Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #64480
next resume »»
CONTACT INFORMATION:
View contact information...
Date of birth: 25-02-62
Member of the Institute of Incorporated Engineers
17 years experience of construction management employed on a variety of process and power generation projects, both in the U.K and overseas.
March 2007 to Present
Pireco Ltd.
British Gas Tunisia, Hannibal Sour gas project -Sfax –Tunisia
Construction Manager.
Responsible for the management of construction activities for multidiscipline team, undertaking the construction of the new sour gas plant extension, and de-bottlenecking of the existing British gas facility. The works included shut down tie-ins and new brown field production plant, civil, mechanical, piping and E&I works.
Approximately 1 million manhours to a value of circa $ 50 million
June 2006 to February 2007
TRACTEBEL GAS ENGINEERING Ltd.
Statoil Snøhvit LNG Plant - Hammerfest –Norway
Mechanica/Piping Field Engineer/DeputyConstruction Manager.
Responsible for the punching and acceptance of vendor supplied packaged equipment and Liason with vendors in order to rectify items identified during punches.
Carry out joint inspections with the client representatives to gain acceptance/handover of the completed units.
I was also responsible for the direction of sub contract labour in order to expedite the identified rectification works.
I was also required to answer sub contractor generated technical queries.
I was required to deputise for the construction manager during his leave and undertake all his functions.
Dec 2004 to May 2006
Fluor Ltd.
Ineos Chlor - Genesis Project – Runcorn, Cheshire, U.K.
Office/SeniorConstruction Engineer.
Responsible for the daily operation of the site document control department as well as undertaking mechanical field engineering activities, which includes, the overseeing of the installation of all mechanical equipment and liaison with vendors representatives during installation and rectification works.
I was also responsible for the response to mechanical technical queries and Co-ordination of responses to all other discipline queries.
Other duties included the liason with the client, to review punchlist items generated by the clients inspection team and address and resolve engineering issues raised by the same.
March 2003 to Dec 2004
ConocoPhillips Ltd.
Humber CRU Project - Conoco, Immingham, U.K.
Senior Field Engineer.
Seconded to ConocoPhillips from Fluor Ltd, in order to co-ordinate site engineering activities with detailed design being carried out in the Fluor Head office and to liase with the sub-contractors in order to overcome construction generated technical queries. I was also required to review potential sub-contractors during the bid evaluation and clarification stages prior to contract awards, from the engineering organisational standpoint.
The senior field engineer's role also required me to direct project specific activities within Conoco's own document control department to ensure the timely review and transmittal of sub-contractors deliverables.
I was also given the responsibilities for setting up the on plot office for Conoco's site supervision.
Nov 2001 to March 2003
Fluor Ltd.
Humber Rebuild Project - Conoco, Immingham, U.K.
Chief Field Engineer.
Responsible for the co-ordination between site engineering and related H.O engineering dept, in order to achieve the scheduled delivery of engineering documentation to sub-contractors. I was also responsible for the resolution of site generated technical queries, by utilising site based engineering personnel.
Document control and drawing transmittal were also a site-based functions, which came under the remit of the Field engineer.
I was also given the responsibilities of the General superintendent to construct an off-plots area of the project, which included tie-in work, whilst maintaining/carrying out my own 'normal' daily tasks.
Nov 2000 to May 2001
Foster Wheeler Ltd.
Dacion Project, Venezuela.
Senior Piping Field Engineer.
Responsible for all site piping engineering activities. Prior to my deployment to site, I was located at the piping sub-contractors workshop to oversee the spool fabrication and to solve engineering problems at source. I was required to liase at site with the sub-contractors engineering personnel and to co-ordinate piping installation with relevant supervisors.
Sept 1997 to June 2000
Fluor Daniel Ltd/ Mitsubishi Heavy Industries.
Slovnaft RHC Project, Bratislava.
Chief Field Engineer.
Responsible for all site engineering activities and liaison with home office engineering department, in order to resolve site generated engineering deficiencies. I was also responsible for the co-ordination of site inspection activities and production of the necessary documentation to gain local authority approval prior to the issue of the operations certificate. Part of my remit was to attend client/contractors weekly and monthly progress review meetings.
March 1997 to Sept 1997
Fluor Daniel Ltd.
Kodak RC2 project, Harrow, London
Piping Field Engineer.
Supervision of piping sub-contractor during installation and testing of carbon and stainless process pipe work, in accordance with Kodak specifications, Progress reporting and monitor of construction technical queries.
July 1996 to March 1997
Fluor Daniel Ltd.
Shell Refinery,Shell Haven,Essex,England
Piping Field Engineer/Deputy Construction Manager.
Supervision of both civil and mechanical sub-contractors during installation and pre-commissioning of 2.2 km Bitumen import line and associated unloading arms. During the final stages of the project, I was solely responsible for completion of project works and de-mobilisation of sub-contract personnel.
October 1995 to December 1995
Babcock King- Wilkinson Ltd.
ZTT Minerals Ltd, Caldwell, Texas, U.S.A
Construction - General Superintendent.
Co-ordination/scheduling of all construction activities, including shutdown works to allow tie-ins to existing facilities, on fast track second kiln project. Acceptance of completed works, which included witnessing of inspection and testing examinations..
February 1995 to September 1995
Babcock King- Wilkinson Ltd.
Aramco Haradh Gosp 1 Project, Saudi Arabia
Mechanical Field Engineer/Deputy Construction Manager.
Supervision of Mechanical sub-contractor during execution of installation works to install major process equipment, supporting structures and associated process pipe work.
I was also required to deputise for the construction manager during his absence from site, undertaking all his responsibilities, which included the reporting to Aramco Project management personnel of daily/weekly progress, and the scheduling of site based works.
March 1993 to January 1995
Babcock Contractors Ltd.
Combined Cycle Power Station,Lavrion,Greece
Project Engineer/Mechanical Field Engineer.
Compilation of inquiry package documentation and assessment of tenders prior to contract award.
Liaison with head office design department to solve site generated technical/engineering queries, visit local Greek fabricators to carry out audits and expedite work packages.
Supervision of installation of 62" G.R.P seawater cooling pipe work and associated pumps.
July 1989 to March 1993
Babcock Contractors Ltd.
Clyde Submarine Base,Faslane
Mechanical Field Engineer.
Co-ordination and supervision of mechanical sub-contractors, during installation and testing of low and high-pressure compressors and associated pipe work, HVAC ductwork and utilities.
Production and solution of site generated technical queries.
Attendance of project co-ordination meetings.
June 1988 to September 1988
Conoco UK Ltd.
Loggs Developement
Certification Engineer.
As the client's offshore representative, I was responsible for the checking and approval of Hook-Up and commissioning generated mechanical completion check lists and dossiers.
March 1987 to September 1987
Grootcon Ltd.
Phillips Compressor Project,Bacton Gas Terminal
Piping Field Engineer.
Punching process piping systems ranging from 0.5" to 36" diameter. Raising site generated technical queries and initiating field modifications. Updating piping isometrics to as-built status.
July 1986 to November 1986
Press Gt. Yarmouth Ltd.
South East Indefatigable Project,Bacton,Norfolk
QA/QC Engineer.
Overseeing the checking and compilation of mechanical completion dossiers for process pipe work and associated equipment, prior to submission to client for approval.
September, 1985 to June, 1986
Aker Stord A/S Norway.
Statoil Gullfaks 'A' Inshore Hook-Up
Piping Field Engineer.
Punching process and utility piping systems prior to hydro-test and Initiation of field modifications. Co-ordinating personnel during "Base line " checks of platform LP air system and tabulation of results.
Education
1987 to 1989
Lanchester/Coventry Polytechnic
Coventry,England
HND Mechanical Engineering
Organizations
Institute of Incorporated Engineers
London
Member
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 8701 to 8750 of 10926)
Go to Search Parameters...
Brief Description
Field jobs and experiences in Joint Investigation Visits (JIV), EIA, to both onshore and offshore locations.
PIPING PDS DESIGNER
Aviation expert with 21 years in the maintenace arena. Track record of increasing productivity, improving quality while reducing cost and meeting customer needs. Skilled in scheduling, supervising &evaluating over 50 personnel. Successful in developing & executing operational policies and procedures
Telecom Field Engineer :- Having experience in telecom planning, field survey, telecom construction, testing, and maintenance of Telecom field & quality assurance. Installtion & testing of telecom equipment & networks.
Experience of more than 11 years in the sector of Oil and Gas , Petrochemical , Ship Building, High Rise buildings and expertise on planning and scheduling with prima vera soft ware , keeping track of records with prima vera expedition , involved in tender level programming as well as master level
AutoCAD MEP 2009; Revit MEP 2008, Civil Survey CAD programs
Planning, project engineering/management of Petrochemical/Oil and Gas plants with around 28 years experience with design and engineering consultants, EPC contracting companies and oil producing companies. Associated with planning and control of projects with international companies like Shell etc.
In well services Egypt co (Sperry sun drilling services),I was working as Directional survey engineer(magnetic single shot and magnetic multi shot).
Professional in Quality and HSE
Thirty Eight years in Material Handling, Purchasing, Logistics, Expediting and Management with a record of Reliability and Progressive Advancement. I have handled the entire Purchasing Process for as many as twenty projects at any given time involving m
Heavy equipment operator
GIS, geomatics, ArcGIS, ESRI, Cartography, Map, Mapping, Geography
Commercial Manager with over 7 years experience in the UK & Internationally. Additional qualification (M.Sc) in Oil & Gas Engineering. Strong skills in organisation and leadership.; economic analysis, financial modelling and project management. Strong relationship management and sales skills
Crane specialist. Heavy duty mechanic, mobile crane operator, trade licences. Towercrane ticket, and presently apprenticing as milwright to further my skills. Operate and repair many makes models of hoisting equipment. Rigging, inspection, supervision skills + more 20yrs exp with industry leaders
Good sense of judgement and ability to interprete data and diagram, and very versatile with tools in engineering field.My decipline is Chemical Eng'g And I Upper credit honour in my first degree, With a one year Industrial attachment at (ubit Offshore Production Platform in Mobil Producing Nigeria).
Posses a Honours Degree in Mechanical and Offshore Enginnering. I am able to think creatve, willing to innovate and have excellent interpersonal and communication skills.
Registered Electrician with 20 years expirience trained in gas and electric arc welding, Basic First Aid, Lathe operation, Certificate in Computer Technology and two yearly Cardio Pulmonary Resusation and Saftey training for Electrical licence
B.S. Engineering quick learner and adapte soon
Completed bachular of engineering in idustrial and production engineering from v.t.u belgum, karnataka, india. skill: AutoCAD 2000, ideas, oracle 8.i
I regard myself as a broad minded person who has skillfull in teamwork and hard worker. I really interested to work in oil company cause my dreamed since I was child
Deep experience in dealing with computer,very good in english,excellent in arabic, qualified to work in any field of petroleum enginering(drilling, production and reservoir)
Graduate applied geologist 2:1 , glider piot instructor, highly skilled feild geologist.
B.TECH- Electrical & electronics engineer, Have undergone 4 weeks Industrial Training (I.E. 23-06-03 To20-07-03) At Dhakarani Hydro-Project (2 Weeks) & Dhalipur Hydro-Project (2 Weeks), Uttranchal Jal Vidhut Nigam Ltd., Dehradun, Uttranchal. For the partial fulfillment of the B.TECH, Designed a pr
B.Tech graduate holding university rank looking for job in mainframe
Software Skills: Unix, C, C++, MS office, windows etc.
Motivated versatile professional, with 12 years experience as company representative and Application Drilling Engineer Degree,, within the Major Oil Companies in ALGERIA (drilling division SONATRACH). Team player, with solid interpersonal communication skills and strong commitment to success.
Heavy duty auto eletrician, 18 years expat Caterpillar dealership experience,work includes pipelines and mines.
Electrical PDs Designer. Having knowledge of Microstation, Autocad And EERaceways.
Iam having five years exp in oil and gas field of hydro treater and Integreated offsite plant
Graduated Chemical Engineer trained in refinary and petroleum institute
QUALIFICATION: Completed B.Sc in Petroleum Engineering securing Grade A+ from University of Engineering and Technology Lahore, Pakistan. Presently studying in MSc.Petroleum Engineering at Norwegion Univrsity of Science and Technology SOFTWARES: Eclipse-100,Gl-View,etc.
Site investigation, Design of Foundation, Design of Embankment and Retaining Structures, Slopes Stability, Numerical Analysis, Constitutive Modelling, Contaminated Land Remediation, Ground Work Supervision, Mining Engineering, Total Station and Precise Level Surveying.
Power electrical engineer from Aleppo university
Process Engineer with 9 years' varied oil + gas experience (consultancy, operations support and design; both onshore and offshore) in London/ Aberdeen/ Perth, seeks interesting opportunities in Arabian Peninsula
14 years Experiences in welding inspection, quality assurance and quality control, NDT inspection and documentation with major middle east oil companies. Qualification: Diploma in Mechanical engg, CSWIP 3.2, BGAS Grade 2, NDT level 2 in 4 methods
Welding inspector with 4 years experience in welding QA/QC
Piping engineer currently working with Bechtel India Pvt Ltd. I am having a 2.6 year experience as piping engineer/ PDS administrator.
More than 10 years of Information Technology and Customer Services experience, Technical support across multiple industries, including Sales, Transportation, Oil Technologies and Services and Outsourcing Services. An intermediate level in English, effective in formulating and deploying alternative
Caterpiller Trained Heavy Diesel Fitter with open cut and underground Experiance on Caterpiller, Tamrock, Leiberherr equipment
Diversified: Nuclear Power Clearance /Mechanical/Electrical/Civil/Architectural/GIS Map/Water Design
31 yrs im field. I have ben an Electrical Field Engineer For a long time
I am a GRADUATE MECHANICAL & CERTIFIED COST ENGINEER possessing 20 years of diversified experience in Petrochemicals, Refining, Chemical, Fertilizer, Oil & Gas with various multinational companies in Pakistan, Bahrain & Saudi Arabia in the fields of Project control, Cost & Contract Management, Plant
I have worked as a Tour push onshore Venezuela and as a driller offshore Qatar. I am now working as a drilling consultant here in Canada.
Administration , Accounting and Human Resource experience
Construction manager/Chief field engineer with HND Mechancial engineering and Member Institute of Mechanical Engineers. 18 years of construction management experience at all levels.
Young Reservoir Engineer with 4+ years of experience. Areas of expertise include: PTA, reservoir simulation, waterflood management, sand management, naturally fractured reservoirs, calssical RE methods, etc.
Electrical Designer, Oil & Gas.
I am a Petroleum engineer/Geologist with determination to pursue and develop a professional career in a competitive and challenging environment
My key strength includes communication, interpersonal, analytical, creativity, troubleshooting skills and quick problem solving ability. CAD skills include AutoCad, SolidWorks, Catia V5
Broad-based experience covering a full spectrum of health safety and environmental services, including, Environment and Earth Resource management, and experience in administration and consulting. Knowledge of environmental tools: life cycle analysis, environmental impact assessment and HSE
First
Prev
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
[ 175 ]
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com