Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #64959 next resume »»
CONTACT INFORMATION:
View contact information...

PROFILE:

Have been employed by oil production companies for more than TWENTY TWO YEARS in both Egypt and Arabian Gulf region. The First ten years were spent with the General Petroleum Company GPC in Egypt, and the rest for Arabian Oil Company AOC, which converted afterward to Al-Khafji Joint Operations KJO (between Aramco Gulf Operations Company AGOC and Kuwait Gulf Oil Company KGOC) in the divided (ex-natural) zone between Saudi Arabia and Kuwait.

Throughout such career, experiences have been gained in the areas of project management of multi-disciplinary mega projects in oil and gas industry, covering all project management processes of project initiation, planning, execution, control and closeout.

-----------------------------

SKILLS:

* Professional project management from project inception to completion.
* Management of engineering studies including preliminary, front-end "FEED" & detailed designs.
* Management of feasibility studies and conceptual studies.
* Contract procurement and management (including tendering and implementation phases) of international contracts for industrial projects.
* General managerial and business skills as well as people skills.
* Particular technical experiences of in projects of the following fields:
o Oil & gas onshore & offshore fields o Process plants' facilities (oil & gas)
o Utilities plants' facilities (power / water)
o Offshore structures and facilities o Port and coastal structures and facilities o Other general onshore structures and facilities
* Familiar with most of the reputable international codes and standards as well as local codes.
* Working and dealing with many reputable international firms and entities in oil & gas industry.
* High professional computer and information technology skills.
* Fluent English language.

------------------------------------

CAREER HISTORY:

JAN, 2003 - PRESENT AL-KHAFJI JOINT OPERATIONS (AGOC & KGOC)
FEB, 2000 ¡V JAN, 2003 AL-KHAFJI JOINT OPERATIONS (AGOC & AOC)
JAN, 1995 ¡V FEB, 2000 ARABIAN OIL COMPANY, LIMITED (AOC)

AL-KHAFJI, SAUDI ARABIA

During TWELVE (12) YEARS of service, I have contributed in almost all onshore and offshore projects executed in the Company, both in-kingdom activities (Saudi Arabia) and out-of-kingdom activities in Kuwait, United Arab Emirates, Bahrain, Japan, UK, Australia, etc. Duties in several positions comprised the contribution in many objectives such as:

- Provide project management from project inception to completion for many construction and EPC projects as well as engineering studies and FEED projects.
- Provide technical management for the multi-disciplinary industrial projects.
- Provide project cost, schedule, scope, and risk management.
- Contribute in quality & HSE management.
- Develop project communication and information system management.
- Prepare project organization charts and provide team management.
- Develop contract procurement and implementation plans.

Amongst activities in Arabian Oil Company and Al-Khafji Joint Operations as Project Manager, the following projects were outstanding:

FEED for Construction of Control & Living Platform
(Jun, 2007 ¡V Oct, 2007)

The project consists of jacket and cellar deck (utilities), four levels module for living quarter facilities and control room and rack room for offshore control system (FEED by Worley Parsons, Australia).

FEED for Construction of Water Treatment Facilities Phase-3 & Khafji Ratawi Water Injection Facilities
(Jan, 2007 ¡V Jun, 2007)

The project consists of onshore facilities including surge tanks, induced gas flotations IGFs), nutshell filters (NSFs), buffer tanks, booster & injection pumps, and also offshore facilities including water hub platform (WHP), three water distribution platforms (WDP-1, WDP-2, WDP-3), submarine trunk and distribution pipelines (FBE internally coated), submarine flexible pipelines (FEED by Worley Parsons, Australia).

Construction of Khafji Field Development Plan, Offshore facilities (Phase 1), Khafji FDP-1
(Aug, 2006 ¡V Dec, 2006)

(Participated in this project as senior project engineer in the design review and FEED verification phase):
The project consists of the offshore facilities of the Khafji FDP-1 that indicated below (EPC by Consortium: ENPPI, Petrojet, PMS, Egypt).

FEED for Installation of Power Distribution Platforms, PDP-4&5
(May, 2006 ¡V Aug, 2006)

The project consists of two PDPs of four-legged jacket with two boatlandings, double-deck topsides, submarine cables and electrical equipments to support electrical submersible pumps ESP operation (FEED by Worley Parsons, Australia).

FEED for Khafji Field Development Plan (Phase 1), Khafji FDP-1
(Jan, 2006 ¡V Apr, 2006)

(Participated in this project as senior project engineer):
The project consists of both offshore and onshore facilities: Offshore facilities include new flow stations, submarine pipelines and cables, power distribution platforms, etc., and onshore facilities include inlet separators, gas handling and compressing facilities, control buildings and other plant facilities and utilities, etc (FEED by Toyo Engineering Corp., Japan).

Installation of integrated well jackets, IWJ-2 & 3
(Jun, 2003 ¡V Dec, 2004)

The project consists of two IWJs of four-legged jacket with two boatlandings, helideck and double-deck topsides to accommodate 12 well slots, drilling operation and piping & other production facilities (EPC by McDermott, UAE).

Assessment of existing aged platforms,
(Mar, 2003 ¡V Jun, 2003)

The project consists of assessment of the existing platforms using the provision given in Section 17 of API-RP-2A WSD (Engineering by MSL, UK)

FEED for IWJ-2&3
(Dec, 2002 ¡V Mar, 2003)

The project consists of two IWJs of four-legged jacket with two boatlandings, helideck and double-deck topsides to accommodate 12 well slots, drilling operation and piping & other production facilities (FEED by Toyo Engineering Corp., Japan).

Replacement of well jacket, TS-22
(May, 2001 ¡V Nov, 2002)

The project consists of replacing the damaged old well jacket, TS-22, slipping over the new jacket on freestanding conductors after removal of the damaged old jacket (EPC by NPCC, UAE).

Extension of north small pier, Khafji Port
(Nov, 2000 ¡V Apr, 2001)

The project consists of sheetpiling and piling for the jetty, earth work, and accessories (in-house engineering & Construction by The universal Co., Egypt)

Engineering for installation of gas lift station GLS-2,
(May, 2000 ¡V Nov, 2000)

(Participated in this project as senior project engineer):
The project consists of design of offshore gas lift station with all gas handling and compressing facilities. The design considered 8-legged jacket and 8000 ton topsides designed to be installed by float-over operation (Engineering by W.S. Atkins, UAE)

Construction of production master control Room PMCR,
(Apr, 1998 ¡V Apr, 2000)

(Participated in this project as senior project engineer):
The project consists of construction of a blast resistant building including control room, equipment room, HVAC room, and other facilities such as cable distribution network to plant facilities (EPC by Al-Khathlan Est., Saudi Arabia).

Construction of 1.5 MGPD seawater desalination plant
(Jun, 1997 ¡V Dec, 1999)

(Participated in this project as senior project engineer):
The project consists of construction of desalination units and facilities, seawater intake pit, head and facilities and FRP induction pipelines (EPC by Mitsui).

Renovation of north jetty, south jetty and causeway bridge
(Jun, 1995 ¡V Jun, 1997)

The project consists of major repair and maintenance works for the existing north jetty, south jetty and causeway bridge, including concrete repair jetty's accessories, and introducing cathodic protection for the concrete structures (Engineering by local engineering company and construction by Al-Dulaiman Est., Saudi Arabia).

Dredging of Khafji inner harbor and access channel,
(Feb, 1995 ¡V Jun, 1995)

The project consists of seabed dredging and sand disposal according to environment protection criteria (construction by Saudi Dredging Co., Saudi Arabia).

--------------------

MAR, 1985 ¡V JAN, 1995 GENERAL PETROLEUM COMPANY

RAS GHARIB, EGYPT

During TEN (10) YEARS of the service, I had contributed in almost all projects executed in the Company as a civil and project engineer. Duties in several positions comprised the contribution in many objectives such as:

- Provide project management during the engineering and construction phases including cost control, scheduling, and reporting.
- Participate in preparation of conceptual studies and preliminary designs.
- Administer department's affairs (Projects Department) including human resource management.
- Perform / review conceptual and preliminary designs as well as detailed engineering in accordance with local and international code & standards.
- Review and approve detailed engineering documents prepared by engineering companies & contractors.
- Supervise field construction.

Amongst activities in General Petroleum Company as project manager, project engineer and civil/structural engineer, the following projects were outstanding:

Construction of seawater desalination plant
(Feb, 1994 ¡V Jan, 1995)

(Participated in this project as senior project engineer):
The project consists of evaporators and other desalination facilities using power plant's turbines exhaust in addition to seawater intake facilities (construction by Petrojet with Posco Italian).

Construction of production facilities for North Amir oilfield
(Jan, 1992 ¡V Jan, 1994)

(Participated in this project as senior project engineer):
The project consists of two offshore platforms, pipelines and onshore gathering facilities (construction by Petrojet).

Construction of gas injection station in Ras Bakr
(Jan, 1993 ¡V Dec, 1993)

(Participated in this project as senior project engineer):
The project consists of pipeline, balance tank, compressor house, etc. (construction by local contractors).

Renovation of cooling tower in Ras Gharib gas plant
(Jun, 1992 ¡V Dec, 1992)

The project consists of replacement of components of the old water cooling towers (construction by local contractors).

Construction of 12 villas and recreational building in the Bakr Camp
(Jan, 1991 ¡V Jun, 1992)

The project consists of construction of 12 villas and mess hall and recreation facilities in bachelor camp (construction by local contractors).

Construction of pollution prevention center for EGPC in Ras Gharib
(Jul, 1989 ¡V Dec, 1990)

The project consists of construction of pollution prevention center for the EGPC in Ras Gharib. (construction by local contractors).

Restoration of Ras Gharib South Jetty
(Jan, 1988 ¡V Jun, 1989)

The project consists of construction of sheetpiling works and other facilities Ras Gharib Port (engineering by Hamza & Associates and construction by El-Sad El-Ali Co.).

Installation of oily and chemical drainage and sewage systems
(Jan, 1987 ¡V Dec, 1987)

The project consists of construction of pollution prevention center for the EGPC in Ras Gharib. (construction by local contractors).

Replacement of 30" loading line from Ras Gharib storage tank farm to Ras Gharib sea berth
(Jul, 1986 ¡V Dec, 1986)

Participated in this project as senior project engineer):
The project consists of pipeline, balance tank, compressor house, etc. (construction by Port Said Co.).

Other Miscellaneous Works
(Mar, 1985 ¡V Jun, 1986)

Miscellaneous including construction and maintenance of company's facilities such as steel structures, storage & process tanks, and buildings, houses, asphalt roads (construction by local contractors).

------------------------------------------

EDUCATION AND TRAINING:

B.Sc. in Civil Engineering, Alexandria University, Egypt (June 1983)
Member of Project Management Institute PMI (ID No. 381468)
Certified Project Management Professional (PMP) by PMI (Certification No. 79606)
Accredited MBTI„µ (Myers Briggs Type Indicator„µ) Practitioner

In addition, have attended a collection of courses, seminars, presentations and conferences of various technical and managerial subjects in Egypt, Saudi Arabia, Kuwait, UAE, Japan, UK and Australia.

----------------------------------

LANGUAGES AND COMPUTER SKILLS:

Arabic - Mother Tongue
English - Excellent (Spoken / Written / Reading)

An outstanding professional IT expertise & computer skills covering a wide variety of general and special-purpose software as well as networking and internet tools and applications.

PERSONAL INFORMATION:
Nationality: Egyptian
Year of Birth: 1960
Marital Status: married + 3 kids CONTACT INFORMATION:
Permanent Address: Alexandria, Egypt

View contact information...
«« previous resume next resume »»
Search Results (Resumes 101 to 150 of 9922)Go to Search Parameters...
Brief Description
A dynamic professional with over 2 decades (25 years) of rich experience in Project Machinery Planning & Execution, Erection & Commissioning, Maintenance, Quality Assurance, Process Enhancements and Man Management.
I am holding a Master degree in Chemistry. I have 19 yeras of experience in Oil and Gas Industry. I worked as Drilling Fluid Specilaist for 11 years in Offshore and 3 years in land rigs. 5 years I worked as Refinery Quality Control Department. I have working for Oil and Natural Gas Corporation Ltd,
Project Management, Project Controls
A B.Sc. Chemical Engineer with over 23 years of experience in oil&gas and Petrochemical Industry, I am specialist for different Petrochemical processes (Steam Reformer,H2/CO production-purification with Cold Box or PSA, Chlorine production and liquefaction…), commissioning and start-up. I am able to
22 years of experienced geophysicist/exploration specialist
Country Manager for Pakistan
ArcGIS 8.x/9.x, ArcGIS Server, ArcObjects, Virtual Earth, C#, VB.NET, ASP.NET, VB6
Positions - Project Manager, Project Control Manager, Planning Manager and Director in the area of process simulation, predictive control and risk. Hands on, onshore plants (oil, gas), aluminum, ammonium nitrate, offsite and utilities, offshore platforms and pipelines. Capex from $100M to $5Billion
I am a senior planning engineer with 19 years of experience in various infrastructure, Oil Rig Projects etc.
26 years maintenance electrician troubleshooting using plc and ladder logic. dc drives ac and dc motors and controlers
Industrial Engineering
Have been employed by oil production companies for more than TWENTY TWO YEARS. Have experiences in the areas of project management of multi-disciplinary mega projects in oil and gas industry, covering all project management processes of project initiation, planning, execution, control and closeout.
22 years of working experience in E& P Industries.Experience covers entire spectrum of Geophysics i.e. from Seismic Data Planning& Acquisition to Seismic Interpretation.
Geoscientist
Honor degree in Mechanical Engineering form UK and have gained more than twenty five years experience in the fields of major sub-sea assets management, assets integrity, offshore operations, projects and contracts management, inspection, maintenance and marine related projects.
Marine Pilot/ Mooring Master/ Loading Master
15 years of experience with visible/near-IR and hyperspectral imagery, and image exploitation (I have co-authored a book on hyperspectral remote sensing). I have a Ph.D. in Geology, an M.S. in Computer Science and I will have an M.S. in Applied Math in Spring 09.
With over 30 years in the Oil and Gas industry responsible for Health, Safety & Environment (HSE) and Loss Prevention (LP) activities on major offshore floating FPSO’s and fixed Installation projects. I can offer a broad range of safety experience from HSE/LP engineering to management.
On shore & Off shore Safety Execution – Off shore platform, Oil & Gas Refinery & LNG Gas Plants-shutdown/ Maintenance
25 years experience, experienced inj oil-gas field and reservoir development
To obtain an IT position that utilizes my experience as an IT Manager having responsibility for all aspects of IT including managing staff and departmental budgets with specialty in Oil and Gas industry.
Licensed Professional Engineer, performance oriented, with extensive broad-based experience in multidisciplinary projects. Particular expertise in Instrumentation and Control Systems Engineering for Chemical and Oil & Gas Industries. Supervision of complex detailed Engineering and Procurement.
Highly experienced senior manager in exploration, new ventures, reservoir management and optimization of exploration and production portfolios in conventional oil, gas, and heavy oil. CEO and president level recognition for exploration and reservoir management results.
I am a post graduate in physics(elecronics), having 25years experience in operation and in vibration field in fertilizer , power and desalination plants, conduction conduction monitoring systems, balancing , vibration analysis, predictive and preventive maintaince assesment in vibration field
Chemical Engineer with long experience in Refinery and Chemicals Process Modeling
Registered Professional Engineer (P.Eng) in the Province of Alberta.
Have more than thirteen years of experiance in log interpretation
Operations geologist
Instrument technician with 13 years experience
Over 30 years and broad range of experience in oil and gas exploration. Bachelor degree Geophysics/ Geology and MSc degree in Geophysics. Worked in most aspects of exploration, such as seismic survey planning, acquisition, data processing, interpretation, AVO, seismic attributesand seismic inversion
M. Sc. & B. Sc. in Computer Science, USA. Detailed knowledge and practical experiences in general maangement, performance management, Balanced Scorecard, and project Management. Having solid background in IT and business communication.
Highly Experienced Crane and Lifting Engineer
Marine Engineer, Chief Engineer Unlimited
qa qc inspection oil gas engineer coordinator welding painting ndt auditing equipment
Contract management Specialist
Accomplished PLC, HMI, automation, programmable controls specialist
A Production Engineer with over 25 years of oil and gas field experience in domestic and international operations. Solid record in building project teams in multidiscipline and multilingual work groups. Strengths include planning, organization, and communication.
A highly skilled Staff with over 20+ years of International and Domestic Experience in performing Oil and Gas Industries. I am fully conversant with Process Operations and Control procedures and presently working with Multi-cultural environment .Secure a challenging position where in my team player
I have a wide variety of experience in the field of heavy equipment management (maintenance, operations & repairs) in construction, petrochemicals, transportation, logistics and other related field.
Senior drilling fluids engineer looking to progress career with a position as a night drilling supervisor. Over 27 years experience offshore.
Free! Dynamic and accomplished Operations and Technical Development Leader with 20+ years of demonstrated achievements in devising effective operational improvements. Driven professional known for setting comprehensive organizational strategic direction and vision.
Electrical Engineer with more than 20 years of experience with PLC and HMI projects: Design, implementation and commissioning. I've worked in projectos for Food and beverage,
DRILLING ENGINEER
Biofuel / biodiesel technologist ( oil & fat technology)
Exploration, Operations, Management, Biostratigraphy, Sequence stratigraphy, Sedimentology, Basin Analysis, Clastic, Carbonate, Seismic, Geochemical, Geophysical
I am having 19 years of multidisciplinary experience in oil & gas industry and competency in multiple modes of delivery (onshore, offshore, jack-ups/floaters-drill ships). Past 5 years I am working for Shell in Oman, Brunei and Sarawak (Malaysia) as Drilling Supervisor.
Oil and Gas Operations Mnagement
20 years experience in drilling operations
Experience in DCS, PLC, applied to Process Industries and Power Plants. Exp/ with logic diagrams, erection and commissioning,P&ID, MCC, specifications, studies and cost estimation.
25 years of experience; more recently as Principal/Lead Engineer. 5 years in middle/senior management. Most contributions are in design, engineering & commissioning of pumps, compressors and turbines. Oil & Gas experience includes Refinery and Upstream, Marine, Pipeline pumping & compression stn.
First   1   2   [ 3 ]   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com