CONTACT INFORMATION:
View contact information...
SUMMARY OF QUALIFICATIONS:
------------
* 8 years of experience in reservoir and production engineering.
* Special skills in Reservoir simulation for Black oil and Compositional
* Experienced in SCAL modelling, Interpretation and Simulation for Advance recovery process
* Experienced in Petroleum Engineering (Operation, Completion, Work over and Stimulation)
* Experienced in Reservoir Management & Development (Plan of Development, Reservoir Management, Tertiary project development, Field Appraisal)
* Extensive exposure to complex light crude oil in sandstone and carbonate environment
* Quantifiable track records of accomplishment of leading many projects including EOR field trial, improve field development and production over 19000 bbl/day
* Strong leadership, Confident mentor and project leader
* Highly motivated, outcome focused, creative problem solver and extremely proactive to improve petroleum engineering skills
* Great ability to work in teamwork and behave strong organization capability
------------
OBJECTIVE:
------------
challenging career in petroleum industry
------------
WORK EXPERIENCE:
------------
NTNU Project WORK HISTORY
MSc Candidate
August 2006 ¡V JUNE 2008
* Doing Three Phase WAG Reservoir Simulation (Eclipse Compositional)
* Develop ODD3P Three Phase model WAG Simulation study
* Run sensitivity analysis compare to Stone model
* Doing Reservoir Simulation of Statfjord field project using Eclipse 100
* Perform Fault interpretation (Seiswork), Updating i1-Statfjord simulation model, improve the history matching & Production forecast
* Run drainage strategy scenario and run economic.
* Evaluation of Miscible flood simulation (Eclipse Compositional)
* Develop simulation model for gas/solvent & WAG injection to volatile oil reservoir
* Compare black oil four component miscible flood simulation and fully compositional simulation.
* Develop WAG injection scenarios, perform history match and prediction.
* Doing Reservoir Simulation Projects using Eclipse 100
* Updating Gullfaks field simulation model and perform history matching
* Run production forecast and identify opportunity for infill wells (vertical/horizontal producer or injector)
* Simulation of Coning Three Phase Study
* Doing Fracture Reservoir Simulation Project using Eclipse 100
* Build core simulation model for fracture network model
* Develop EOR mechanism scenarios and perform sensitivity analysis
* Doing Simulation Project using SENSOR Simulator (Skarv Field Development)
* Build Skarv Field simulation model and improve the history matching
* Develop drainage scenario, forecasting and economic evaluation
WORK HISTORY
2007 ¡V Present
RESERVOIR LABORATORY AS, NORWAY
SIMULATION ENGINEER
* Prepare lab data, build simulation model and simulation design for SCAL EOR (Water flood, WAG, SWAG, and Tracer) Flood Experiment and Centrifuge.
* Perform simulation history matches and reservoir engineering calculation and analysis (Material balance, Fractional flow, Gamma Insitu Saturation and etc..)
* Perform relative permeability and capillary pressure fine tuning and validation.
* Manage project and write the report to the customer.
2004 ¡V 2007
CHEVRON PACIFIC INDONESIA, INDONESIA
PETROLEUM ENGINEER
* Petroleum Engineer for 300 oil producers and 100 water injectors in Area 2 Minas Water flooding field.
* Keep and Maintain oil production above 15000 BOPD (achievement 17000 BOPD) by deliver work over recommendation either producer or injector which is discussed in Pattern Review Meeting.
* Lead the project execution of new wells. Role involved well path planning, reserve estimation, production forecast, and economic evaluation, controlling capital expenditure to meet 10% over/under and preparing look back evaluation.
* Conduct Reservoir surveillance, such as reservoir pressure monitoring by running pressure gauge in injector routinely, monitoring injection profiles as planning by pattern using spinner logging monthly, Analyze the result using Saphire/Pansys.
* Generate Depletion Plan for Area 2 Minas field. Role involved: Field Plan of Development, By focus area strategic plan and by well strategic plan
* Estimate reserves yearly and oil production forecast for annually planning. Especially, for new infill project and EOR project proposal
* Lead the project in cross functional team (Res, Prod, Geologist, Geophysics, and Equip.eng) to initiate Area 2 Pattern Waterflood development project. Role involved: review Area 2 formation by static & dynamic data, run simulation forecast and run economic)
* Lead multidiscipline team for pattern review meeting and reservoir management optimization team in Minas Area 2 field. Resulting impact in cash flow: 9 MM USD/Year
* Initiate for improving Database Integration of Minas Field for reservoir monitoring. Indirect impact to increase oil production 24 M barrel oil/Year.
* Involved in cross functional team (Res, Prod, Geologist, Geophysics, Equip.eng) to initiate X sand development project. Role involved: review reservoir data & develop POD.
* Involved in cross functional team (Res, Prod, Geologist, Geophysics, Equip.eng) to initiate Cased Hole Formation Resistivity (CHFR) project. Role Involved: review unswept area, select well candidates, job supervision and result evaluation.
* Involved in cross functional team on Strategic Water Alignment Management Project (SWAMP) in Area 2. Role Involved: Review potential area, review potential un align well, well and reservoir candidacy, prepare recompletion (water shut off program), estimate incremental, job scheduling and execution, economic evaluation, evaluate result to impact production. (increment production was 2000 bbl/day)(getting President award)
* Leader in cross functional team (Res, Prod, Geologist, Facilities eng, HSE) to initiate Minas Groundwater monitoring well project. Role involved: review water table, topographic survey, dug well analysis, log analysis, environmental analysis, planning & scheduling.
* Involved in cross functional team (Res, Prod, Geologist, Geophysics, Equip.eng) to initiate Infill well development. Role Involved: review unswept area, well candidate and proposals.
* Involved in cross functional team to initiate Convert to Injection (well conversion) project. Role involved: Review uneconomic well, select well location, cost estimation.
* Involved in multidisciplinary team (HES, Public Affair, Technical, and operation team for Water Disposal Well project. Role involved: Job executions (Deepening drilling and cementing). Resulting impact in cost saving for water treatment (getting Chevron Quality Class Award)
* Lead several reservoirs engineering study related to material balance, reservoir pressure update, formation damage, fine migration, injectivity and cementing improvement.
2003 ¡V 2004
CHEVRON PACIFIC INDONESIA, INDONESIA
PRODUCTION ENGINEER
* Maintained and improved oil production in South Area Minas Field (600 Oil Producer & 300 Injector), Role involved identifying work potential candidates (Completion and Workover), stimulation job (hydraulic fracturing, acidizing)
* Design and Supervise Well Completion and Well Intervention job (200 Recompletion job, 50 Cementing job and 40 stimulation job) and lead the rig operation for special job.
* Well Maintenance job (cementing, change pump size, repair well head section), artificial lift (monitor and optimize submersible pump efficiency). This impact to cash flow (NPV): 22.2 MM USD/Year.
* Lead several production engineering study related to production optimization using surveyor ESP, sand production study, DIFA ESP study and cementing improvement
* Involved in cross functional team (Res, Prod, Facility Eng., Equip.eng) to initiate surface facility optimization (Role involved: review tank and pipeline capacity, forecast fluid production, pump resizing, and reservoir deliverability review, cost estimation)
* Leader in cross functional team (Well Service, Operation, SerCo) to initiate Minas Waterflood Multizone Completion strategy Project. Role involved: Project development, tender process, implementation & project evaluation. (getting Chevron Quality Award)
* Leader in cross functional team (Well Servic, Operation, SerCo) to initiate Individual Zone test using used tool project. Role involved: Project development, fabrication, field trial implementation and project evaluation, etc. (getting Chevron Quality Award)
* Leader in cross functional team (Facility Eng. Welltest Specialist, IT Eng, Instrument Eng. HSE Eng.) to initiate Minas Hydrocyclone Welltest project (installing separator in mobile welltest device) and Minas Realtime welltest. Role involved: Review P&ID, Select separator, tender process, implementation & evaluation. (getting Chevron Quality Award)
* Involved in multidisciplinary team (Procurement, Facility Eng., Production Eng. Technical, and operation team) for inventory reduction project. Role involve: supply strategy, tender process, inspection and monitoring. (Getting Chevron Commendable Award).
* Prepare, design, and purchase lifting equipment material (packer, tubing, wellhead, pump, switchboard, transformer and downhole accessories). Including contract preparation, tender process, and material inspection.
2001 ¡V 2003
CHEVRON PACIFIC INDONESIA, INDONESIA
RESERVOIR ENGINEER
* Involved in cross functional team (Re, Prod, Geologist, Geophysics, Equip.eng) to initiate Infill well development. Role Involved: review potential unswept area, well candidacy, reserve review, run simulation, run economic, cost estimation, and purchase equipment.
* Involved in cross functional team (Res, Prod, Facility eng., Geologist, Geophysics, Equip.eng) on Minas Light Oil Steam Flood (LOSF EOR) Project. Role involved: review well data, welltest data, steam distribution and steam conformance.
* Involved in cross functional team (Res.eng, Prod.eng, Geologist, Chem Eng., Geophysics, Equip.eng) on Minas Surfactant Field Trial (SFT EOR) Project.
* Involved in cross functional team (Res, Prod, Geologist, Geophysics, Equip.eng) on Minas Areal Sweep Improvement (ASI EOR) Project. Role involved: review unswept area, well candidacy, development plan, and reserve calculation, economic and cost estimation.
* Involved in cross functional team (Res, Prod, Geologist, Geophysics, Equip.eng) on Minas Reservoir Pressure Reduction Project. Role involved: review pressure data, select formation capability, well recompletion, economic run, and cost estimation.
* Lead cross functional team (Six Sigma Specialist, operation, well service, SerCo) to evaluate Vibroseismic (EOR) Project. Role involved: review well data, review performance before and after vibration, conduct statistical test analysis (Six Sigma Analysis), production forecast, operation scheduling, prepare report and presentation.
2000 ¡V 2001
CONOCO INDONESIA INC., INDONESIA
PETROLEUM ENGINEER
* Involve in gas contract preparation and operation design. Role Involved: Prepare gas sales contract, review P&ID, and run pipeline simulation.
* Involve in cross functional team (Facility Eng, Processing Eng. IT Comm, Prod eng) on Field Data Capture Project. Role Involved: provide input well data to drilling software data and check data quality input for querying and analysis.
2000
INSTITUTE FOR RESEARCH ITB, INDONESIA
RESERVOIR ENGINEER
* Involve in CO2 injection study for Libo South Field (Caltex Pacific Indonesia). Role Involved: review reservoir data, calculate gas reserve and production forecast.
* Involve in cross functional team (Prod eng., Res eng., Geologist, Geophysics) to re-evaluate field development of Tempino field project.
------------
EDUCATION & CERTIFICATION:
------------
2007 Msc Petroleum Engineering, NTNU, Trondheim, Norway
Reservoir Eng. & Simulation Specialization. Graduated will be in June 2008
2000 Bsc (Cum Laude) Petroleum Engineering, ITB, Bandung, Indonesia
TECHNICAL
2006 Applied Pressure Transient Analysis, Rumbai
2005 Capital Planning Development and Execution Process, Rumbai
2005 Capital Stewardship Operation, Rumbai
2005 Applied Reservoir Engineering, Rumbai
2004 Artificial lift technology, Rumbai
2004 Production Operation, Duri
2004 Well Stimulation and fracturing, Rumbai
2003 Well testing Analysis, Rumbai
2003 ChevronTexaco Project development & Execution process, Rumbai
2003 Workover and Completion, Rumbai
2002 Waterflood Management School, Rumbai
2002 Reservoir Characterization and Geostatistical modeling, Duri
2002 3D Streamline simulation, Duri
2001 Coring and Core Analysis, Duri
2001 Caltex Financial and Procurement system, Rumbai
INDUSTRY REQUIRED
2005 Field Safety Work Procedure, Rumbai
2004 Fire fighting Course and Demonstration, Minas
2003 Basic Healts Safety and Environment, Rumbai
2000 Offshore Survival Training, Natuna Sea
SOFTWARE TRAINING
2006 Reservoir Simulation, ECLIPSE, Trondheim
2006 Reservoir Simulation, SENSOR, Trondheim
2006 Pressure transient Analysis, SAPHIRE, Rumbai
2005 DSS advance course, Rumbai
2005 Material Balance, MBAL, Rumbai
2004 Geological Interpretation ¡V GOCAD, Duri
2004 Geological Logging Interpretation ¡V GEOLOG, Minas
2004 Landmark Openwork ¡V Duri
2003 Reservoir simulation ¡V FrontSim, Duri
2003 Reservoir simulation ¡V CHEARS, Duri
2002 Merak PEEP and DTree, Rumbai
2000 Landmark Drilling & Completion, DIMS, Jakarta
2000 Reservoir Simulation, CMG, Bandung
------------
ADDITIONAL INFORMATION:
------------
MEMBERSHIPS
��ƒnSecretary of Indonesian Petroleum Association, Riau Chapter
��ƒnMember of the Society of Petroleum Engineers (SPE)
��ƒnLecturer, Riau university, Petroleum engineering Dept.
o Interest: Reservoir engineering and geothermal engineering subjects
Personal Biodata
Date & Place of Birth 26 February 1978 ¡V Cirebon, Indonesia
Citizenship Indonesian
Marital status Married, 1 child
------------
View contact information... |