CONTACT INFORMATION:
View contact information...
From 1991 to 1998: Work-Over and Completion.
Workover supervisor: Intervention on wells having exploitation problems Well Completion, and re-completion
Repair on 7" casing, & set up Casing patch.
Setting Bridge plugs, retrievable, & permanent packers.
Restore cements behind, 7" casing
Fishing, milling, wash-Over pipe, & cleaning out.
RIH Reda & Center-lift Baker Pumps, (Reda pump 444 stages, Baker pump 120 stages)
Change out X-Mass Tree or wellhead.
1998 TO 2001 AT Hassi Messoud Field
From 1998 to 2001: worked at Hass-Messoud oil field as: Snubbing and Completion supervisor where operations were more intense with several of complexity
Completion supervisor: Well Re-completions, (on work-over Rig)
Completion of New Wells (drilling Rig)
Run & set up Bottom Hole Completion, in general liners, pre-perforated liner & slotted liner. The size from 3-1/2" to 5 inch
Snubbing Supervisor:
Supervision of snubbing operations on both small and heavy Rigs, 150000 lbs maximum load for small Rig and 340000 lbs maximum loads for heavy Rig
Run and change completion with small diameters, 1"315, 1"660, 1"900 and 2-3/8'', 2-7/8'' tubing if necessary.
Run and Change Completion of 2-3/8'', 2-7/8, 3-1/2 & 4-1/2" and 5" tubing with heavy Snubbing Rig, ENSP, Algerian company (HK200, HALLIBURTON Rig, & CUDD340) both American companies. Capacity of load @ 200000 lbs min, and 340000 lbs maxi
Fishing, milling, and cleaning out with specifics tools depending on each operation
From 2001 to 2006 included: ( Workover & Snubbing Supervisor)
Supervisor on both Rigs Workover & Hydraulic Snubbing, the job at Elgassi oil field has been a reel challenge including drilling sidetracks, total wells achieved on short and medium radius are 14 wells, and other wells completed and achieved just on simple Workover as re-completion and cleaning out.
The same challenge for snubbing Rig that has been involved on well maintenance and workovers activities including fishing, milling, re-completions and cleanouts. Many of wells were more than 30 years old with very poor documentations.
From 2006 to 2007 included:
Base Manager
I was a Base Manager in Oman, Managing 05 Workover hoists, operating in south for PDO, Petroleum development of Oman and Shell Company.
Duties,
Apply procedures and respect rules of PDO on HSE.
Logistic support for Rigs on fields
Discuss job order or well program with rig manager before rig move to new location
Prepare the MUL (Materiel Utilization list) for the next well, callout for requested materiel as per job order, (well program
Prepare and coordinate the rig move
Covering the position of field superintendent when he is away from the field
Coordinate between the head office, Base workshop and field operations
Manage the Base and different departments, workshop, store, and transport departments
Participate in decision in case of problem, fishing operation, completion or space out,
Run with different pumps in Hole, such as
Pampa Pump /Barrel, (with long and short plunger)
Insert pump,
PCP Pump (progressive cavity pump)
ESP Pump (electrical submersible pump)
The pump ran in hole on Sucker Rod string inside 3 ½" or 4 ½" tubing
From 18/04/2007
Completion & Wire Line Supervisor
Employed at MB petroleum as a field Completion Supervisor: Staying at Occidental company as a completion engineer to run and perform completion operations in Safah field
Also, in Safah & Wadi Latham Fields at Occidental, I have under my controls 03 wire line units to complete wire line activities in Safah & Wadi Latham field.
SUMMARY OF QUALIFICATIONS:
------------
I am speaking & writing both languages, French and English, In addition, I am speaking fluently Arabic language
I 'have got the energy and enthusiasm to get good results
I am used to organizing and planning
I 'have got a good communications skills my experience has given me the opportunity to develop the Sense of communications
Good understanding of French, English & Arabic
Ready to travel & work everywhere
Able to make quality decision
Good knowledge of Computer, windows 2000, Word, Excel & Windows xp, power point, and outlook
OBJECTIVE:
------------
I would like to get a ggod job that will help me to improve my life with my family, also I would bring all my experience in oil field operation, as I can also improve my comptences and share the shallenge for building a good company
------------
WORK EXPERIENCE:
------------
20 years experience
EDUCATION & CERTIFICATION:
------------
May 15, 1993 attended seminar on tubular handling, running & testing, cementing & centralization at HANOVER, West Germany.
September 12 – 23, & f/ December 13 – 25, 1994 attended management courses at Hassi Messoud Naftogaz School, Algeria
November 1-5, 1999 Achieved & completed technical training regarding operating procedures at Weatherford School
In 1999, training with Sonatrach company, about well controls (PEP)
Risk assessment course attended on 02/07/2004.
Safe and defensive driving assessment course attended on 21 & 22/05/2007
Gas detection & confined space entry completed and achieved on 12/05/2005.
Lifting operations & lifting equipment regulations achieved on 27/07/2005.
H2S training concerning procedure applied on wells producing with different concentration on H2S
ADDITIONAL INFORMATION:
------------
active, dynamic, i am happy that my life is OK, Really I am in good health, I am enjoying my business, & my litle family.
View contact information... |