APERCU: A competent professional with nearly 17 years of qualitative & rich experience in Utility Management, Utility Plant Operations, Maintenance Operations and Project Execution. Presently working with Philips Carbon Black Limited as Assistant Manager. Heading the Utility department which includes Gas fired Boiler, Demineralised water treatment plant, Reverse Osmosis Plant, Cooling Towers and Air cooled condenser. A keen communicator with the ability to relate to people across all hierarchical levels in the organisation. Posses strong organisational skills as well as excellent problem resolution abilities.

CAREER SCAN

Philips Carbon Black Limited Assistant Manager since Aug¡¦04

Key Responsibilities:

Utility Plant Operations
„Ã Supervising the operation and maintenance of 65TPH/75 BAR Pressure WHRSG Boiler (Gas/Oil fired) through DCS which is supplying high quality steam to 12 MW steam Turbine.
„Ã Handling the installation and operations of Boilers, Generators, and Auxiliary Equipment etc. in Utility department.
„Ã Supervising the Operation and maintenance of RO/DM Plant & MEE
„Ã Monitoring and maintaining the all water parameters within specified limit and take necessary step to ensure the production of high quality steam.
„Ã Implementing Operational Budgets, Work Instructions and Standard Operating Procedures.

Maintenance Management
„Ã Implementing plans & schedules for Maintenance Operations and Annual Turn Around with focus on optimum utilisation of manpower and material.
„Ã Managing the functions of troubleshooting and preventive / breakdown maintenance of boilers, turbines, generators, auxiliary equipment etc. so as to reduce downtime to minimum.

Project Execution
„Ã Supervising site execution activities involving erection & commissioning of machines, equipment and utilities on the Shop floor.
„Ã Monitoring activities of personnel towards ensuring adherence to safety norms.
„Ã Deploying review systems to ensure execution of projects on time and as per budgeted parameters.

Significant Highlights:
„Ã Played a key role in the installation, erection & commissioning of the following machines and equipment:
„Ã 12MW Plant which comprises 60TPH Gas fired Boiler (TSPL MAKE), 12 MW Bleed cum condensing Steam Turbine (TRIVENI MAKE), Air cooled Condenser and RO/DM Plant.
„Ã Boiler cold start-up done by using CBFS instead of LDO thereby saving substantial amount to the company.

Continental Carbon India Ltd Executive Utility department Apr¡¦91-Aug¡¦04

Joined as Officer in April¡¦91 and later promoted to Executive Utility department in April¡¦98

Key Responsibilities

Utility Plant Operations
„Ã Supervising the operation and maintenance of 35TPH/45 bar pressure WHRSG (Gas/Oil fired) boiler through DCS which is supplying high quality steam to 4.4 MW Steam Turbine.
„Ã Handling the installation and operations of Boilers, Generators, and Auxiliary Equipment etc. in utility plants.
„Ã Supervising the operation and maintenance of RO/DM Plant, ETP Plant and Cooling Towers.
„Ã Monitoring and maintaining all water parameters within specified limit and taking necessary step to ensure the production of high quality steam.
„Ã Implementing Operational Budgets, Work Instructions and Standard Operating Procedures.

Maintenance Management
„Ã Implementing plans & schedules for Maintenance Operations and Annual Turn Arounds with focus on optimum utilisation of manpower and material.
„Ã Managing the functions of troubleshooting and preventive / breakdown maintenance of boilers, turbines, generators, auxiliary equipment etc. so as to reduce downtime to minimum.

Significant Highlights:
„Ã Played a key role in the installation, erection & commissioning of the following machines and equipment:
„Ã 4.4MW Power Plant which includes 35TPH Gas fired Boiler, 4.4MW steam condensing Turbine,
„Ã DM Plant and ETP Plant.
„Ã Increasing the OBR of DM Plant by modification and by changing the regeneration procedure of DM Plant.
„Ã Modifying and revamping Boiler including replacement of Stem drum and super heater area for capacity enhancement within a record period of time (45 days project was completed within a time period of 26 days)

ACHIEVEMENTS
„Ã Worked as a team leader for the successful certification of CDM (Phillips Carbon Black Ltd is the first carbon black industry in the world that got this certification.)
„Ã Achieving highest Plant service factor i.e. 97.44%
„Ã Increasing the efficiency of DM Plant by trying innovative methods for cost saving.
„Ã Worked on the energy conservation in the Power Plant.
„Ã Reducing the down time of the plant by implementing various preventive maintenance techniques.
„Ã Successfully implementation of SAP/ERP system within the stipulated time.
„Ã Modification of Power plant within a record period of time thereby reducing substantial financial loss to company.
„Ã Worked as a lead auditor for the implementation of ISO certification of the Plant.
„Ã Implementation of SAP/ERP system of Phillips Carbon Black Limited Power Plant,
„Ã Making budgetary requirement and commendably run the plant within the budget allocation.
„Ã Preparation of Business Score Card and successfully achieved the goals set by the management.
„Ã Indigenously designed and installed DM Plant of 20M3 capacity at Continental Carbon India Ltd there by saving substantial amount for project execution.

COMPUTER SKILLS
„Ã Good working knowledge of MS Office, MS Word, MS Excel, Front page 2000 & MS Power point
„Ã Efficient in Internet Surfing, advanced Internet Applications.
„Ã Sound knowledge of SAP-ERP R3 and BASE ERP System

ACADEMIA
1988 Bachelor of Science from Calicut University, Kerala
1995 Diploma in Mechanical Engineering from IME, Mumbai
1998 1st Class Boiler Competency Certificate

PERSONAL DOSSIER
Date of Birth: 30th May 1968
Martial Status: Married
Visa Details: Yet to be awarded a visa
Driving License: Four wheeler Indian driving license
Linguistic Abilities: Hindi, English and Malayalam

View contact information...
«« previous resume next resume »»
Search Results (Resumes 701 to 750 of 10018)Go to Search Parameters...
Brief Description
I have a total of 13 years of experience working as an Engineer in the Petroleum Industry. For the last 10 years I have been working as a Process Engineer handling all aspects from Conceptual Engineering through to the Detailed Engineering Phase. I am seeking work as a Senior Process Engineer.
Involved in commissioning and pre-commissioning activities.
I am having 14 years of experience in Instrumentation design, construction and commissioning activities in the field of refineries, fertilizer units and Oil & Gas. From last three and half years I am working in Nigeria for major oil & gas giants like SHELL, TOTAL, AGIP and EXXON MOBIL for their upst
Having 15 years Experience in Instrumentation and Control in Oil & Gas, Refineries (FCCU, CDU units), NGL Plant, Gas plant,LNG plant and Petrochemical Plants, Pox Unit, Process gas compressors, Gas Turbine generator (GTG) Units. Work Exposure of Performing safety critical, Operatability critical pr
- Self reliant, reliable self starter, Wide knowledge of control and process instrumentation, Experience in risk and hazardous operations analysis, Good team worker
Seeking middle level management post having 17 years of experience in the field of utilites(HP Boiler(Gas/Oil fired),RO/DM PLANT,COOLING TOWERS,AIR COOLED CONDENSER AND MULTIPLE EVAPORATOR
16 years of experience as a highly organized Executive in Oil & Gas Based Infrastructure / Construction and Electricity Management Companies; effective at multitasking and working under pressure to accomplish overall objectives.
20 Years of consolidated experience in classroom and on the Job Training and discipline specific Competence Assurance Assessment in the Oil and Gas Industry. EPC&C and maintenance activities in Petrochemical, Refinery, LNG, LPG, Power generation plant, Cement plant, Desalination plant, Revamping and
Presently Marine & HSE Supt on board FPSO ABO for 2 years. Total 4 Years FPSO Experience . 15 years on Tankers
20 years working on oil refinery as a tank farm panel operator.
To secure a long/short-term contract, or permanent position. In Construction, Maintenance, Commissioning etc. My current position is as an Electrical/Instrument Engineer (as to the above position I am negotiable).
Over 30 years of experience in I&E Construction for oil & gas and petrochem. industries includes onshore and offshore. Of this, 25 yrs in Supervisory and project management.
Fourteen years of combined experience in petroleum engineering and G&G (U.S. & international.) Experience includes integrated 3D reservoir modeling, numerical simulation, reserves assessment, field development, and reservoir studies.
I have experience in procurement management, asset management systems, advanced supplier relationships, major supply agreements, ISO quality, procedure development, business development, sales and marketing. My reputation is based on integrity, proven supply strategies, measurable deliverables and
Piping Designer. Petro-chem & Power background; design in 2D and 3D environments.
Overall Exp. 14+ years.
Positive, self-motivated and results-driven, a proactive and confident professional with extensive expertise gained in an environment where accuracy and attention to detail are vital. Capable of utilising resources, both human and material, to streamline workflow and achieve time-sensitive deadline
An experienced Training & Development Manager used to setting up training projects for classroom, workshop and competency based models within the O&G inductries.
Condition monitoring engineer, rotating machinery engineer, mechanical engineer, maintenanace engineer
Reservoir Engineer with proven record of accomplishments. Extensive experience in pressure analysis, property evaluation, reserves determination, operations, and computer modelling with a skill for enhancing company value. Proven ability to find additional reserves where others have already looked.
Suitable to work in process/operation area as technician (field & panel op) supintendent, etc.
Seismic field processing on Promax for 10 years and actually short experience on CGG software
Over 23 years experience in engineering and project management in Oil & Gas, refining, and petrochemical environment. Extensive knowledge in particular aspects of project engineering, mechanical and maintenance engineering. Key engineering competences include procurement of major capital equipment.
O&G prospect/areal HC content assessment by a hand-picked series of near-surface, geochem-related, composited anomalies very indicative of commercial deposits.
Over twenty-five years of work experience in the Oil, Gas and Petro - Chemical Industry,
Over 24 years global experience in reservoir development and management of oil and gas condensate fields.
Snr Project Engineer with Lead Process Engr / Manager and multidiscipline experience over 20 years in major international oil / gas & petrochem projects with leading Engineering and Operators in Europe ,US, Africa (Nigeria) and Mid East.
Geoscientist with over 20 years experience with major oil companies in Europe and South America in exploration, production and business development projects.
Petroleum Engineer with over 30 years of experince in oil and gas fields operation and maintnanace, including design and construction of surface facilites(Pipeline)
QA/QC ENGINEER
An experience individual with excellent knowledge of Sales/Marketing, Freight handling, Imports/ Exports Management with the objective of achieving organizational goals and making it a strong profit center seeks an opportunity in managerial capacity
I offer a broad range of upstream petroleum business skills and leadership experience covering exploration/development planning and LNG project execution, subsurface and production facilities planning, economic analysis, strategic planning, commercial/legal negotiations and corporate communications.
Senior Project Manager, International Industrial Multi-Disciplinary &Muli-Cultural Projects
Negotiations, planning, economics in international joint venture gas and midstream projects for past 14+ years. Started career as reservoir engineer with Exxon.
Trade and degree qualified welding engineer and m,etallurgist with 25+ years experience in petrochem, power, onshore rig contruction and computerised welding documentation management.
I was responsible for maintenance, operation, and repair of all vessel electrical and mechanical systems
. I have sixteen years refinery experience for four location – Texaco Port Arthur, Basis petroleum Krotz Springs - Louisiana, Basis petroleum Houston – Texas and Basis petroleum Texas City refinery. Basis petroleum has been acquired by Valero in 1997.
Analytical chemist in the fields of oil & gas, petrochemical, fertilizers, pesticides and pharmaceuticals.
Supervise small and mid-sized projects involving maintenance/rehabilitation/repair of pipelines and piping systems, good experience at piping equipment selection and sizing, experience with pigging facilities design, experience at pipeline pigging, fluent in English, French and Arabic
•Worked as commissioning Engineer and Project Liaison Manager in four major Petrochemicals (Polymer) projects, worth $30 Million, $50 Million, $20 Millions and again $20 Millions.
I am an AWS-Certified Welding Inspector and a Philippine licensed Mechanical Engineer with 15 years experience in Welding/Piping/Structural/Tanks inspection.
INSTRUMENTATION ENGINEER
I&C ENGINEER. ENGINEERING, CONSTRUCTION, MAINTENANCE, TROUBLESHOOTING
Technical / Lead Safety Engineer
NDT inspector LVL II
M.E in Instrumentation Engineering with 16 years Oil & Gas Project design, Detailed Enginerring, Construction & Commissioning .
Senior Instrument engineer with more than 13 years experiences in Oil, Gas, petrochemical and off-shore fields
A qualified engineer with over 16 years of experience in production
EPC Attorney with Land Development and Regulatory Experience
Free! Lead/Senior Piping Designer
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   [ 15 ]   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com