10 years in supervisory cadre)in oil &Gas / Petro chemical / LPG Plant operation and maintenance . Experienced in the installation, maintenance and troubleshooting of a wide range of Power Generation and high voltage transmission equipment, distribution systems
Ram Babu Singh
I have 27 years in Petroleos de Venezuela (PDVSA) specializing in the area of Geodesic and Topography, developing activities related to several petroleum’s operational processes.
Design and Construction supervision experience in connection with Structural Steel Works and Steel Fabrication works using Code of Standard Practice of the American Institute of Steel Construction (AISC, ASTM), Mechanical Piping and Material Take-off required for Petrochemical Plant, Oil Refinery, P
Senior geophysicist, SMT and geographix work station expert,offshore data experience throughout world
I am a Chemistry post graduate having 17 years of laboratory experience from petrochemical and hydrocarbon industries.
Gradute chemical engineer
Oil / Gas / Petrochemical Project-Commissioning Manager. Registered Professional Chemical Engineer in UK / Europe.
A highly skilled Petroleum Engineer with over 20 years domestic and international experience in Petroleum Industry as a Petroleum Engineer, experience in reputed International Service Company
A Bachelor's degree holder in Chemical engg, have about 20+ years of Hydro carbon Industries experience both in Oil & Gas refineries and Oil production facilities. Having very good knowledge and trained in Fire fighting techniques and Plant safety equipments.
Industrial, B2B and Retail sales & marketing of ‘Fuels, Lubricants and other Petroleum Products’
Management Consultant / Project Manager / Business Process Analyst – task oriented, problem solver with successful experience in planning and implementing operational enhancements in support of critical business processes.
24 years of experience in Upstream And Downstream (Refinery) Oil & Gas Operations and Process Engineering out of which:
20 years experience. Executive with proven management, operations, P&L management, and business law experience. Communicator, negotiator, and capital raiser. Global, regional, and country specific business expertise.
First   1   2   3   4   5   6   7   [ 8 ]   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com