CONTACT INFORMATION:
View contact information...
SUMMARY OF QUALIFICATIONS
* Excellent PDMS and PDS with 8+ years working as a designer in oil/chemical/power plant layout and piping o PDMS – Able to take charge in Design(equipment, piping, HVAC, structure, cable tray) /ISO-draft /Draft /Admin Modules o PDS – Expertise in Equipment /EDEN Programming /Design Review /SmartPlant Review, skilled in Piping /E Raceway
* Be familiar with AutoCAD and MicroStation for drawing optimization
* Knowledge of European and North American engineering codes & practices gained through offshore oil experience
* Knowledge of Quality Control standards in design
* Self-motivated, dedicated, responsible and accountable
* Good interpersonal, communication and problem solving skills
* Able to exercise good judgment and consistently meet deadlines
* MS Office skills as well as Windows Domain Network Administrator skills
ACHEVEMENTS, AWARDS & PROFESSIONAL PUBLISHINGS
* "Outlook of PDMS Application in Digital Power Plant FGD Treatment" (Published in "Heat Power Technics" magazine, 2007 1st Edition, ISSN 9999-2354)
* "Engineering Application of Intergraph PDS 3D Design Software" (Published in "21st Century Electric Power" magazine, 2006 4th Edition)
* "PDS Equipment Parametric Automation Software" (Published in "Heat Power Technics" magazine, 2005 1st Edition, ISSN 9999-2354)
* Certified Engineer of Electronic Power Plant Design (Ministry of Energy, China, 2005)
* National Engineering QC Team Annual Award in Software Development to Automate Parameter Creation of Power Plant 3D Equipment Model (National Survey & Design Association, China, 2002)
* Electric Power Survey & Design Industry QC Team Annual Award (Electric Power Survey & Design Association, China, 2002)
* Engineering QC Team Award in Power Plant 3D Design (Provincial Survey & Survey Association, 2002 & 2003 for two consecutive years)
* Provincial Software Development Award for Intergraph PDS 3D Normalization Database (2001)
* Second Prize of China National Power Engineering Design Excellence Program (1999)
EMPLOYMENT HISTORY
Desulphurization Engineering Branch Co. of CSEPDI June 2004 – Dec. 2007
Heat Power Technical Designer, PDMS/PDS Advisor
* Engaged in application rollout of utilizing PDMS to enhance 3D design methods in FGD(Flue Gas Desulphurization) in electric power plant
* Acted as an instructor and advisor for the company in PDMS Design, Draft lay-out and ISO-Draft
* Pioneered customizing PDMS Piping and Draft-Admin Databases for China's FGD Design Standard
* Produced and updated piping, equipment, HVAC, structure and civil, cable tray modeling, and, checked collisions and provided solutions
Special Projects: Co-operation with China Offshore Oil Engineering Co., Ltd. Mar. 2002 – Dec. 2003
Designer, Technical Adviser for PDS Designer
* Supervised in PDS Equipment and HVAC modeling
* Followed P&ID, designed several piping volumes and related process systems
* Maintained server and workstation as a backup assistant for PDS project manager
* Programmed and compiled in PDS EDEN Language to customize interactive applications for various types of equipment
* Trained technicians to upgrade their technical skills by using PDS on a regular basis for China Offshore Oil Co., Ltd.
* Cooperated with an EPC - Kerr McGee (an American energy EPC corporation in the exploration and production of oil and gas resources) in a couple of projects
CSEPDI (Central Southern China Electric Power Design Institute) July 1999 – June 2004
Engineer, Designer
* Collected, analyzed, input, checked, revised PDS 202-sheet data according to Chinese Standard Power Plant Piping Codes for PDS Chinese Standard Database Customization
* Designed piping volumes
* Applied Intergraph PDS Software and Bentley MicroStation to design the following Power Plants:
1. Huang-Shi Electric Power Plant (2x300MW capacity, 1999-2000);
2. Shan-Dong Electric Power Plant(4x300MW capacity, 2000-2001);
3. Wuhan Yangluo Extension Power Plant Phase II (2x300MW capacity, 2001-2002);
4. Jiangxi Fengcheng Extension Power Plant Phase I (2x660MW capacity, 2002-2003);
5. Jingmen Extension Power Plant Phase II (2x600MW capacity, 2003-2004);
6. Wuhan Yangluo Extension Power Plant Phase III (2x600MW capacity, 2004).
* Collaborated with other departments to solve collisions in 3D models, share experience and standardize practice
* Delivered training programs to new employees in 3Dimension concepts, advanced CAD software application, professional ethics, team morale
* Took charge in PDS equipment modeling, site collision check, recording collisions both in MS Office file and image file, reporting collisions real-time to Supervisor and Project Manager, in-site 3D model review application and creating. AVI poster files for plant owners
* Presented key PDS projects to visitors of CSEPDI
EDUCATION & PROFESSIONAL DEVELOPMENT
Accredited PDMS Training Program by AVEVA (Developer of PDMS) 2004
Bachelor of Science Degree in Computer Science Application in Automation Engineering
Hubei Institute of Technology, Wuhan, China 1999
Huazhong Science of Technology University, Wuhan, China 1999
REFERENCES AVAILABLE UPON REQUEST
View contact information... |