CONTACT INFORMATION:
View contact information...
CARRIER SUMMARY
About Ten years experience with engineering of Oil and Gas project (Process Platform & Well head Platform), Electrical Substation, HV/MV/LV apparatus switchgears/ MCC, MV/ LV Motors, power supply unit, UPS control equipments, Electrical on Mechanical Package (Gas Compressor, Fire Water, Gas Turbine Generator, Service Water, Emergency Diesel, etc) and devices (RTU, transducers, metering, transmitter etc), Programmable Logic Controller, interactive Human Machine Interface, and energy control system, building infrastructure, and tendering system.
Having experience on Project Management to carry on management task to execute project of Electrical & Telecomm, Instrumentation and Control System (PLC, DCS etc).
QUALIFICATION
Able to conduct electrical engineering cycle, since FEED, detail engineering up to commissioning.
Familiar with all electrical drawings and format, standard ANSI, IEC.
Able to create principle logic diagram of Electrical System.
Able to organize engineering project on electrical, instrument, telecomm etc.
Capable to solve electrical problem, establish calculation note for stability study, selectivity study, specification, establish schematic diagram from basic logic diagram, ladder logic diagram for PLC.
Familiar with RS Logic 5000
Familiar with HV/MV/LV Switchboard, MCC (Motor Control Centre)
Familiar with PLC System: ALSPA C80/35, Allen Bradley SLC500 & HMI system.
Familiar with project management task i.e. Schedule or planning, budgeting, financial analysis, reporting, technical analysis, covers management, engineering, procurement & construction work.
FORMAL EDUCATION
ƒá Electrical Engineering ¡V ITS Surabaya
Thesis:
Heuristic Technique for Loss Reduction Using Shunt Capacitor Applied to Distribution System with Varying Load Condition. With excellent value (A)
EXPERIENCES:
Dec 06 ¡V present: Electrical Engineer- ConocoPhillips; Natuna Sea, North Belut Project;
* Follow up FEED and Technical Bid Evaluation,
* Engineering detail of electrical & distribution (Solar Generator, 6kV Switchgear, 480V LV system, UPS, Transformer, EDG, Navigation. Aid, Motors, etc).
* Particular task on ECS (Electrical Control System), verify specification, verify architectural design and interface with Automation system or other package, review vendor offer, and review detail design by vendor.
* Calculation review on Load Flow, Short Circuit, Motor Starting, Stability, Selectivity & Protection setting, Cable Sizing & Selection etc.
* Electrical on Mechanical Package(Gas Compressor, Fire Water, Gas Turbine Generator, Service Water, Emergency Diesel, etc)
* Technical Bid Evaluation, and Technical Clarification during procurement,
* Vendor document review and approval.
* Acceptance Test, Functional Test & Integration Test (inprog)
* Construction & Commissioning (inprog).
Jan 2004 ¡V Dec 2006: Project Manager, Cegelec ¡V Balikpapan
Oily Water Treatment plant ¡V Electrical, Instrument and Control System works.
To carry on management task relating to planning, engineering, procurement & construction works. Electrical scope to have EPC of MCC, UPS, Lighting, etc. Instrumentation to have EPC of SDV (shutdown valve), Control Valve, Transmitter, Flame Detector, Safety Valve, PLC of Safety Shutdown System, PLC of Process Control System, Update database & graphic display of DCS Honeywell.
Scope to include FAT of MCC, PCS and commissioning assistant to Company.
May 2002 ¡V Jan 2004: project engineer, Cegelec- Balikpapan
1. Balikpapan Office ¡V TOTAL, for electrical & instrumentation supply EPC (Engineering, Procurement and construction included test & commissioning) for UPS, Transformer 20kV/0.4V, Cerberus Fire Alarm System, Telecom Patch Panel & data server (voice & data), Lighting, Grounding and Lightning System and HVAC (Heating Ventilation Air Conditioning).
2. PCK4-CONS2 project ¡V TOTAL, for electrical & instrumentation to supply EPC (Engineering, Procurement and construction included test & commissioning) for UPS, Transformer 20kV/0.4V, Cerberus Fire Alarm System, Telecom Patch Panel & Data server (voice & data), Lighting, Grounding and Lightning System and HVAC (Heating Ventilation Air Conditioning).
3. Various Tendering ¡V Electrical, Navigation Aids, Field Instrument, Fire & Gas System, Generator, Transformer, PLC system (SIL 1- 3 range), HVAC, etc.
4. Tunu 9 ¡V TOTALFINAELF, to supply Switchgear/MCC and update of Electrical Control System.
5. MRT (Mass Rapid Transport) circle line 3 phase A/C ¡V Land Transport Authority ( Cegelec Pte Ltd, in Singapore), bid proposal.
March 2001 ¡V May 2002: TUNU Phase 8 Project, TOTAL FINAELF
As Electrical and Control Engineer of PT INDOKOMAS ¡V ALSTOM Contracting Company:
Responsible:
ć Design EPDCS (Electrical Power Distribution Control System) (I/O List, Logic Diagram, Input Output Mapping, System Data Exchange)
ć ALSPA P8-75 PLC Configuration. (in France)
ć MAN MACHINE INTERFACE P1200 Programming (in France)
ć Factory Acceptance Test for electrical part; HV/LV Switchboards, UPS-Distribution Boards, Distribution Control System.
ć Commissioning Test for electrical part
ć Electrical Calculation for Cable Sizing, CT/PT selection, Study on Load Flow, Short Circuit, Motor Starting, Stability, Selectivity & Protection setting.
March 1999 ¡V March 2001: TUNU Phase 7 Project, TOTAL INDONESIE
As Electrical and Control Engineer Of PT INDOKOMAS ¡V ALSTOM Contracting Company:
Responsible:
Period March 1999 ¡V August 2000:
ć Design EPDCS (Electrical Power Distribution Control System) (I/O List, Logic Diagram, Input Output Mapping, System Data Exchange, Trouble Shooting Loop Diagram)
ć Design Operating Control and Protection (Synchronizing System, Interlocking and Inter tripping System, Neutral Earthing Management, Coordination Study)
ć Design of HV/LV Switchboard, MCC (Motor Control Center), and the Troubles Shooting Loop Diagram.
ć Design Revamping on existing platform for EPDCS System (site survey, Solar system Generator, Electrical System Operation).
ć Electrical Calculation for Cable Sizing, CT/PT selection, Study on Load Flow, Short Circuit, Motor Starting, Stability, Selectivity & Protection setting.
Period August 2000 ¡V December 2000: as site engineer, TAMBORA EAST KALIMANTAN
ć Coordinate engineering support to integrate electrical system (HV 5.5 kV system, LV0.48 kV, MCC, SOLAR GENERATOR System, SEPAM 2000 protection, PECA measuring, Emerg. Diesel Generator, UPS, DIST. BOARD UPS, EPDCS (Electrical Power Distribution Control System)
ć Clarification and problem solver on technical problem during adaptation work to integrate the system.
ć Assist for commissioning on electrical part including EPDCS.
Period January 2001 ¡V March 2001: As Engineering Representative at BALIKPAPAN office
ć Coordinate the final documentation of TUNU7 Project (Electrical, Control System, Instrumentation)
January 1998 ¡V March 1999
As SCADA Engineer for Extension West Java Project (EWJS), PT INDOKOMAS -CEGELEC
Responsible:
ć Design Remote Terminal Unit (RTUS900) and Supervisory Interface Cubicle (SIC)
ć Design System Communication RTU S900
ć Design Local Terminal Unit (LTU) and mimic board display for Cawang PLN area 1 and Cigereleng PLN area 2.
ć Design System Concentrator SCADA
ć Redesign 4 Remote Terminal Units (RTU) for Borang Extension Project.
May 1997 ¡V January 1998: PT Cheil Jedang Indonesia (Korean Company)
As Electrical and Instrument Supervisor.
Responsible:
ć Supervise erection work of the factory
ć Commissioning on Electrical and Instrumentation system
ć To Maintain all measuring and monitoring system well running
View contact information... |