CONTACT INFORMATION:
View contact information...
I am herewith enclosing my detailed resume for your kind perusal. I request your good self to give me an opportunity to serve in your esteemed organization.
I acquired 15 years of experience in India and overseas in Commissioning, Start up, Operation and Maintenance of different Power generating plants including Frame 6B, 9E, 9FA series GE Gas turbines, GE Steam turbines, BHEL Steam Turbines, BHEL Coal Fired boilers, Heat Recovery Steam Generators and Power Station Auxiliary systems.
I am Presently working as a Commissioning Incharge (GTG) for commissioning, Operation and Maintenance of 750 MW, Tuanku Jaafar Power Station, Phase-2, Combined Cycle Gas Power Plant, Port Dickson, Malaysia.
I passed B.Tech (Electrical and Electronics Engineering) from reputed Jawaharlal Nehru Technological University in 1993 With Distinction (86.33%). I also completed M.B.A(Human Resources and Management) from Dr. B.R. Ambedkar Open University.
Total Experience: 15 Years
Nature of Job: Commissioning, Operation and Maintenance of Combined Combined Cycle Gas Power Plants and Thermal Power Stations.
Personal Details:
3. Date of Birth: 18TH MARCH 1970
4. Educational: B.Tech ( E.E.E ),
Qualification M.B.A.
5. Marital Status: Married
8. Nationality: Indian
9. Passport Number: G2146456
Summary
* Innovative and motivated Electrical and Electronics Engineer with 15 years lead experience in Commissioning, Operations of Combined Cycle Gas Power Plants and Thermal Power Plants and Maintenance of Combined Cycle Gas Power Plants and Thermal Power Plants Control & Instrumentation and Electrical Systems.
* Presently working in Sub-Consortium of Toshiba/GE for Commissioning (GTG (C&I)) and Operation & Maintenance of 750 MW Combine Cycle Gas Power Plant of Tenaga Nasional Berhad, Malaysia at Port Dickson.
* About 10 years experience in Operations of 272 MW, Combined Cycle Gas Power Plant and Maintenance of Control & Instrumentation and Electrical Systems of 272 MW Combined Cycle Gas Power Plant of A.P. Gas Power Corporation Ltd.
* About 4 years experience in Operations of 210 MW Thermal Power Unit and Maintenance of Control & Instrumentation Systems of 210 MW Thermal Power Unit at 1260MW, Vijayawada Thermal Power Station of Andhra Pradesh Power Generation Corporation Ltd.
* Instrumental in the tender committee formed by Andhra Pradesh Power Generation Corporation (APGENCO) to quote for operation and maintenance contract of 272 MW, AP Gas Power Corporation, GTPS, Vijjeswaram and succeeded in getting the O&M contract by competing the international bidders.
* Involved in the verification and finalization of APGENCO's proposed 2100MW (3X700 MW) CCPP, NEDUNOOR, KARIMNAGAR District, Andhra Pradesh, India, draft proposal documents prepared by Tata Consultant Engineering Ltd.
* Planned and prepared Bar charts and schedules of works to suit the Commissioning works and Operation & Maintenance of Power Train for optimizing the Power augmentation and minimizing the outages.
* Planning and Performance Monitoring of Power Plants Operation & maintenance for optimizing the Output at Minimum cost.
* Preparation and planning of O&M Schedules, O&M Budgets, O&M Overhaul works, O&M Spares and Consumables requirements and procurements etc for Optimizing the Output and Minimizing the outages
Employment History (1993-2008)
September'2007 – To- Till to Date.
M/s. Sub-Consortium Sumitomo, Toshiba, GE/GEPSI/GEPSM, 750MW, CCPP, TJPS, Phase-2 of Tenaga Nasional Berhad, Port Dickson, Malaysia.
1. Commissioning In charge (Control & Instrumentation – Gas Turbine) for Commissioning and Operation & Maintenance of 750MW combined cycle, Frame-9FA Gas Turbines at Tenaga Nasional Berhad's Tuanku Jaafar Power Station, Port Dickson, Malaysia.
2. Preparation of Procedures for Commissioning, Operation and Maintenance of 2Nos GE Frame 9FA Gas Turbines, GTG Mark-VI, GTG Auxiliaries, GTG Startup and DLN tuning.
May'2002 – To- September 2007.
M/s. Andhra Pradesh Power Generation Corporation Ltd, 272 MW, COMBINED CYCLE GAS TURBO POWER STATION (O&M Contractor for 272 MW CCPP, AP Gas Power Corporation Limited, Gas Power Plant.)
Assistant Divisional Engineer/ Operations & Maintenance
1. Operations of the 272 MW Combined Cycle Gas Power Plant This includes operations of
(a). 112MW, Frame 9E, GE Gas Turbine -- 1 No.
(b). 33MW, Frame 6B, GE Gas Turbines – 2 Nos
(c). 60 MW GE Steam Turbine – 1 No.
(d). 34MW BHEL Steam Turbine – 1 No.
(e). Deltak HRSG - 1No.
(f). Bharat Heavy Electricals Limited HRSGs -- (2 Nos)
(g). Gas Condition Station, Naptha and HSD Fuel Forwarding System, De-Mineral Water Treatment Plant, SWAS.
(h). 220KV Switch Yard, LT, HT Electrical systems and all other Associated CCPP Auxiliary Systems.
(i). Startup and Shutdown operation of the Power Blocks.
3. Maintenance (Control & instrumentation and Electrical System) of 272 MW, Combined Cycle Gas power Plant. This includes Maintenance of Mark-V Control Loops, Toshiba DCS (TOSMAP) Control Loops, GE Fanuc PLC System, Siemens Simatic PLC system and electrical Systems of the following.
(a). 112MW, Frame 9E, GE Gas Turbine.
(b). 33MW, Frame 6B, GE Gas Turbines.
(c). 60 MW GE Steam Turbine.
(d). 34MW BHEL Steam Turbine.
(e). Deltak HRSG - 1No.
(f). Bharat Heavy Electricals Limited HRSGs -- (2 Nos).
(g). Gas Scrubber, Gas Pre heating Station, Gas Filters, Naptha and HSD Tank and Handling System.
(h). De-Mineral Water Treatment plant
(g). 220KV Switch Yard, Electrical systems and all other Associated CCPP Auxiliary Systems.
4. Carried out Major Inspection, Hot Gas Path Inspection, and Combustion Inspection of the GE Frame-9E Gas Turbine, GE-Frame- 6B Gas Turbines, Major Overhaul of GE Steam Turbine, BHEL Steam Turbine, GE Generators and BHEL Generators.
5. Preparation of Budgetary estimates and revised estimates for Operation & Maintenance of Power Train efficiently and effectively.
6. Carried out Overhauling of the 11/220KV Transformers, 220KV CBs.
7. Carried out Renovation, Testing and Commissioning of 100 MW, Combined Cycle, Stage-1, Unit operation board.
8. Carried out Renovation, Testing and Commissioning of the 220 KV Switch yard cables, Switchyard equipments.
9. Planning the shutdown activities, commercial operations Load cycles, Performance monitoring and implementation of the efficient and economic running methods of the combined Cycle Gas Power Plant.
March'97 – To- May 2002.
M/s. Andhra Pradesh State Electricity Board's, 272 MW, COMBINED CYCLE GAS TURBO POWER STATION (O&M Contractor for 272 MW CCPP, AP Gas Power Corporation Ltd, Gas Power Plant.)
Assistant Engineer/Operation and Maintenance
1. Commissioning of frame 9E 112 MW G.E make Gas Turbine Generator, 60 MW G.E make Steam Turbine Generator, Mark-V System, GE FANUC make PLC and Toshiba make TOSMAP DCS system. Siemens Simatic PLC system.
2. Operations of the 172MW, GTPS, Stage-2, CCPP. This includes Start up operation, Shutdown operations, daily shift operations of Combined Cycle Gas Power Plant.
3. Maintenance (Control & Instrumentation) of 172MW, GTPS, Stage-2, CCPP. This includes maintenance of the following Control Loops.
(a). 112MW, Frame 9E, GE Gas Turbine, Mark-V control Loops
(b). 60 MW GE Steam Turbine, mark-V control Loops.
(c) Deltak HRSG - 1No. Toshiba DCS (TOSMAP) Loops
(d). 3 MW, Black Start DG Set Siemens Simatic PLC System.
(e). DM Plant System GE Fanuc PLC system.
4. Implementation of Automatic Power factor Control System for 112MW, GE Gas Turbine.
5. Designing, Erecting and commissioning of complete hardware back up for the GE Fanuc make PLC System.
6. carried out Major Inspection, Hot Gas Path Inspection, Combustion Inspection of the GE Frame-9E Gas Turbine, GE-Frame-6B Gas Turbine, Major Overhaul of GE Steam Turbine, BHEL Steam Turbine, GE Generators, BHEL Generators.
SEP' 93 - March' 97.
M/s Andhra Pradesh State Electricity Board, 1260 MW, Vijayawada Thermal Power Station.
Assistant Engineer /Operation and Maintenance
1. Operation and Maintenance of 1260 MW, Stage-2, Vijayawada Thermal Power Station Unit, Stage-2 Units.
* This job involves Operations
1. Furnace Safe Guard Supervisory system.
2. Boiler Feed Pump, Drum Level Control.
3. De Super heater and Reheater temp control
4. Automatic Turbine Run up System (ATRS).
5. Soot Blower System
6. Boiler, Coal Mills, ID, PA, FD Fan System.
7. LT and HT Motors and MCCs
* Maintenance of the following Boiler Automatic Control Systems (HITACHI DDC System)
1. Combustion control
2. Furnace draft control
3. Pulverize temp & flow control
4. Fuel oil pressure control
5. 3 Element drum level control
6. Mill level control
7. SH & RH steam temp. control
8. Heavy oil Firing system
9. AC and DC control supply panels.
Training Programmes attended:
* Gas Turbine Operation & Maintenance at GTPS; Vijjeswaram by M/s. General Electric: USA and M/s Sumitomo Corporation, Ltd, Japan.
* Steam Turbine Operation & Maintenance at GTPS; Vijjeswaram by M/s. General Electric: USA and M/s Sumitomo Corporation Ltd, Japan.
* 26 weeks Operation & Maintenance training for Operation of Thermal Power Plants at 1260 MW, VIJAYAWADA THERMAL POWER STATION, APSEB, Training institute as per the Indian Electricity act 1956.
* Two weeks refreshment course on the operation and Maintenance of Thermal Power Stations at Vijayawada Thermal Power Station, APSEB, VTPS Training Institute, Ibrahimpatnam, Vijayawada.
* 2 weeks training program on Instrumentation and Controls of Combined Cycle Gas Power Plant and Thermal Power Plants at VTPS Training Institute.
* First aid & Safety training programme by St. Johns Medical Services, Secunderabad.
* National Institute of Occupational Safety and Health (NIOSH) Training at 750MW, TJPS, Phase-2, CCPP, Port Dickson, Malaysia.
* Construction Industry Development Board Malaysia (CIDB) Training at 750MW, TJPS, Phase-2, CCPP, Port Dickson, Malaysia.
AWARDS:
* Special Incentive by Board of Directors of AP Gas Power Corporation for implementing Auto Power Factor Control in 112MW, GT Mark-V Control System.
* Special Incentive by Board of Directors of AP Gas Power Corporation for saving the 172 MW, Combined Cycle GT unit from tripping during Indian Southern Grid Collapse, and thus first restored the supply to AP Grid for starting other Power units in Andhra Pradesh State in India during this grid collapse.
* Meritorious certificates for speedy and timely completion of various overhaul works in 272 MW, CCPP, GTPS, Vijjeswaram.
* Special Incentive by Andhra Pradesh Power Generation Corporation for Publishing "Operation and Maintenance of 172 MW Combined Cycle Gas Power Plant" Procedure book.
* Meritorious certificate by M/s. Toshiba/GE consortium for speedy commissioning of the Tenaga Nasional Berhad's 750MW, CCPP, Gas Turbine Units at Tuanku Jaafar Power Station, Port Dickson, Malaysia.
Achievements:
* Instrumental in improving the Availability factor of Thermal Power stations of APGENCO and Gas Power Station of APGPCL by computerization and Analysis of Unit outages.
* Achieved availability factor of nearly 98% in a Thermal Power Station and Gas Power Station by promptly weeding problem areas using root cause analysis implementing design modification adopting preventive as well as predictive maintenance on all the equipment.
* A natural leader and supervised the work of groups up to 100 people.
View contact information... |