Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #72651
next resume »»
CONTACT INFORMATION:
View contact information...
Career Objective:
To be a part of a technical team in an organization that offers career growth, leadership, team development qualities and enhancement coupled with a challenging job environment.
Professional Experience:
13 years in Materials Department (Since June 12, 1995)
1- Oman Refineries & Petrochemicals Company (ORPC) Since February 27, 2006
Sohar Refinery is one of the largest and latest refineries of Gulf with 116,000 BPD refining capacity. The plant is a process of M/s. UOP & detailed Engineering by JGC.
Working as Warehouse Foreman and involved in:-
„« Joined SRC during construction/commissioning phase and involved in warehouse designing (shelving/racking), applying location system, ordering, data gathering & codification, data loading in system, developing warehouse procedure, implementing Maximo (CMMS), receiving and issuing for two years operational spares as recommended by vendors.
„« Member of committee for establishment warehouse procedures, forms and format inline with CMMS (Maximo).
„« Leading a team for physical inventory count as per ABC Analysis CCF (Cycle Count Frequency). Dealing with auditors for the physical inventory taking.
„« Maintaining chemicals & catalysts buildings as per MSDS and yard to get ready all times to meet the user requirement for smooth process of refinery.
1- AES LalPir Thermal Power Station April 01, 2005 - February 17, 2006
AES is American based one of the world's leading power companies. AES LalPir Thermal Power Station situated in Muzaffargarh with the capacity of 730 MW.
Worked with AES Thermal Power Station as store coordinator (I/C Warehouse). My job responsibilities are as under.
„« Overall incharge of the store related activities like indenting, receiving, inspection, stacking, binning, preservation, issuing, coding, preparation for the annual shutdown and disposal of waste. Lead role in stream lining store operations, introducing and implementing store procedures, trouble shooting in Inventory software (CMMS), renovation and refurbishment of stores, construction of new stores, rationalization of 14,500 inventory items, reporting and coordination with accounts department, etc.
2- Pak-Arab Refinery Limited (PARCO) January 25, 2001 - March 30, 2005
PARCO is the largest oil refinery ever established in Pakistan with 100,000 BPD refining capacity. The plant is a process of M/s. UOP & detailed Engineering by JGC.
Worked with PARCO Mid-Country Refinery Pakistan as Management Executive in Material Department.
2.1 Warehouse Management Executive January 25, 2001 - February 30, 2003
„« Worked as warehouse management executive with Parco.
„« Responsibilities handle the basic warehouse functions, ensuring timely and safe receipt, storage and issue in addition to recording of items. Receive equipment, materials, spare parts, consumables and chemicals in the warehouse, verification of goods received against order specifications. Storing materials and equipment in accordance with manufacturer's instructions for protection and preservation. Ensuring correct labelling in accordance with company's specified systems and procedures Shell's MESC (Material and Equipment Standard and Codes). Ensures require precautions are taken for storage of volatile/inflammatory or sensitive materials as per company's HSE procedure. Monitor the issuance activities to control the errors/discrepancies. Periodically physical verification of inventory by ourselves as per ABC Analysis procedure. Coordinate with internal and external audit teams for the physically stock count of inventory.
2.2 Inventory Control Management Executive March 01, 2003 - March 30, 2005
„« Worked as inventory control management executive with Parco
Responsibilities include standardization and codification of spares according to 10-digits coding scheme Shell's MESC (Material and Equipment Standard and Codes) in MAXIMO-CMMS (Computerized Maintenance Management System). I have catalogued 38000 line items like spares for plant & machinery, electrical & Instrument equipments, valves & fittings, general consumable Items, tools & packing material, chemicals & laboratory items, structure & fasteners, fire & safety items etc. These items are belong to more than 700 main equipments i.e. compressors, turbines, pumps, heat exchangers, vessels & columns, boilers & heaters and Instrument equipments with respect of equipment wise SPIR (Spare Parts Interchangeability Record).
„« Technically review and raise the purchase requisition of new stock items as per user's request. Replenishment of stock items according to ROP (re-order point) and EOQ (economic order quantity), defined by users.
„« Follow up the pending purchase requisitions. Rectify queries receive from vendors through local and foreign procurement section.
„« Technical and commercial evaluation of quotations. Inspection of fresh purchase general items.
„« Planning for the procurement of annual turn around material like spare parts, consumables, chemical & catalyst etc. Collect lists of equipments and spares from Maintenance department, which are finalized for turn around activities. Consolidate them according to nature of material, source of procurement and duration of lead time. Raise the purchase requisitions for in time availability of spares in warehouse, with the correct specifications, in the correct quantities, at the right time, to the right place.
„« Visual study of spare parts and declares for indigenization with the help of maintenance department for easy, economically and efficiently procurement.
„« Budget preparation for the procurement of spare parts.
„« Participate in HSE presentations and social activities in housing complex of our company.
3- DESCON Engineering Limited June 19, 1999 to January 24, 2001
An ISO-9001 certified company involved in designing, planning, construction, commissioning and maintenance jobs all over the world.
Worked as Assistant Store Supervisor at CBS (Central Base Store) in DEW (Descon Engineering Works) Lahore, handling the full responsibilities of spares parts which were centralized controlled at CBS to meet the in time requirement of site stores.
4- Ruwais Refinery (ADNOC) Abu Dhabi UAE April 18, 1999 to June 16, 1999
DESCON Engineering Limited
Management of DESCON assigned me following job responsibilities as Material Assistant for Shutdown of Ruwais Oil Refinery (ADNOC)
„« Received recommended spares from client warehouse before shutdown (i.e. gaskets, studs bolts with nuts, adhesive and packing material etc) and arranged it equipment wise in site store to meet the emergency in time.
„« Coordinated with client warehouse for additional spares as per site requirement.
„« Prepared all documents of material receipt at shut down and raised indents when required.
„« Carried out physical stocktaking of consumables tools and fixed assets at ABS (Abu Dhabi Base Store) after successfully completion of shut down.
5- DESCON Engineering Limited June 12, 1995 to April 17, 1999
Worked with Descon Engineering Ltd. as senior store keeper at CBS (Central Base Store) in DEW (Descon Engineering Works) Lahore, having the following job responsibilities.
„« Operate store function through ledger and company's Work Instruction on the inventory management of E&P (Equipment & Plants) and maintain Min/Max stock levels of standard consumables, loss prevention items and raising the indents where necessary.
„« Familiar with all material management function (receiving, issuing and material handling) according to company's Work Instruction including client warehouse affairs.
„« Receive Indents from site stores related to spares of E&P (Equipment & Plant). Check the interchangeability of spares at all sites and then forward for procurement after insuring the standard of specifications.
„« Managed and have good knowledge of 10-Digits coding scheme for consumables, tools, spares of E&P (Equipment & Plant) and fixed assets.
„« Review aging report of inventory periodically and declaring time-barred components as BER (beyond economical repair) and initiation of their disposal action.
„« Take necessary action for disposal of surplus material and equipments for their gainful deployment/assignment at other project sites.
„« To take physical inventory of Descon's site stores on periodical basis through head office inventory team.
„« To ensure that goods and services provided to project sites and Descon works are a reflection of the company's policy on quality.
„« To ensure that proper safety arrangements exist at store according to Descon's Loss Prevention Policy.
Training:
* Obtained Training for Maximo CMMS from Oratech Pakistan at Pak-Arab Refinery Ltd.
* Obtained Training for ISO 9001, ISO 14001, OHSAS 8001 from SGS at AES Power Plant.
* Obtained Training for Maximo CMMS from Futech Egypt at Sohar Refinery Company
* Obtained Training for MS Project from Polyglot Institute Muscat.
* Obtained Training for MS Office Advance for ICDL Preparation from Polyglot Institute Muscat.
Qualification:
* EMBA in Project Management from Preston University Islamabad, Pakistan.
* Graduation (B.A) from Punjab University Lahore.
* 1 Year Diploma in Fine Arts from Pak-German TTC, Lahore.
* Short course of computer software from Pak Computer College Lahore.
Computer Proficiency:
* MAXIMO - CMMS (Computerized Maintenance Management System)
* MAINSAVER - CMMS (Computerized Maintenance Management System)
* Smart - CMMS (Computerized Maintenance Management System)
* Microsoft Office (MS-Project, MS-Word, MS-Excel, MS-PowerPoint, MS-Office Outlook etc)
References:
Will be provided
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 601 to 650 of 9906)
Go to Search Parameters...
Brief Description
Reliability / Maintenance / Rotating Equipment Engineer with 20+ years of experience in Oil / Gas / Petrochemical / Utility industries.
Senior Project Leader Time and Depth Seismic Processing
NACE Certified,15 Year Experienced Paint Expert
Mechanical engineer graduated in 1991 from Damascus university (machinery department)since that date (15 years experience in oil and gas industry in onshore and offshore)I have been in several companies(SPC,SCOT,Alfurat petroleum co with SHELL in their gas plant.
Ć Interpreting instructions and carrying out policies accurately , MSc in Chemistry
I am a Canadian Geophysicist with some 18 years experience.
Project Management/Operation - Head, BS-CS/18years
Performance driven entrepreneurial procurement specialist with high level of expertise acquired working with one leading blue chip O&G company in Europe. Expatriate experience in Lao PDR.
A proactive and enthusiastic individual with 15 years of extensive expertise in the field of hydrographic surveying, has the ability to work both in a team and individual.
20 years experience in process and laboratory analyzers in refinery and Petrochemicals operations world wide. Graduate degree in analytical chemistry. Willing to relocate.
QA/QC Engineer-International projects-Oil&gas industry
Highly motivated, energetic, hardworking, result oriented QA/QC professional, with Master of Science (Chemistry) who is well organized, flexible and determined to exceed performance standards. Offer a broad technical background with 22 years of profound petrochemical experience.
Pre-commissioning, commissioning, de-commissioning & Re-commissioning of Hydrocarbon tanks/LPG bullet/Double Wall Ethylene tanks & hydrogen bullets(150 kg/cm2) for statutory inspection ,Gas Turbine commissioning, Safety measures in Hydrocarbon storage, loading & handling system, SAP Operation
More than 15 years total experience on combined field in construction, inspection, engineering project management, commissioning and maintenance of instrumentation and control on gas and oil production facilities, geothermal, power, petrochemical and oleo chemical refinery plants. Extensive knowledg
Analyst/Technical Assistance for reservoir/production operations
I have extensive experience as a process engineer in refining and oil production that I would like to put to use in a technical service or economics and planning management position.
Chief Engineer/ Barge Mechanic with work experience more than twenty years incl. 8 years of Offshore (Juck-up's - 5 years). Education: Maritime Academy (five years course). CEng, MIMarEST.
Natural gas/ oil system Simulation and Optimization
B. Sc. ,Industrial safety diploma & environment diploma
Experience in inspection of Reformers, Heaters, Vessels ,columns, Heat Exchangers and piping
Electrical Engineer
Millwright/Industial Mechanic and Power Engineer 3rd class.
Procurement / Administrative
25 years in oil and gas production,constuction,commissioning and start up, very good written and spoken English
25 yr + hand seeking night tour wellsite supervisor slot either land/offshore, shallow/deepwater, underbalaced/hightemp, international/domestic
EDUCATIONL BACKGROUND: Diploma in Electrical Technology.
Science graduate with extensive Supervisory experience in Ammonia and Petrochemical (Ethylene/Sulfur and Formaldehyde) Plant operations/training. With having over 23 years in operations, comfortable working as Supervisor/ Training coach/Co-ordinator/DCS operation, ready to join immediately.
Registered master electrician
HVAC BOILER TECHNICIAN
I have experience of more than 22 years in the field of Power plants (CCGT/COGEN), MSF Desalination plant operations in the middle east (Saudi Arabia, U.A.E. and State of Qatar) and Chemical process industries (Bhabha Atomic Research Centre, Department of Atomic Energy, in India),. Presently working
Drilling Supervisor, Workover Supervision, Concentric Consultanting
Subsea Engineer FPSO Girassol, Subsea Technical Support related to FPSO production (280 Kbpd)
Lead Assessor
Twenty-Eight(28) years of progressive experience in Piping Design with function relevant to all aspects of Font End Engineering and Design, Plant Layouts, Piping Layouts, Isometrics, Material Take Off, Stress Analysis, Procurement and Preparation of Specifications, Plant Modifications, etc.
Joined E & P Company in 1989 and have worked in both onshore and offshore at different positions. As co man supervise operations on Desert Rig deployed for drilling and work over wells. Prior to current assignment worked as co man on jackup rig. Ensure operations are carried out safely & efficiently
All STCW certificates are valid and available
Water-flooding, reserve estimation, production forecasting, economic & risk analyses, reservoir characterization, tracer & pressure transient analyses. Well surveillance for development opportunities. Some thermal experience. Simulation experience to predict performance & optimize development plans.
Over twenty-five years management, technical, and business experience in a multi-national Oil and Gas environment. Several years experience in Indonesia as both Client and Contractor, with extensive experience in LNG. Strong technical background with broad business skills to match.
B.Tech (Mechanical Engg-5years's degree course with SAP experience in Procurement in Oil /Petroleum Refinery in India)
I have graduate degree with EMBA (Project Management) and have 13 years professional experience in material/inventory/warehouse department. Presently I am working with ORPC (Oman Refineries & Petrochemicals Company) at its Sohar Refinery Unit since 27-Feb-06.
piping
Skilled in Storage, Distribution, Scheduling, Warehousing and Material Handling Technology.
NACE CIP Level 2 Certified paint inspector having more than 13 years experience in the field of Technical service, Quality control, production, R&D in paint industry.
i am diploma engineer with university bachler degree in arts having 17 years experience in various projects like cement ,aeronautical and oil&gas and in construction with honeywell on dubai mall project.
Chemical Engineer with 17 years experience in Ethylene plant processs engineering,project,commissioning and operation . Presently working in world's biggest capacity single stream ethylene plant in key position.Looking for exciting opportunity.
Having 20 years of professional experience in various aspects of Detailed Engineering, Pre-bid engineering and Construction supervision & commissioning activities related to Control & Instrumentation (C&I) System for Oil & gas, Refinery, LNG & Petrochemical and power plants.
To optimize the utilization of my technical and personal skills to manage various technical and business operations and to maximize my learning capability to nurture my career to the peak of responsibilities.
Experienced in ASHRAE, SNAME, ISO (15138, 7547, 9943 and 8861), NFPA (70,90A, 90B, 92A, 96 and 496), SMACNA Design Standards, DW (143), AMCA, etc.
Electrical Engineer, Electrical Supervisor, Electrical Instructor, Maintenance Supervisor-Electrical
Oil separation Gas dehydration production and injection and Water treatment and Injection
First
1
2
3
4
5
6
7
8
9
10
11
12
[ 13 ]
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com