CONTACT INFORMATION:
View contact information...
D.O.B.: 1st November 1957.
Nationality: Indian
Religion: Hindu
Marital status: Married.
Qualification:
Higher Secondary Examination
( Physics, Chemistry, Mathematics ).
W.B.S.E., India. [ 1976 ].
DIPLOMA ( 4 years ) in Mechanical Engineering.
( Specialization: Inspection & Quality Control ).
from State Council of West Bengal, Govt. of India. [ 1977- 1981 ].
Industrial Training / Certificate: Govt. Of India Apprenticeship ( India,1981-1983 ).
Welding Joint Inspection training ( Saudi Aramco, K.S.A. -2002 ).
ASNT, Level- II Certificate in Radiography Testing (India -2005 ).
QC Management training ( Japan - 2006 ).
BACHELOR Degree in Business & Administration
(Major: Quality Management ), from Belford University, U.S.A.
( A distance study course.).
Industrial Experience: More than 26 Years.
Key word: Construction Supervision.
Work category:
* Project Management
* Engineering
* Procurement
* Construction Supervision
* Commissioning
* Quality Control
* Inspection
Field of Work:
Oil & Gas Field / LNG / Petrochemical Plant / Fertilizer Plant / Power plant / Paper Plant / Cross Country Pipe Line / Ammonia Pipe Line / HVAC System / Fire Fighting System / DM-Plant / Ceramic Plant / Rubber Industry / Paint Industry / Water Treatment Plant / Desalination Plant / Effluent Treatment Plant / Material Handling Plant.
Nature of work:
Construction Supervision / QA / QC / Inspection / Document verification / Document Control / Project Monitoring for Fabrication, Erection, Pre-Commissioning of AG & UG Piping, Pipe Line, Rotary / Static Equipment / Tank / Pressure Vessel.
Developing strategies for material / product inspection according to the international codes and standards. Administrating third party inspection / stamping of material / product worldwide. Monitoring the quality performance of Vendors/Sub contractors/ Suppliers.
Strength Area:
Pipe Line / Piping Construction Work.
Installation & pre-commissioning of Pipe Line / Piping Work: -
Plant piping, Yard piping, Cross Country Pipe Line.
Conversant with various International Codes / Specs: ASTM, ASME, AWS, API, AWWA, DIN, BS, IS, JIS, SAES, SAMSS, FEED, NFPA etc. Review of GA, Layout, P&ID,3D drawing, documents for WPS, PQR, PWHT, Weld Map, NDE Procedure, Hydrostatic Test, ITP. Const. supervision, witness, inspection of fabrication / erection for Loop- Support- Vent, Drain, Valves, / Control Valve ( Pr. Reducing ) Station-Fit up-Welding-NDT-SR-Hydro Test-Coating-Insulation-Cathodic protection - Pre-commissioning.
Brief of experiences:
Total exp into oil and gas field: 15 years.
Total offshore experience: 1 year.
Total onshore experience: More than 15 years.
Total EPC experience: More than 16 years
Total exp as Lead: More than 5 years.
Total exp in refinery projects (overseas): 4 Years.
Total exp in LNG projects: 4 Years.
Total designing exp: 2 Years.
Overall Industrial project experience: More than 26 years.
Employers:
(Present employer).
Technip – Abu Dhabi, U.A.E. ( A France based MNC ).
Designation: Lead Piping Construction Engineer (QA/QC), since May2007.
Project field: An EPCC Project for LNG ( Oil & Gas Industry ).
Work location: Balhaf site, Yemen LNG Project, Yemen.
Nature of work:
Coordinating, direct field supervising and carrying out all the stage Inspection activities according to the approved QAP/ ITP / Method Statement / Project specification, within the Fabrication Shop / Plant (Site) / and for the offshore piping. Ensuring quality standards are being maintained. Additionally, managing the inspection requirements of client representatives for a Large capacity LNG Project in Yemen.
Scope of work:
Construction supervision, QA, QC and Inspection work for LNG-piping / piping for other Cryogenic services and piping for utility services, other associated piping including underground piping and pipe line(GRP & Coated pipe) construction.
* Review of GA, Layout, P & ID,3D(Isometric) drawing,
* Review of Documents for WPS, PQR, PWHT, Weld Map, NDE Procedure, Hydrostatic Test, ITP.
Construction supervision and Inspection of fabrication / erection for
Loop- Support- Vent, Drain, Orifice flange, Valves, / Control Valve ( Pr. Reducing ) Station.
* Witness/Inspection of Fit up-dimensional checking.
* Witness of Welding visual Inspection.
* Review of NDT, PWHT-report/documents.
* Witness of Hydro Test.
* Witness of Coating-Insulation-Cathodic protection.
* Performing pre-commissioning activity.
Final documentation:
Verification of Third Party Inspection reports, Closing the NCR, Punch list, Verification of CTQ, Site deviation documents, As Built drawings, Verification of final dossier of fabricated pipe spools, line history chart, spare parts statements, Instrumentation and pre-commissioning status. Final handover the piping system as per service wise to the client / end user.
Previous Experience(in detail):
Dodsal Pte Ltd.,U.A.E.
Designation: Sr. QC Engineer ( Pipe Line ).
Project field: Oil & Gas Industry.
Duration of Work: Jan'07 to April'07.
Work location: Qatar Petroleum, Ras Lafan, Qatar.
Nature of work:
Coordinating and supervising all the stage inspection activities for the fabrication, manufacturing Quality, providing a proactive quality assurance / control and technical consulting services and expertise in the area of Quality Coordination to the Engineering Procurement and Construction (EPC) division. Ensuring Implementation, verification & assessment of the Procurement Surveillance Plan within the quality standards.
Managing the inspection requirements of client representatives.
JGC Corporation, Yokohama, Japan
Designation: QC Coordinator(Piping/Mechanical).
Project field: Hawiyah LNG project ( Oil & Gas Industry - A Saudi Aramco project ).
Duration of Work: Jan'06 to Dec.'06.
Nature of job:
Step-I
Filing of all documents of importance pertinent to the contract - Expediting of materials, equipment and documents required from the supplier, such as drawings, schedules, bills of materials, performance bonds, waivers of lien, wiring diagrams, etc. - Maintaining an accurate log on the history of the negotiations between the supplier and expediter in relation to the contract progress and updates on as frequent a basis as necessary to insure on-time delivery - Arranging and coordinating the requested inspections as required prior to the actual release of the shipment - Keeping the Project Buyer, Project Manager and Director of Procurement and any and all parties as required updated as to the status of the contract or requesting assistance whenever necessary to insure on-time delivery - Coordinating shipments through the Traffic Department - Continuous surveillance and monitoring of all contracts to insure the timely execution of all documents and goods as specified within the contract - Representing the Procurement Department in all project meetings and keeping the Procurement Director informed on any key events/milestones on a regular basis - performing pre-Inspection Meeting, Inspection Notification for product at vendor's workshop, Inspection Report verification, handling of NCR & Punch list, Settlement of construction concession / deviation etc. Visit supplier fabrication shops as required to perform regular or spot expediting until fabricated material are shipped - Maintain highest ethical and professional standards as established by the Corporation - Goods Quality inspection.
Step-II
Review of Mechanical Equipment dwg./Structural dwg./ Piping GA dwg. / Lay out dwg./ 3D drawings / documents, QA/QC document, As built drawing, ITP, Inspection Report, NDE Report, IRC, NCR, Project summery. Issuance of Inspection Notification, Preparation of Two Week Look Ahead Schedule, Conducting weekly meeting, Pre-Inspection Meeting, Project co-ordination & expediting.
Hyundai Heavy Industries Co., Korea.
* Position held: Mechanical Engineer- Piping QC.
* Posting: Ras Tanura Refinery ( A Saudi Aramco project), Kingdom of Saudi Arabia.
* Project field: ( Oil & Gas Industry )
* Duration of Work: Jan'05 to Dec.'05.
Nature of job:
Review of Mechanical Equipment / Structural / Piping GA / Lay out / 3D drawings, As built drawing, QA/QC document. Construction / Installation Supervision /QC & Field Inspection for entire plant piping including HRSG,ACHE, CGTG ( GE-U.S.A. make, 152 MW capacity)unit. Review of WPS/PQR, Inspection & Quality Control for Heavy Fabrication activity, preparation of Three months look ahead schedule, progress monitoring, General correspondence with Third party/Client, Technical document control, Inspection & Quality Control for Mechanical Work, Project expediting.
Det Norske Veritas (DNV), Hovik, Norway.
* Position held: Inspection Engineer.
* Posting - Kolkata, India Region.
* Duration of Work: Jan.'03 to Dec.'04.
* Project field: ( Oil & Gas Industry )
Nature of job:
Review of WPS/PQR/ITP/NDE documents. Construction Inspection / Stamping / Review of Material Test Certificates/ Witness of various Testing for Piping, Pipe line fittings, spool & material for Major Industrial Plants/ Oil & Gas sector/ Power Plants / Chemical Plants.
The Kuljian Corporation, ( A division of DC Group) Philadelphia, U.S.A.
* Position held: Mechanical Inspector.
* Posting – SWCC ( A Saudi Aramco project), Kingdom of Saudi Arabia.
* Project field: Power & Desalination Plant.
* Duration of Work: Jan'02 to Dec.' 02.
Nature of job:
Review of GA drawing, QA,QC documents, WPS, PQR. Witness of WQT / Welding Joint Inspection, Interpretation of NDE, witness of Hydrostatic Test, Visual, dimensional check. Construction Supervision & project monitoring, Project Expediting for Entire Plant Piping.
Development Consultants Pvt. Ltd.( DC Group - An Indo-American collaborated Engineering & Consultancy Firm, pioneer in Oil & Gas / Power sector – since 1930 ), Calcutta, India,
* Position held: Lead Construction Engineer( Piping / Pipe Line / Mechanical ).
* Posting – All over India.
* Duration of Work: April1983 to December 2001 ( 18 years + ).
Nature of job:
Construction Supervision, Inspection, micro level project monitoring & design activity for entire plant piping / yard piping & equipment piping for LNG / NG / Naphtha Pipe line, Ammonia Pipe Line / pipe line for Cryogenic services, High pr. Steam line etc.
Erection / Installation of HRSG, Steam Turbine, Gas Turbine, HVAC system, Cooling Tower, Fire Fighting system. Review of NDT report, As built drawing. Pre-commissioning activity of pipe line for CCPP.
Erection & Pre-Commissioning of Desalination Plant. Inspection and certification of pump / Horton Sphere / Floating Roof Storage Tank / Heat Exchanger / Pressure Vessels etc for Oil and Gas, Refinery, Petrochemical, Fertilizer Industries.
Career Objective
Q. Why Employer will be interested to select me?
A. I am having very much powerful skill in my trade like,
Document use,
Writing,
Oral communication,
Problem solving,
Decision making,
Critical thinking,
Job task planning and organizing,
Finding information,
Inspect to ensure that safe working conditions are maintained,
Computer use etc. which I gathered from my last 26 yrs. service experience.
Keeping an attitude for continuous self calibration.
View contact information... |